Hydraulic Confinement and In-Situ Bioremediation of a Steel Industrial Area
Cristina SalvadorGeologist
Andréia YoshinariGeologist
Afrânio PessoaChemical Engineering
Member of the
ECOGEO Group
Environmental Consulting
and Engineering
Location and Site History
Location and Site History
Site Assessment
(Hydrogeological Aspects)
Site Assessment
(Soil Quality)
Site Assessment
(Groundwater Quality)
MWs: 79
MMWs: 5
MWs: 79
MMWs: 5
Site Assessment
(Benzene)
Site Assessment
(Ethylbenzene)
Site Assessment
(Naphtalene)
Transport Model Without Action
(Benzene)
Hydraulic Barrier
Remediation Concept
Source ReductionDegradation
PT 04PT 05
PB 01
PT-
04
PT-
05
PMN-02
PO-02
PO-01
Pumping Test Area
PB-01
Pumping Test Area
Rua 1
Pumping Test
(Location)
Pumping Test
(UV Photo-Oxidation Unit)
Pumping Test
(Results)
Radius of Influence of 10 metres
Hydraulic Barrier with 6 Pumping Wells
Flow Rate from 15 to 20 m3 per hour
Biological Potential Test
(Samples)
PM-37 (Upstream)
PM-35, PT-05 e PM-44 (Centre)
PM-48 (Downstream)
PM-37 (Upstream)
PM-35, PT-05 e PM-44 (Centre)
PM-48 (Downstream)
Biological Potential Test
(Results)
Biological Potential Test
(Conclusions)
Area has biological potential for degrading main
contaminants (except PT-05)
Groundwater situation is reductive in centre and
downstream areas
Adjustments in C:N:P are needed to promote biological
degradation
Microcosm Degradation Test
(Sample)
Microcosm Degradation Test
(Laboratory)
Microcosm Degradation Test
(Results)
Microcosm Degradation Test
(Conclusions)
Degradation test show a very effective turnover
99,9% degraded in less than 14 days
Degradation in test series is correlated with the increase of
degrading bacterias
Abiotic degradation effects took place in the control series
only in the first 14 days of operation
12 m
³/day
Nutrient Dispersion Model20 wells20 wells
24 m
³/day
6 months 12 months
12 m
³/day
10 wells10 wells
24 m
³/day
6 months 12 months
Nutrient Dispersion Model
10 wells10 wells
6 m
³/day
6 months 12 months
8 + 3 wells8 + 3 wells6 months 12 months
6 m
³/day
Hydraulic Barrier System
(Flowchart)
Aerobic Bioremediation System
(Flowchart)
2 y
ears
4 y
ears
1 y
ear
Scenarios for
RemediationWithout Action With Action (HB) With Action (HB + BIO)
Acknowledgements
Client
Public Authorities