Environmental Monitoring Report
__________________________________________
Bi-annual Environment Monitoring Report
January 2015
PAK: Power Distribution Enhancement Investment
Program, Tranche 3
Prepared by Quetta Electric Supply Company, Balochistan for the Asian Development Bank.
NOTES
(i) The fiscal year (FY) of the Government of the Islamic Republic of Pakistan and
its agencies ends on 30 June.
(ii) In this report “$” refer to US dollars.
This social monitoring report is a document of the borrower. The views expressed herein do not
necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be
preliminary in nature.
In preparing any country program or strategy, financing any project, or by making any
designation of or reference to a particular territory or geographic area in this document, the
Asian Development Bank does not intend to make any judgments as to the legal or other status
of any territory or area.
Page 1 of 1
L-2972 PDEIP: QESCO BAEMR (Jul-Dec 2014) approved for disclosure
Safia Shafiq
to: Liaqat Ali
28/01/2015 10:28 AM
Cc:
Adnan Tareen, Zehra Abbas, "Jeffrey Bowyer", Jocelyn M. Cabrera, Judy A. Vermudo, Maria Ava Golda A. Destura, Rizwan Haider
Hide Details
From: Safia Shafiq/Consultants/ADB Sort List... To: Liaqat Ali/PRM/ADB@ADB,
Cc: Adnan Tareen/CWRD/ADB@ADB, Zehra Abbas/CWRD/ADB@ADB, "Jeffrey Bowyer"
<[email protected]>, Jocelyn M. Cabrera/Consultants/ADB@ADB, Judy A.
Vermudo/CWRD/ADB@ADB, Maria Ava Golda A. Destura/CWRD/ADB@ADB, Rizwan Haider/Contractors/ADB@ADB
1 Attachment
QESCO BAEMR (Jul-Dec 2014)-Tranche 3.pdf
Dear Liaqat Sb.,
The attached BAEMR (Jul-Dec 2014) of ggss2 under L-2972 PDEIP is approved for disclosure. Please have it uploaded on ADB's website and share the weblink with me.
Thanks and regards,
Safia Shafiq Environment Specialist (Consultant) Pakistan Resident Mission Asian Development Bank
Level 8, North Wing, Serena Office Complex, Khayaban-e-Suhrawardy G-5, Islamabad, Pakistan. Tel: +92-51-2087300, Ext: 344 Fax: +92-51-2087397-8 & 2600365-6
Cell: +92-333-2154462
file:///ClUsers/alt/AppData/Local/Temp/notesBDE9 I 6/--web9334.htm 28/01/2015
ADB
Bi-annual Environmental Monitoring
Project Number: ADB Loan No. 2972 — Pak Tranche III
Jul - Dec, 2014
Islamic Republic of Pakistan: Power Distribution
Enhancement Investment Programme — Tranche III
(Multitranche Financing Facility)
Prepared by: Environmental and Social Safeguard Section PMU QESCO
Quetta (Pakistan)
This report does not necessarily reflect the views of ADB or the Government concerned, ADB and the Government can not be held liable for its contents.
Asian Development Bank
ABBREVIATIONS
A Augmentation
ADB Asian Development Bank
BPI British Power International
BEPA Balochistan Environmental Protection Agency
BOQs Bill of Quantities
C Conversion
CSC Construction Supervision Consultant
DGS Distribution Grid System
E Extension
EIA Environmental Impact Assessment
EMP Environmental Management Plan
EMS Environmental Management System
EARF Environmental Assessment & Review Framework
SSEMP Social safeguard and Environmental Management Plan
GOP Government of Pakistan
GSC Grid System Construction
HSE Health Safety & Environment
IEE Initial Environmental Examination
LARF Land Acquisition & Resettlement Framework
LARP Land Acquisition & Resettlement Plan
MC&C Monitoring, Controlling & Coordination
MFF Multi Tranche Financing Facility
MM Mitigation Measures
MVA Mega Volts Ampere
PPEs Personal Protection Equipments
PMU Project Management Unit
PDEIP Power Distribution Enhancement Investment Program
PS&C Planning, Scheduling &Coordination
QESCO Quetta Electric Supply Company
STG Secondary Transmission Grid
T/LINE Transmission Line
TABLE OF CONTENTS
1 Part I (INTRODUCTION) Page No.
1.1 Company 1
1.2 Project Management Unit 1
1.3 Detail of Project 1
1.4 Location of the Project 2
1.5 Objective of the Project 2
1.6 Construction activities and progress during previous 6 months of Tranche 3 3
1.7 Scope of Work 3
1.8 Changes in Project Organization and Environmental Management Team 4
1.9 Physical status of project sub project tranche 3 4
1.10 Relationship with Contractors , and owner lenders etc 4
Part II (ENVIRONMENTAL MONITORING) 5
2 Environmental Monitoring Summary 5
Part III (ENVIRONMENTAL MANAGEMENT) 5
3 EMS, SSEMP & Work plan 5
3.1 Site Inspection & Audits 5
3.2 Non Compliances Notices 5
3.3 Issues Covered 5
3.4 Corrective action Plans 5
3.5 Consultation and Complaints 5
3.6 Implementation Report on EIA/IEE Mitigation Requirements of QESCO Sub Projects
6
(ANNEXES & TABLES)
Letter For confirmation from by Baluchistan EPA (Annex A) 7
Organization Chart (Annex B) 8
Lay out Plan of QESCO Subprojects of Tranche 3 (Annex C) 9
Photographs of the Project Site (Annex D) 10-11
(Table No. 1) 3
Asian Development Bank
3
Part 1- Introduction
1.1 Company:-
Quetta Electric Supply Company (QESCO) is a Public Limited Utility
Company, established in 1998 under Companies Ordinance 1984 and is responsible
for distribution of Electric Power to the entire province of Baluchistan excluding
Lasbela district under a Distribution Electric Power within its territorial jurisdiction and
presently serving approximately over 0.5 Million Customers (Domestic. Commercial,
Agricultural, Industrial and others) in the thirty districts of Balochistan.
1.2 Project Management Unit (PMU)
To effectively plan, execute and monitor the project loan No 2972 Power
Distribution Enhancement Investment Program (Tranche-3), a Project Management
Unit (PMU) has already been established under General Manager/Chief Engineer
(Development) comprising of four sections i.e. Planning, Scheduling & Coordination,
Procurement, Finance, and Environment & Social Safeguard along with Project
Director (GSC).
1.3 Detail of Project
Existing conditions of the QESCO power distribution and transmission system
are inadequate to meet rapidly growing demand for electrical power. To cope with
this situation, the existing power infrastructure has to be improved and upgraded. The
overall contribution of power infrastructure requires institutional arrangements,
capacity building that support strategic management of the sector, planning and
management of investments. This Project is to help increase the efficiency, reliability,
and quality of electricity Power in terms of the overall technical and commercial
losses reduction. continuous availability and the improved voltage profile of electricity
The basic information of the ADB loan No. 2972- Pak is here as under:-
ADB Loan Number: 2972 -PAK Tranche-3
Project Title: - Power Distribution Enhancement Investment Program (PDEIP)
1.4 Location of the Project:-
This project covers Construction work of Two 2 Nos. of new double
circuit 132KV Transmission Lines in the jurisdiction of Quetta Electric Supply
Company (QESCO) in 09 Districts of Balochistan that are Quetta, Pashin, Qila
Saifullah, Muslim Bagh, Loralai. khuzdar, Mastung_Manguchar and Kalat.
Borrower:-GOP/ QESCO
Executing Agency:-PEPCO
Implementing Agency:-QESCO
Date of Signing Agreement: 09-09-2013
Date of Effectiveness: 10-12-2013
Date of Loan Closing: 31-12-2016
Date of Last ADB Review Mission: - 17 June, 2014
Amount of Loan: 81.95 Million US$
1.5 Objectives of the Project
QESCO through GOP has undergone a Project Financing agreement with Asian
Development Bank for:
• Strengthening the capacity of Power Distribution and Transmission
networks
• To meet the increasing electricity demand in the selected areas more
efficiently
• To upgrade the existing power infrastructure.
Asian Development Bank
1.6 Construction activities and progress during six 6 months of Tranche Ill
(i) Identification of subprojects
(ii) Preparation of PC 1
(iii) Approval of PC 1 from ADB/PEPCO
(iv) Balochistan Environmental Protection Agency (BEPA) has not yet issued
No Objection Certificate (NOC) to QESCO for Tranche III subprojects under
ADB loan No. 2972-Pak, whilst the EIA Report of Tranche III subprojects is
already submitted to BEPA and letter of admission is received from
Balochistan Environmental Protection Agency vide letter No. DG
(EPA)/5138/2014 dated 02-10-2014 (Annex-A)
1.7 Scope of Work
There are Two 02 Nos. of Turnkey based QESCO 132KV double circuit
transmission lines one from Khuzdar 220KV Grid station to Mastung 132KV
grid station, and second from Loralai 220KV Grid Station to Quetta industrial
Grid Station approved subprojects under Tranche III. The details are as
follows:
1. Procurment of Plant. Design, Supply and installation of 132 KV double circuit transmission lines on ACSR Rail Conductor (267 KM), along with associated (14 Nos.) line bays from Loralai-Muslim Bagh-Khanozai & Pishin-Yaru-Quetta Industrial Grid stations.
Procurment of Plant, Design, Supply and installation of 132 KV double circuit transmission lines on ACSR Rail Conductor (209 KM), along with associated (10 Nos.) line bays from Khuzdar-Surab & Kalat-Mangochar-Mastung Grid stations.
Table 1: ADB APPROVED QESCO TRANCHE Ill SUBPROJECTS
Project
No.
Q1
Q2
Project Name
Installation of 132 KV Double circuit Transmission Line From Khuzdar-surab & Kalat - Mangochar -Mastung
Loralai-Muslimbagh-Khanozai & pishin- Yaru- Quetta Industrial
Quantity of
Projects
Circuit
Length in KM
209
267
Asian Development Bank 6
1.8 PHYSICAL STATUS OF SUB PROJECTS TRANCHE III
Physical work has not been started yet. However, finalizing of route survey is
under process.
1.9 Changes in Project Organization and Environmental Management Team
Environmental and Social officers have been appointed within effective date
but Deputy Manager (E&S) is yet to be appointed. However, the post of Deputy
Manager (E&S) has been upgraded as Manager (E&S). Manager from Civil
Engineering is working on the post of Manager (E&S).
Up to date organization chart is attached as Annexure- B
1.10 Relationships with Contractors, Owner, lenders etc.
The sub projects are at their initial stages and relationship between
contractors, owners and lenders are found excellent. No dispute reported during the
reporting period.
Asian Development Bank 7
Part II Environmental Monitoring
2. Environmental Monitoring Summary:-
The sub project of Transmission lines is at initial stages and no any significant
environmental impact has been observed/reported during the environmental
monitoring, if so that will be recorded and communicated accordingly.
Part Ill Environmental Management
3 EMS, SSEMP and work plans:-
Both the subprojects are at initial stage, therefore EMS, SSEMP and work
plans are ready to be implemented as per EIA Report of subprojects.
3.1 Site Inspection and Audits:-
Site inspections and audits of the sub projects will be performed with the time
and as and when the contractor is mobilized at the site.
3.2 Non-compliance Notices:-
If any environmental impact is observed at construction and operational stage
of subprojects, the non compliance notices will be communicated accordingly.
3.3 Issues Covered:-
No major environmental issue has been observed yet. if reported will be
communicated/ covered accordingly
3.4 Corrective Action Plans:-
If any non-compliance is found during the construction and operation stage of
sub projects the corrective action plan will be prepared.
3.5 Consultation and Cornplaints:-
During the consultation process with stakeholders, no complaints were made.
Asian Development Bank 8
—44 IC,a44-4 lithmankhail)
Director (Tech/Lab)
Letter of EIA Report Submission to Balochistan EPA
OFFICE OF THE DIRECTOR GENERAL BALOCH1STAN
ENVIRONMENTAL PROTECTION AGENCY
GOVERNMENT OF BALOCH1STAN
SAMUNGLI ROAD QUETTA.
Annex A
Office: 081-9201840 Fax: 081-9201180 EmaU: eon baluchistalavahoo.com
No. DG (EPA}/S1 D ited p '2014
To,
/Engr.Baligh uz Zaman
Genaeral Manager (Dev)
PMU QESCO Tel:081-9201750 Fax:081 9201641
Subject:- Submission of EIA Report of QESCO Tranche III subproject
under A DB LAON NO 2972 PAK (TRANCHE-3)
The undersigned is directed to refer to your letter
No.G.M(Dev)/QESCO/PMU/(1470) dated 18-08-2014 regarding the captioned subject
along with schedule- IV and demand draft No.5371848dated 18/08/2014 for Rs: 70000/-
asIEE review lee.
The Initial Environmental P,xamination (LEE) report is complete as per
regulation 9 (a) of the Pakistan Environmental Protection Agency review of 1EE and EIA
regulation 2000.
Therefore after a preliminary scrutiny, this office confirms the initiation of review process.
Copy for information to:
1. P.S to the Director General Environmental Protection Agency, Que.
2. Master File.
Deputy Director (Tech/Lab
ct < cc
C
2 (13 •
< 0
-111111M C C
0
cn
w
2
0
cc
17-
cc
0
(1.6
C U) > 0 a)
w
:E
cz. N
_c Cu Cu
C w
C CZ
C 0 0
Asia
n D
ev
elo
pm
ent B
an
k
KIN
SURA EHRI
BAGHBANA
KHUZDAR
NAL
;TT, DUKI
01. Proposed 132 KV double Circuit T/L form Khuzdar-Surab& Kalat-Manqocher-Mastunq Grid Stations
HURAM ,4--) „. U MUSLIM , . ,,,/'
Al D IC_ZAI M
'' •• B G /". 0 SAW •• •
,..„. _,. .-/ U LA .,.. PISHI
G.H .ZA
LORALAI
........ ..... • _ ■
ARNAI SiKIJAVI DA
W Ki
MAWAND,
Lay out Plan of QESCO Tranche III Subprojects Annex C
.R OUETT t STATION )kV HVDC/ kVHVAC
7- __ Q UT:1E1c:- - -
7:1.4111 :047 *: VVAZ 71.-::p.ABAD
i _0 HAD - -- .........
KUCHA
allb
KAL_A r•'
K1 -D 1--
GHEB vt"
1 - Z.G.JAN'--' /MANGO
CHER DHAC1AR
BHA
UCH - II P/I-e.
CHA MANJ
SHOR R.JAMI
J wiAGso
Q2. Proposed 132 KV double Circuit T/L form Loralai-Muslim Baqh-Khanozai & Pishin-Yaru-Quetta Industrial Grid Stations
Asian Development Bank I I
Annex D
PHOTOGRAPHS OF EXISTING AND PROPOSED SITES FOR 132 KV T/L KHUZDAR-QUETTA
Proposed In and Out for new 32 KV T/L Khuzdar-Quetta
Barren area at proposed new 132 KV T/L Khuzdar-Quetta
Asian Development Bank
12
Proposed Hilly & barren area for new 132 KV T/L Loralai-Quetta
Existing 132 KV T/L Loralai to Quetta
Asian Development Bank 13