11
Handling Goods Safely WSHC Logistics and Transport Forum on Safe Loading 14 Oct 2014 Seet CS, Regional HSE Manager Lim Wei Ming, HSE Lead CEVA Logistics

Handling Goods Safely - Workplace Safety and Health · PDF file · 2014-10-27Handling Goods Safely ... finished goods •One and two man ... • Wheel Choke placed to prevent container

Embed Size (px)

Citation preview

Handling Goods Safely

WSHC Logistics and Transport Forum on Safe Loading 14 Oct 2014 Seet CS, Regional HSE Manager Lim Wei Ming, HSE Lead CEVA Logistics

CEVA in Asia Pacific

Overview

Figures for period ending 31 December 2013

• USD2.3 billion revenue in 2013

• More than 80 CEVA offices across 14 countries

• Close to 300 sites in the region

• Approximately 10,000 employees and 11,000 JV employees

• Control Towers – Supply Chain Solutions control towers in Singapore and Hong Kong

• Asia Pacific Center of Logistics Excellence in Singapore

• One of the top leading logistics player in the region

2 CEVA Logistics

CEVA Logistics 3

Manufacturing support

Inbound Transportation

Warehousing & Distribution

Centers

Outbound Transportation

Aftermarket Services

Final Mile Solution

• Receipt and management of raw materials and products at source

• Control • Re-packaging • Value-added

services

• A range of multi-modal capabilities

• Time definite services

• Customs brokerage

• Web enabled tracking solutions

• Dedicated and shared warehousing

• Distribution network centers

• Value-added services

• Dedicated and/or shared transportation

• CEVA Ground distribution services

• Transportation network management

• Spare parts warehousing

• Spare parts distribution

• Returns • Repairs • Reverse logistics • Call center

services

• Home delivery for finished goods

• One and two man home delivery

• After sales set up • Installation • Reverse logistics

Our Integrated End-to-end Service Portfolio

Teaching Children about Road Safety …

-- 4 -- CEVA Logistics

Improving the idea in Thailand …

CEVA Logistics -- 5 --

Items Falling From Height

CEVA Logistics -- 6 --

• Cargo from 3rd tier and above are firmly secured.

• Secure goods either by shrink wrap or strapping.

Visual Aid Management - Chaining Up Aisle Entrance

CEVA Logistics -- 7 --

• Restricting access to only MHE or Human at any point of time.

• No personnel to enter when MHE is in the aisle.

• Safe Working Load chart displayed at all racks.

Manual Handling

CEVA Logistics -- 8 --

• Employees were trained on Manual Handling Techniques during HSE Induction Course before commencement of work.

• Segregation of goods - Heavy goods placed between shoulder and knee level.

• Weight lifting signage for Men / Women placed in front of cabinets / shelves as guidance.

• Back support issued to employees handling cargoes.

Loading / Unloading from Truck

CEVA Logistics -- 9 --

• Wheel Choke placed to prevent container movement

• Use safe loading / unloading checklist before commencement of activity

• Cargoes loaded into containers have been properly secured

Truck Access – Working-at-Height

CEVA Logistics -- 10 --

Source: http://www.carbissolutions.com00

Source: http://www.carbissolutions.com

-- 11 -- CEVA Logistics