NTS KEY PLAN KEY PLAN AREA OF WORK EXISTING ELECTRICAL PANEL SQUARE D #NQOD454L225CU 225A, 120/240V, 3PH, 4W 54 CCTS 12x8 8"Ø 12x8 RA SA SUPPLY AIR RETURN AIR DUCT SIZE, RECTANGULAR, ELBOW, RECTANGULAR(r=1.5W) ACOUSTICAL INSULATION LINING HVAC LEGEND DUCT SIZE, ROUND DUCT SECTION, SUPPLY DUCT SECTION, RETURN OR EXHAUST FIRST FIGURE IS SIDE SHOWN EA EXHAUST AIR ACOUSTICAL INSULATION LINING TEE, RECTANGULAR MAIN AND TAP, FOT - FLAT ON TOP, FOB - FLAT ON BOTTOM TEE, RECTANGULAR MAIN AND TAP TEE RECTANGULAR TRANSITIONS WITH DAMPER WYE, RECTANGULAR TYPE CFM SIZE CEILING OR REGISTER DESIGNATION CEILING RETURN GRILLE FD WALL SUPPLY GRILLE OR REGISTER FIRE DAMPER WALL EXHAUST/RETURN GRILLE OF REGISTER CEILING SUPPLY DIFFUSER 24"x24" 'S1' 100 T THERMOSTAT MECHANICAL NOTES MECHANICAL DRAWINGS SHALL BE READ IN CONJUNCTION WITH ALL OTHER DRAWINGS FOR THIS PROJECT. 1 GENERAL: .1 CONFORM WITH APPLICABLE REQUIREMENTS OF THE MINISTRY OF LABOUR, AND THE OCCUPATIONAL HEALTH AND SAFETY ACT AND REGULATIONS FOR CONSTRUCTION PROJECTS. .2 DO COMPLETE INSTALLATION IN ACCORDANCE WITH THE FOLLOWING: .1 ONTARIO BUILDING CODE (OBC); .2 NATURAL GAS AND PROPANE INSTALLATION CODE (GAS CODE)/INSTALLATION CODE FOR OIL BURNING EQUIPMENT; .3 ASHRAE; .4 SMACNA; .5 NFPA; .6 ALL OTHER RELEVANT CODES AND STANDARDS, AS APPLICABLE. .3 OBTAIN ALL PERMITS REQUIRED FOR THE INSTALLATION OF MECHANICAL TRADES WORK, ARRANGE FOR INSPECTIONS AND TESTS, AND PAY ALL FEES AND COSTS FOR THE PERMITS, INSPECTIONS AND FEES. OBTAIN PERMITS IMMEDIATELY AFTER NOTIFICATION OF AWARD OF CONTRACT. .4 PROVIDE THREE COPIES OF COMPLETE OPERATING AND MAINTENANCE INSTRUCTIONS FOR EQUIPMENT FURNISHED UNDER THIS CONTRACT. BIND INSTRUCTIONS IN 3-RING BINDERS. INCLUDE THE FOLLOWING: .1 SCHEMATIC DIAGRAM OF ELECTRICAL SYSTEMS. .2 CONTROL SHOP DRAWINGS AND OPERATING SEQUENCE INCLUDING WIRING OF COMPONENTS. .3 WIRING DIAGRAM OF CONTROL PANELS. .4 OPERATING INSTRUCTIONS, INCLUDING START-UP AND SHUT-DOWN PROCEDURE. .5 MAINTENANCE INSTRUCTIONS INCLUDING PREVENTIVE MAINTENANCE INSTRUCTIONS FOR COMPONENTS OF THE EQUIPMENT. .6 COMPLETE PARTS LIST OF ASSEMBLIES AND THEIR COMPONENT PARTS, SHOWING MANUFACTURER'S NAME, CATALOGUE NUMBER, AND NEAREST REPLACEMENT SOURCE. .7 LIST OF RECOMMENDED SPARE PARTS AND QUANTITY OF EACH ITEM TO BE STOCKED. .8 MANUFACTURERS' WARRANTIES AND GUARANTEES. .5 CLEAN ALL MECHANICAL SYSTEMS AT PROJECT COMPLETION. .6 COMPLETE AS-BUILT DRAWINGS SHOWING ALL CHANGES AS WORK PROGRESSES. 2 CONTRACTOR QUALIFICATIONS: .1 ALL WORK TO BE CARRIED OUT IN ACCORDANCE WITH THE “TRADE QUALIFICATION AND APPRENTICESHIP ACT” AND REGULATIONS, BY PERSONS WHO HOLD THE FOLLOWING CERTIFICATES OF QUALIFICATION (AS APPLICABLE): .1 REFRIGERATION & AIR CONDITIONING SYSTEMS MECHANIC; .2 RESIDENTIAL AIR CONDITIONING SYSTEMS MECHANIC; .3 SHEET METAL WORKER. .2 ALL FUELS-RELATED WORK TO BE CARRIED OUT IN ACCORDANCE WITH TSSA REQUIREMENTS AND ONTARIO REGULATION 215/01, “FUEL INDUSTRY CERTIFICATES” BY PERSONS WHO HOLD THE APPROPRIATE CERTIFICATES FOR THE WORK BEING PERFORMED. 3 EXISTING FACILITIES AND DEMOLITION: .1 LOCATE AND PROTECT ALL EXISTING EXTERIOR SITE SERVICES. .2 RETAIN AND PROTECT ALL EXISTING INTERIOR SERVICES AND BUILDING FABRIC. MAKE GOOD ANY AND ALL DAMAGE RESULTING FROM THIS WORK. .3 CONNECTIONS TO EXISTING SERVICES SHALL BE COORDINATED WITH THE OWNER. .4 EXECUTE WORK WITH LEAST POSSIBLE INTERFERENCE OR DISTURBANCE TO NORMAL USE OF THE EXISTING BUILDING. .5 DESIGNATED SUBSTANCES: .1 DESIGNATED SUBSTANCES SHALL BE TREATED IN ACCORDANCE WITH THE REQUIREMENTS OF THE OCCUPATIONAL HEALTH AND SAFETY ACT AND REGULATIONS. .2 SHOULD ANY DESIGNATED SUBSTANCES BE ENCOUNTERED IN THE AREA OF CONSTRUCTION, ALL WORK SHALL STOP IMMEDIATELY, AND THE OWNER AND ENGINEER SHALL BE NOTIFIED IMMEDIATELY. .3 IF APPLICABLE, ASBESTOS REMOVAL SHALL BE COMPLETED IN ACCORDANCE WITH THE OCCUPATIONAL HEALTH AND SAFETY ACT AND ONTARIO REGULATION 278 “DESIGNATED SUBSTANCE - ASBESTOS ON CONSTRUCTION PROJECTS AND IN BUILDINGS AND REPAIR OPERATIONS”. .6 DISPOSAL OF MATERIALS: .1 REMOVE AND DISPOSE OF ALL WASTE MATERIALS. .2 RECYCLE MATERIALS WHERE POSSIBLE. .3 HANDLE WASTE MATERIALS NOT REUSED, SALVAGED, OR RECYCLED IN ACCORDANCE WITH APPROPRIATE REGULATIONS AND CODES. .4 DO NOT BURY RUBBISH OR WASTE MATERIALS, OR DISPOSE OF MATERIALS INTO WATERWAYS, STORM, OR SANITARY SEWERS. .5 KEEP RECORDS OF CONSTRUCTION WASTE INCLUDING NUMBER AND SIZE OF BINS, WASTE TYPE OF EACH BIN, TOTAL TONNAGE GENERATED, TONNAGE REUSED OR RECYCLED, REUSED OR RECYCLED WASTE DESTINATION. .6 REMOVE MATERIALS FROM DECONSTRUCTION AS DECONSTRUCTION/DISASSEMBLY WORK PROGRESSES. .7 PREPARE PROJECT SUMMARY TO VERIFY DESTINATION AND QUANTITIES ON A MATERIAL_BY_MATERIAL BASIS. 4 FIXTURES AND EQUIPMENT: .1 PROVIDE SHOP DRAWINGS AND PRODUCT DATA FOR ALL MECHANICAL FIXTURES AND EQUIPMENT FOR APPROVAL, PRIOR TO PROCUREMENT. .2 INSTALL ALL MECHANICAL FIXTURES AND EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS. .3 LOCATE ALL EQUIPMENT WITH CLEARANCES, AS REQUIRED BY THE MANUFACTURER, THE FUEL CODES, AND ALL OTHER CODES AND REGULATIONS, INCLUDING THE FOLLOWING CLEARANCES: .1 TO PERMIT PROPER EQUIPMENT OPERATION; .2 TO PERMIT SUFFICIENT AIRFLOW AROUND EQUIPMENT; .3 FOR EQUIPMENT SERVICE; .4 SUFFICIENT DISTANCE FROM COMBUSTIBLE MATERIAL; .5 WITH SUFFICIENT VENT CLEARANCES; .6 SUFFICIENT DISTANCE FROM ROOF EDGES OR OTHER HAZARDS. 5 ACCESS DOORS: .1 SUPPLY ACCESS DOORS, AS REQUIRED IN DUCTWORK AND WALL/CEILING ASSEMBLIES, TO ALL CONCEALED MECHANICAL EQUIPMENT AND OPERATING DEVICES. ACCESS DOORS IN WALL/CEILING ASSEMBLIES TO BE INSTALLED BY OTHER TRADES. .2 ACCESS DOORS SHALL BE FIRE-RATED TYPE, WHERE USED IN FIRE-RATED ASSEMBLIES, AND SHALL MATCH THE RATING OF THE ASSEMBLY. 6 NATURAL GAS PIPING: .1 STEEL PIPE, SCHEDULE 40, SEAMLESS, SCREWED FITTINGS. .2 SLOPE PIPING DOWN IN DIRECTION OF FLOW TO LOW POINTS. .3 TEST SYSTEM IN ACCORDANCE WITH NATURAL GAS AND PROPANE INSTALLATION CODE. 7 DUCTWORK: .1 RECTANGULAR DUCT: .1 RIGID GALVANIZED STEEL, LOCK FORMING QUALITY TO ASTM A653/A653M .2 THICKNESS, FABRICATION, REINFORCEMENT AND SUPPORT/ATTACHMENT TO ASHRAE OR SMACNA. .2 ROUND DUCT: .1 RIGID GALVANIZED STEEL, LOCK FORMING QUALITY TO ASTM A653/A653M .2 THICKNESS, FABRICATION, REINFORCEMENT AND SUPPORT/ATTACHMENT TO ASHRAE OR SMACNA. .3 SEAL CLASSIFICATION: .1 CLASS A: LONGITUDINAL SEAMS, TRANSVERSE JOINTS, DUCT WALL PENETRATIONS AND CONNECTIONS MADE AIRTIGHT WITH SEALANT AND TAPE. .4 FITTINGS .1 FABRICATION: TO SMACNA. .2 RADIUSED ELBOWS. .1 RECTANGULAR: STANDARD WITH CENTRELINE RADIUS 1.5 TIMES DUCT DIMENSION, WITH SINGLE THICKNESS TURNING VANES. .2 ROUND: FIVE PIECE WITH CENTRELINE RADIUS 1.5 TIMES DIAMETER. .3 MITRED ELBOWS, RECTANGULAR: WITH DOUBLE THICKNESS TURNING VANES. .5 BRANCHES: .1 RECTANGULAR MAIN AND BRANCH: WITH RADIUS ON BRANCH 1.5 TIMES WIDTH OF DUCT 45 DEGREES ENTRY ON BRANCH. .2 ROUND MAIN AND BRANCH: ENTER MAIN DUCT AT 45 DEGREES WITH CONICAL CONNECTION. .3 PROVIDE VOLUME CONTROL DAMPER IN BRANCH DUCT NEAR CONNECTION TO MAIN DUCT. .6 TRANSITIONS: .1 DIVERGING: 20 DEGREES MAXIMUM INCLUDED ANGLE. .2 CONVERGING: 30 DEGREES MAXIMUM INCLUDED ANGLE. .7 FIRE STOPPING .1 RETAINING ANGLES AROUND DUCT, ON BOTH SIDES OF FIRE SEPARATION IN ACCORDANCE WITH SECTION. .2 FIRE STOPPING MATERIAL AND INSTALLATION MUST NOT DISTORT DUCT. .8 DAMPERS: .1 MANUFACTURE TO SMACNA STANDARDS. .2 SINGLE BLADE DAMPERS: .1 FABRICATE FROM SAME MATERIAL AS DUCT, BUT ONE SHEET METAL THICKNESS HEAVIER. V_GROOVE STIFFENED. .2 SIZE AND CONFIGURATION TO RECOMMENDATIONS OF SMACNA. .3 LOCKING QUADRANT (WITH SHAFT EXTENSION TO ACCOMMODATE INSULATION THICKNESS, IF REQUIRED). .4 INSIDE AND OUTSIDE NYLON END BEARINGS. .5 CHANNEL FRAME OF SAME MATERIAL AS ADJACENT DUCT, COMPLETE WITH ANGLE STOP. .9 DUCT LEAKAGE: IN ACCORDANCE WITH SMACNA HVAC AIR DUCT LEAKAGE TEST MANUAL. .10 ALL DUCT AND SEAL MATERIALS TO HAVE A FLAME SPREAD RATING OF LESS THAN 25 AND A SMOKE DEVELOPED CLASSIFICATION OF LESS THAN 50. .11 PROVIDE FLEXIBLE CONNECTIONS AT ALL EQUIPMENT DUCT CONNECTION POINTS. 8 DUCT INSULATION: .1 REFER TO DRAWING FOR DUCT THAT IS IDENTIFIED TO BE INSULATED. .2 INSTALL IN ACCORDANCE WITH THERMAL INSULATION ASSOCIATION OF CANADA (TIAC) NATIONAL STANDARDS. .3 MAX. FLAME SPREAD RATING: 25. .4 MAX. SMOKE DEVELOPED RATING: 50. .5 ACOUSTIC DUCT LINING: .1 1” (R4.3) ACOUSTIC QUALITY MINERAL FIBRE DUCT LINER, WITH MAT FACING, BACTERIA AND FUNGUS RESISTANT. .2 FASTEN TO INTERIOR SHEET METAL SURFACE WITH 100% COVERAGE OF ADHESIVE AND 5/16” WELD PINS NOT LESS THAN 2 ROWS PER SURFACE AND NOT MORE THAN 16 IN ON CENTRES. .3 SEAL BUTT JOINTS, EXPOSED EDGES, WELD PIN AND CLIP PENETRATIONS AND DAMAGED AREAS OF LINER WITH 2” JOINT TAPE AND SEALER. 9 MECHANICAL FIRE PROTECTION: .1 REFER TO ARCHITECTURAL DRAWINGS, TO VERIFY LOCATION OF ALL FIRE SEPARATIONS AND FIRE-RATED MEMBRANES. .2 ALL PIPING SHALL BE TIGHTLY FITTED AND SEALED WITH FIRESTOPPING MATERIAL AT ALL FIRE SEPARATIONS AND FIRE-RATED MEMBRANES. .3 FIRE DAMPERS: .1 FIRE DAMPERS SHALL BE CAN/ULC-S112 (STANDARD METHOD OF FIRE TEST OF FIRE DAMPER ASSEMBLIES) LISTED AND LABELLED. .2 FIRE DAMPERS SHALL BE NFPA 80 (STANDARD FOR FIRE DOORS AND OTHER OPENING PROTECTIVES), NFPA 90A (STANDARD FOR THE INSTALLATION OF AIR-CONDITIONING AND VENTILATING SYSTEMS), AND NFPA 101 (LIFE SAFETY CODE) COMPLIANT. .3 DUCTWORK SHALL BE FITTED WITH FIRE DAMPERS AT ALL FIRE SEPARATIONS AND FIRE-RATED MEMBRANES. .4 SUPPLY AND INSTALL ACCESS DOORS IN ARCHITECTURAL FINISH (WALL, CEILING OR FLOOR) TO ACCESS DUCT, IN COMMON AREA WHERE POSSIBLE. .5 SUPPLY AND INSTALL TIGHTLY-FITTED ACCESS DOOR IN DUCT TO ACCESS, INSPECT AND RESET FIRE DAMPER. .4 FIRE DAMPER AND DUCT SHALL BE INSTALLED IN ACCORDANCE WITH MANUFACTURERS REQUIREMENTS, AND SHALL BE SEALED WITH FIRESTOPPING MATERIAL. .5 ALL MECHANICAL MATERIALS USED WITHIN CEILING RETURN AIR PLENUMS SHALL FLAME-SPREAD RATING NOT MORE THAN 25 AND SMOKE DEVELOPED CLASSIFICATION NOT MORE THAN 50 PER CAN/ULC-S102.2. .6 MOCK-UPS: .1 PREPARE MOCK-UPS OF TYPICAL FIRESTOP INSTALLATION OF THE FOLLOWING, FOR REVIEW AND APPROVAL BY THE OWNER, ENGINEER AND MUNICIPAL BUILDING INSPECTOR. .2 ALL FIRESTOP INSTALLATIONS SHALL BE COMPLETED IN ACCORDANCE WITH THE APPROPRIATE PRODUCT INSTALLATION INSTRUCTIONS, AND THE REFERENCED UL/ULC LISTING AND/OR TEST STANDARD. .3 SUPPLY A COPY OF THE PRODUCT INSTALLATION INSTRUCTIONS WITH ULC LISTING AND/OR TEST STANDARD REFERENCE, FOR EACH INSTALLATION. .4 MOCK-UP MAY REMAIN AS PART OF WORK. 10 EARTHQUAKE LOAD: .1 ALL MECHANICAL WORK SHALL BE COMPLETED IN ACCORDANCE WITH THE EARTHQUAKE LOAD AND EFFECTS REQUIRED BY THE ONTARIO BUILDING CODE. .2 MECHANICAL ELEMENTS AND COMPONENTS (EQUIPMENT, PIPES, DUCTS, ETC.), AND THEIR CONNECTIONS TO THE BUILDING SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE SMACNA/ANSI SEISMIC RESTRAINT MANUAL OR OTHER GUIDELINE REFERENCED IN THE ONTARIO BUILDING CODE. 11 EQUIPMENT AND MATERIALS SUPPORT: .1 ALL MECHANICAL EQUIPMENT, PIPING, DUCTWORK, AND RELATED ITEMS SHALL BE SECURELY SUPPORTED, ATTACHED AND FASTENED TO BUILDING STRUCTURE. .2 PIPE HANGERS AND SUPPORTS SHALL BE FABRICATED AND INSTALLED IN ACCORDANCE WITH MSS STANDARD SP-58, PIPE HANGERS AND SUPPORTS - MATERIALS, DESIGN, MANUFACTURE, SELECTION, APPLICATION, AND INSTALLATION. .3 PLATFORMS SHALL BE FABRICATED FROM STRUCTURAL GRADE STEEL MEETING THE REQUIREMENTS OF THE ONTARIO BUILDING CODE, INCLUDING CSA STANDARD W59 WELDED STEEL CONSTRUCTION, AND THE REQUIREMENTS OF THE CANADIAN WELDING BUREAU. 12 COORDINATION: .1 INFORMATION INVOLVING ACCURATE DIMENSIONING OF THE BUILDING SHALL BE TAKEN FROM SITE BY CONTRACTOR. .2 DRAWINGS ARE IN DIAGRAMMATIC FORM, INTENDED TO CONVEY THE SCOPE OF WORK AND GENERAL ARRANGEMENT FOR EQUIPMENT. COORDINATE PHYSICAL LOCATION OF ALL EQUIPMENT WITH OTHER TRADES AND ALLOW FOR ANY ADDITIONAL PIPING, DUCTING, FITTINGS, SUPPORTS, ETC., IN ORDER TO AVOID INTERFERENCE AND FACILITATE THE WORK. .3 CONTRACTOR TO MAKE ANY NECESSARY MODIFICATIONS OR ADDITIONS, WITHOUT CHARGE, TO ACCOMMODATE SITE CONDITIONS AND COORDINATION. .4 COORDINATE ALL MECHANICAL EQUIPMENT WIRING, INCLUDING LOW VOLTAGE CONTROL WIRING, WITH ELECTRICAL TRADES. 13 START-UP, COMMISSIONING AND TRAINING: .1 COMMISSIONING: .1 START-UP AND COMMISSION THE FOLLOWING SYSTEMS: .1 HVAC. .2 PERFORM SYSTEMATIC TESTS, PROCEDURES AND CHECKS ON SYSTEMS, AS FOLLOWS: .1 TO VERIFY OPERATION IN ACCORDANCE WITH CONTRACT DOCUMENTS, DESIGN CRITERIA AND INTENT, AND MANUFACTURER'S REQUIREMENTS; .2 TO ENSURE APPROPRIATE DOCUMENTATION IS PROVIDED; .3 TO EFFECTIVELY TRAIN BUILDING OPERATIONAL STAFF. .3 SYSTEMS ARE TO BE OPERATED AT FULL CAPACITY, WITH CORRECTION OF ALL DEFICIENCIES AND ADJUSTMENTS TO MEET OPTIMUM PERFORMANCE. .4 PROVIDE WRITTEN REPORT AT END OF COMMISSIONING OUTLINING EQUIPMENT OPERATIONAL CONDITIONS AND PARAMETERS. .2 TESTING, ADJUSTING AND BALANCING: .1 TEST, ADJUST AND BALANCE (TAB) ALL PLUMBING AND HVAC EQUIPMENT AND SYSTEMS; INCLUDING THE FOLLOWING: .1 FURNACES; .2 CONDENSING UNITS; .3 HEAT RECOVERY VENTILATORS. .2 TAB PROCEDURE SHALL BE COMPLETED IN ACCORDANCE WITH ASHRAE STANDARD 111, MEASUREMENT, TESTING, ADJUSTING AND BALANCING OF BUILDING HVAC SYSTEMS. .3 PROVIDE DETAILED REPORT AT END OF TAB, IN ACCORDANCE WITH THE REPORTING PROCEDURES OF ASHRAE STANDARD 111. .3 DEMONSTRATION AND TRAINING: .1 DEMONSTRATE OPERATION AND MAINTENANCE OF EQUIPMENT AND SYSTEMS TO OWNER'S PERSONNEL ONE WEEK PRIOR TO DATE OF FINAL INSPECTION .2 PRIOR TO DEMONSTRATION AND TRAINING, ENSURE THAT EQUIPMENT HAS BEEN INSPECTED AND PUT INTO OPERATION, INCLUDING COMPLETION OF COMMISSIONING AND TESTING, ADJUSTING, AND BALANCING. .3 DEMONSTRATE START_UP, OPERATION, CONTROL, ADJUSTMENT, TROUBLE_SHOOTING, SERVICING, AND MAINTENANCE OF EACH ITEM OF EQUIPMENT. .4 INSTRUCT PERSONNEL IN PHASES OF OPERATION AND MAINTENANCE USING OPERATION AND MAINTENANCE MANUALS AS BASIS OF INSTRUCTION. REVIEW CONTENTS OF MANUAL IN DETAIL TO EXPLAIN ASPECTS OF OPERATION AND MAINTENANCE. ELECTRICAL NOTES ELECTRICAL DRAWINGS SHALL BE READ IN CONJUNCTION WITH ALL OTHER DRAWINGS FOR THIS PROJECT. 1 GENERAL: .1 CONFORM WITH APPLICABLE REQUIREMENTS OF THE MINISTRY OF LABOUR, AND THE OCCUPATIONAL HEALTH AND SAFETY ACT AND REGULATIONS FOR CONSTRUCTION PROJECTS. .2 DO COMPLETE INSTALLATION IN ACCORDANCE WITH THE FOLLOWING: .1ONTARIO ELECTRICAL SAFETY CODE; .2ELECTRICAL SAFETY AUTHORITY. .3 SUBMIT TO ELECTRICAL SAFETY AUTHORITY NECESSARY NUMBER OF DRAWINGS AND SPECIFICATIONS FOR APPROVAL PRIOR TO COMMENCEMENT OF WORK. .4 PAY ALL ELECTRICAL PERMIT AND INSPECTION FEES. .5 GROUND COMPLETE SYSTEM IN ACCORDANCE WITH THE ONTARIO ELECTRICAL SAFETY CODE AND ELECTRICAL SAFETY AUTHORITY. .6 IDENTIFICATION AND LABELLING: .1 IDENTIFY ELECTRICAL EQUIPMENT WITH LAMICOID NAMEPLATES, INCLUDING AMPERAGE, VOLTAGE, PHASE AND POWER SOURCE. .2 PROVIDE TYPEWRITTEN PANEL DIRECTORIES. .7 PROVIDE THREE COPIES OF COMPLETE OPERATING AND MAINTENANCE INSTRUCTIONS FOR EQUIPMENT FURNISHED UNDER THIS CONTRACT. .8 CLEAN ALL ELECTRICAL SYSTEMS AT PROJECT COMPLETION. .9 COMPLETE AS-BUILT DRAWINGS SHOWING ALL CHANGES AS WORK PROGRESSES. 2 CONTRACTOR QUALIFICATIONS: .1 ALL WORK TO BE CARRIED OUT IN ACCORDANCE WITH THE “TRADES QUALIFICATION AND APPRENTICESHIP ACT” AND REGULATIONS, BY PERSONS WHO HOLD THE FOLLOWING CERTIFICATES OF QUALIFICATION (AS APPLICABLE): .1 ELECTRICIAN: CONSTRUCTION & MAINTENANCE; .2 ELECTRICIAN: DOMESTIC & RURAL. 3 EXISTING FACILITIES AND DEMOLITION: .1 LOCATE AND PROTECT ALL EXISTING EXTERIOR SITE SERVICES. .2 RETAIN AND PROTECT ALL EXISTING INTERIOR SERVICES AND BUILDING FABRIC. MAKE GOOD ANY AND ALL DAMAGE RESULTING FROM THIS WORK. .3 CONNECTIONS TO EXISTING SERVICES SHALL BE COORDINATED WITH THE OWNER. .4 EXECUTE WORK WITH LEAST POSSIBLE INTERFERENCE OR DISTURBANCE TO NORMAL USE OF THE EXISTING BUILDING. .5 DESIGNATED SUBSTANCES: .1 DESIGNATED SUBSTANCES SHALL BE TREATED IN ACCORDANCE WITH THE REQUIREMENTS OF THE OCCUPATIONAL HEALTH AND SAFETY ACT AND REGULATIONS. .2 SHOULD ANY DESIGNATED SUBSTANCES BE ENCOUNTERED IN THE AREA OF CONSTRUCTION, ALL WORK SHALL STOP IMMEDIATELY, AND THE OWNER AND ENGINEER SHALL BE NOTIFIED IMMEDIATELY. .3 IF APPLICABLE, ASBESTOS REMOVAL SHALL BE COMPLETED IN ACCORDANCE WITH THE OCCUPATIONAL HEALTH AND SAFETY ACT AND ONTARIO REGULATION 278 “DESIGNATED SUBSTANCE - ASBESTOS ON CONSTRUCTION PROJECTS AND IN BUILDINGS AND REPAIR OPERATIONS”. .6 DISPOSAL OF MATERIALS: .1 REMOVE AND DISPOSE OF ALL WASTE MATERIALS. .2 RECYCLE MATERIALS WHERE POSSIBLE. .3 HANDLE WASTE MATERIALS NOT REUSED, SALVAGED, OR RECYCLED IN ACCORDANCE WITH APPROPRIATE REGULATIONS AND CODES. .4 DO NOT BURY RUBBISH OR WASTE MATERIALS, OR DISPOSE OF MATERIALS INTO WATERWAYS, STORM, OR SANITARY SEWERS. .5 KEEP RECORDS OF CONSTRUCTION WASTE INCLUDING NUMBER AND SIZE OF BINS, WASTE TYPE OF EACH BIN, TOTAL TONNAGE GENERATED, TONNAGE REUSED OR RECYCLED, REUSED OR RECYCLED WASTE DESTINATION. .6 REMOVE MATERIALS FROM DECONSTRUCTION AS DECONSTRUCTION/DISASSEMBLY WORK PROGRESSES. .7 PREPARE PROJECT SUMMARY TO VERIFY DESTINATION AND QUANTITIES ON A MATERIAL_BY_MATERIAL BASIS. 4 FIXTURES AND EQUIPMENT: .1 INSTALL ALL ELECTRICAL FIXTURES AND EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS. .2 EQUIPMENT AND MATERIAL TO BE CSA CERTIFIED. WHERE THERE IS NO ALTERNATIVE TO SUPPLYING EQUIPMENT WHICH IS NOT CSA CERTIFIED, OBTAIN SPECIAL APPROVAL FROM ELECTRICAL SAFETY AUTHORITY. 5 EQUIPMENT SUPPLIED BY OTHERS: .1 MAKE ALL ELECTRICAL SERVICE CONNECTIONS TO EQUIPMENT SUPPLIED BY OTHERS. .2 CONFIRM ALL SERVICE CONNECTIONS WITH MANUFACTURER AND SUPPLIER, PRIOR TO INSTALLATION. THIS SHALL INCLUDE ALL CONNECTION SIZES, LOCATIONS AND DETAILS, AND SHALL TAKE INTO ACCOUNT EQUIPMENT CLEARANCES AND INSTALLATION REQUIREMENTS. 6 CONDUITS: .1 ELECTRICAL METALLIC TUBING (EMT), HOT DIPPED GALVANIZED STEEL, WITH THREADED CONNECTORS AND COUPLINGS, WHERE NOT SUBJECT TO MECHANICAL INJURY, IN SERVICE AREAS ONLY. 7 WIRES AND CABLE: .1 VOLTAGE DROP: .1 BRANCH CIRCUIT CONDUCTORS SHALL BE SIZED FOR A MAXIMUM VOLTAGE DROP OF 3% AT DESIGN LOAD. .2 BUILDING WIRES IN CONDUIT SYSTEMS TO BE STRANDED COPPER CONDUCTORS FOR 10 AWG AND LARGER, MINIMUM SIZE 12 AWG, TYPE RW90. .3 BUILDING WIRES IN CONCEALED LOCATIONS TO BE COPPER, MINIMUM SIZE 12 AWG, TYPE AC90. .4 ALL WIRING SHALL BE CONCEALED IN WALLS AND CEILINGS, UNLESS OTHERWISE NOTED OR APPROVED. SURFACE-MOUNTED WIRING IS NOT PERMITTED. 8 FIRE PROTECTION: .1 ALL CABLING AND CONDUIT SHALL BE TIGHTLY FITTED AND SEALED WITH FIRESTOPPING MATERIAL AT ALL FIRE SEPARATIONS AND FIRE-RATED MEMBRANES. 9 EARTHQUAKE LOAD: .1 ALL ELECTRICAL WORK SHALL BE COMPLETED IN ACCORDANCE WITH THE EARTHQUAKE LOAD AND EFFECTS REQUIRED BY THE ONTARIO BUILDING CODE. .2 ELECTRICAL ELEMENTS AND COMPONENTS (FIXTURES, EQUIPMENT, CONDUIT, ETC.), AND THEIR CONNECTIONS TO THE BUILDING SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE SMACNA/ANSI SEISMIC RESTRAINT MANUAL OR OTHER GUIDELINE REFERENCED IN THE ONTARIO BUILDING CODE. 10 EQUIPMENT SUPPORT: .1 ALL ELECTRICAL EQUIPMENT, CONDUIT, WIRING, LIGHTING, DEVICES, AND RELATED ITEMS SHALL BE SECURELY SUPPORTED, ATTACHED AND FASTENED TO BUILDING STRUCTURE. .2 HANGERS AND SUPPORTS SHALL BE FABRICATED AND INSTALLED IN ACCORDANCE WITH MSS STANDARD SP-58, PIPE HANGERS AND SUPPORTS - MATERIALS, DESIGN, MANUFACTURE, SELECTION, APPLICATION, AND INSTALLATION. 11 COORDINATION: .1 INFORMATION INVOLVING ACCURATE DIMENSIONING OF THE BUILDING SHALL BE TAKEN FROM SITE BY CONTRACTOR. .2 DRAWINGS ARE IN DIAGRAMMATIC FORM, INTENDED TO CONVEY THE SCOPE OF WORK AND GENERAL ARRANGEMENT FOR EQUIPMENT. COORDINATE PHYSICAL LOCATION OF ALL EQUIPMENT WITH OTHER TRADES AND ALLOW FOR ANY ADDITIONAL CONDUIT, WIRING, FITTINGS, SUPPORTS, ETC., IN ORDER TO AVOID INTERFERENCE AND FACILITATE THE WORK. .3 CONTRACTOR TO MAKE ANY NECESSARY MODIFICATIONS OR ADDITIONS, WITHOUT CHARGE, TO ACCOMMODATE SITE CONDITIONS AND COORDINATION. .4 COORDINATE AND VERIFY ALL ELECTRICAL BRANCH CIRCUIT REQUIREMENTS FOR EQUIPMENT SUPPLIED BY OTHERS, PRIOR TO MATERIAL PROCUREMENT OR INSTALLATION. .5 PROVIDE ALL WIRING TO ALL MECHANICAL EQUIPMENT, INCLUDING WIRING BELOW 50V. COORDINATE ALL MECHANICAL EQUIPMENT WIRING WITH MECHANICAL TRADES. 12 START-UP, COMMISSIONING AND TRAINING: .1 START-UP AND COMMISSION THE FOLLOWING SYSTEMS: .1 ELECTRICAL CONNECTIONS TO NEW EQUIPMENT. .2 PERFORM SYSTEMATIC TESTS, PROCEDURES AND CHECKS ON SYSTEMS, AS FOLLOWS: .1 TO VERIFY OPERATION IN ACCORDANCE WITH CONTRACT DOCUMENTS, DESIGN CRITERIA AND INTENT, AND MANUFACTURER'S REQUIREMENTS; .2 TO ENSURE APPROPRIATE DOCUMENTATION IS PROVIDED; .3 TO EFFECTIVELY TRAIN BUILDING OPERATIONAL STAFF. .3 SYSTEMS ARE TO BE OPERATED AT FULL CAPACITY, WITH CORRECTION OF ALL DEFICIENCIES AND ADJUSTMENTS TO MEET OPTIMUM PERFORMANCE. .4 PROVIDE WRITTEN REPORT AT END OF COMMISSIONING OUTLINING EQUIPMENT OPERATIONAL CONDITIONS AND PARAMETERS. All drawings, specifications and related documents are the copyright property of the Engineer and must be returned upon request. Reproduction of drawings, specifications, and related documents in part or whole is forbidden without the Engineers' written permission. The contractor must check and verify all dimensions on the job prior to start of construction. DRAWINGS ARE NOT TO BE SCALED Scale: REV DATE: Drawing No.: Contract No.: Project No.: Date: Approved: Checked: Checked: Drawn: Design: Drawing Title: Revisions Date By No. Facsimile: (613) 345-0008 Telephone: (613) 345-0400 Web: www.EastEng.com 100 Strowger Blvd. Suite 207 Brockville, Ont. K6V 5J9 Eastern Engineering Group Inc. 6/20/2018 MECHANICAL & ELECTRICAL NOTES & SCHEDULES - - MM MP 12-07-17 8051 ME1 0 MP 2018-02-02 FOR REVIEW 1 MP 2018-04-23 FINAL REVIEW 2 GB 2018-05-30 FOR TENDER & PERMIT 3 GB 2018-06-13 LAYOUT CLARIFICATION - - - - - - - - - - - - - - - - - - - - - - - - - - - - Scale: Horizontal: AS SHOWN Vertical: AS SHOWN Project Title: 478 Main St. East Winchester, Ontario WINCHESTER OLD TOWN HALL THEATRE HVAC MODIFICATIONS Telephone: (613) 499-2077 68 William St. Suite 200 Brockville, Ont.

MECHANICAL NOTES 11 EQUIPMENT AND MATERIALS ….3wiring diagram of control panels..4operating instructions, including start-up ... ontario regulation 278 “designated substance -

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: MECHANICAL NOTES 11 EQUIPMENT AND MATERIALS ….3wiring diagram of control panels..4operating instructions, including start-up ... ontario regulation 278 “designated substance -

NTS

KEY PLAN

KEY PLAN

AREA OFWORK

EXISTING ELECTRICAL PANELSQUARE D #NQOD454L225CU225A, 120/240V, 3PH, 4W54 CCTS

12x8

8"Ø

12x8

RA

SA SUPPLY AIR

RETURN AIR

DUCT SIZE, RECTANGULAR,

ELBOW, RECTANGULAR(r=1.5W)

ACOUSTICAL INSULATION LINING

HVAC LEGEND

DUCT SIZE, ROUND

DUCT SECTION, SUPPLY

DUCT SECTION, RETURN OR EXHAUST

FIRST FIGURE IS SIDE SHOWN

EA EXHAUST AIR

ACOUSTICAL INSULATION LINING

TEE, RECTANGULAR MAIN AND TAP,

FOT - FLAT ON TOP, FOB - FLAT ON BOTTOM

TEE, RECTANGULAR MAIN AND TAP

TEE RECTANGULAR

TRANSITIONS

WITH DAMPER

WYE, RECTANGULAR

TYPE

CFM

SIZECEILING OR REGISTER DESIGNATION

CEILING RETURN GRILLE

FD

WALL SUPPLY GRILLE OR REGISTER

FIRE DAMPER

WALL EXHAUST/RETURN GRILLE OF REGISTER

CEILING SUPPLY DIFFUSER

24"x24"'S1' 100

T THERMOSTAT

MECHANICAL NOTES

MECHANICAL DRAWINGS SHALL BE READ IN CONJUNCTIONWITH ALL OTHER DRAWINGS FOR THIS PROJECT.

1 GENERAL:.1 CONFORM WITH APPLICABLE REQUIREMENTS OF THE

MINISTRY OF LABOUR, AND THE OCCUPATIONAL HEALTHAND SAFETY ACT AND REGULATIONS FOR CONSTRUCTIONPROJECTS.

.2 DO COMPLETE INSTALLATION IN ACCORDANCE WITH THEFOLLOWING:.1 ONTARIO BUILDING CODE (OBC);.2 NATURAL GAS AND PROPANE INSTALLATION CODE

(GAS CODE)/INSTALLATION CODE FOR OIL BURNINGEQUIPMENT;

.3 ASHRAE;

.4 SMACNA;

.5 NFPA;

.6 ALL OTHER RELEVANT CODES AND STANDARDS, ASAPPLICABLE.

.3 OBTAIN ALL PERMITS REQUIRED FOR THE INSTALLATIONOF MECHANICAL TRADES WORK, ARRANGE FORINSPECTIONS AND TESTS, AND PAY ALL FEES AND COSTSFOR THE PERMITS, INSPECTIONS AND FEES. OBTAINPERMITS IMMEDIATELY AFTER NOTIFICATION OF AWARDOF CONTRACT.

.4 PROVIDE THREE COPIES OF COMPLETE OPERATING ANDMAINTENANCE INSTRUCTIONS FOR EQUIPMENTFURNISHED UNDER THIS CONTRACT. BIND INSTRUCTIONSIN 3-RING BINDERS. INCLUDE THE FOLLOWING:.1 SCHEMATIC DIAGRAM OF ELECTRICAL SYSTEMS..2 CONTROL SHOP DRAWINGS AND OPERATING

SEQUENCE INCLUDING WIRING OF COMPONENTS..3 WIRING DIAGRAM OF CONTROL PANELS..4 OPERATING INSTRUCTIONS, INCLUDING START-UP

AND SHUT-DOWN PROCEDURE..5 MAINTENANCE INSTRUCTIONS INCLUDING

PREVENTIVE MAINTENANCE INSTRUCTIONS FORCOMPONENTS OF THE EQUIPMENT.

.6 COMPLETE PARTS LIST OF ASSEMBLIES AND THEIRCOMPONENT PARTS, SHOWING MANUFACTURER'SNAME, CATALOGUE NUMBER, AND NEARESTREPLACEMENT SOURCE.

.7 LIST OF RECOMMENDED SPARE PARTS AND QUANTITYOF EACH ITEM TO BE STOCKED.

.8 MANUFACTURERS' WARRANTIES AND GUARANTEES..5 CLEAN ALL MECHANICAL SYSTEMS AT PROJECT

COMPLETION..6 COMPLETE AS-BUILT DRAWINGS SHOWING ALL CHANGES

AS WORK PROGRESSES.

2 CONTRACTOR QUALIFICATIONS:.1 ALL WORK TO BE CARRIED OUT IN ACCORDANCE WITH THE

“TRADE QUALIFICATION AND APPRENTICESHIP ACT”AND REGULATIONS, BY PERSONS WHO HOLD THEFOLLOWING CERTIFICATES OF QUALIFICATION (ASAPPLICABLE):.1 REFRIGERATION & AIR CONDITIONING SYSTEMS

MECHANIC;.2 RESIDENTIAL AIR CONDITIONING SYSTEMS

MECHANIC;.3 SHEET METAL WORKER.

.2 ALL FUELS-RELATED WORK TO BE CARRIED OUT INACCORDANCE WITH TSSA REQUIREMENTS AND ONTARIO REGULATION 215/01, “FUEL INDUSTRY CERTIFICATES” BYPERSONS WHO HOLD THE APPROPRIATE CERTIFICATES FORTHE WORK BEING PERFORMED.

3 EXISTING FACILITIES AND DEMOLITION:.1 LOCATE AND PROTECT ALL EXISTING EXTERIOR SITE

SERVICES..2 RETAIN AND PROTECT ALL EXISTING INTERIOR SERVICES

AND BUILDING FABRIC. MAKE GOOD ANY AND ALLDAMAGE RESULTING FROM THIS WORK.

.3 CONNECTIONS TO EXISTING SERVICES SHALL BECOORDINATED WITH THE OWNER.

.4 EXECUTE WORK WITH LEAST POSSIBLE INTERFERENCE ORDISTURBANCE TO NORMAL USE OF THE EXISTINGBUILDING.

.5 DESIGNATED SUBSTANCES:.1 DESIGNATED SUBSTANCES SHALL BE TREATED IN

ACCORDANCE WITH THE REQUIREMENTS OF THEOCCUPATIONAL HEALTH AND SAFETY ACT ANDREGULATIONS.

.2 SHOULD ANY DESIGNATED SUBSTANCES BEENCOUNTERED IN THE AREA OF CONSTRUCTION, ALLWORK SHALL STOP IMMEDIATELY, AND THE OWNERAND ENGINEER SHALL BE NOTIFIED IMMEDIATELY.

.3 IF APPLICABLE, ASBESTOS REMOVAL SHALL BECOMPLETED IN ACCORDANCE WITH THEOCCUPATIONAL HEALTH AND SAFETY ACT ANDONTARIO REGULATION 278 “DESIGNATED SUBSTANCE- ASBESTOS ON CONSTRUCTION PROJECTS AND INBUILDINGS AND REPAIR OPERATIONS”.

.6 DISPOSAL OF MATERIALS:.1 REMOVE AND DISPOSE OF ALL WASTE MATERIALS.

.2 RECYCLE MATERIALS WHERE POSSIBLE..3 HANDLE WASTE MATERIALS NOT REUSED, SALVAGED,

OR RECYCLED IN ACCORDANCE WITHAPPROPRIATE REGULATIONS AND CODES.

.4 DO NOT BURY RUBBISH OR WASTE MATERIALS, ORDISPOSE OF MATERIALS INTO WATERWAYS, STORM,OR SANITARY SEWERS.

.5 KEEP RECORDS OF CONSTRUCTION WASTE INCLUDINGNUMBER AND SIZE OF BINS, WASTE TYPE OF EACHBIN, TOTAL TONNAGE GENERATED, TONNAGE REUSEDOR RECYCLED, REUSED OR RECYCLED WASTEDESTINATION.

.6 REMOVE MATERIALS FROM DECONSTRUCTION ASDECONSTRUCTION/DISASSEMBLY WORK PROGRESSES.

.7 PREPARE PROJECT SUMMARY TO VERIFYDESTINATION AND QUANTITIES ON AMATERIAL_BY_MATERIAL BASIS.

4 FIXTURES AND EQUIPMENT:.1 PROVIDE SHOP DRAWINGS AND PRODUCT DATA FOR ALL

MECHANICAL FIXTURES AND EQUIPMENT FOR APPROVAL,PRIOR TO PROCUREMENT.

.2 INSTALL ALL MECHANICAL FIXTURES AND EQUIPMENT INACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS.

.3 LOCATE ALL EQUIPMENT WITH CLEARANCES, AS REQUIREDBY THE MANUFACTURER, THE FUEL CODES, AND ALLOTHER CODES AND REGULATIONS, INCLUDING THEFOLLOWING CLEARANCES:.1 TO PERMIT PROPER EQUIPMENT OPERATION;.2 TO PERMIT SUFFICIENT AIRFLOW AROUND

EQUIPMENT;.3 FOR EQUIPMENT SERVICE;.4 SUFFICIENT DISTANCE FROM COMBUSTIBLE

MATERIAL;.5 WITH SUFFICIENT VENT CLEARANCES;.6 SUFFICIENT DISTANCE FROM ROOF EDGES OR OTHER

HAZARDS.

5 ACCESS DOORS:.1 SUPPLY ACCESS DOORS, AS REQUIRED IN DUCTWORK AND

WALL/CEILING ASSEMBLIES, TO ALL CONCEALEDMECHANICAL EQUIPMENT AND OPERATING DEVICES.ACCESS DOORS IN WALL/CEILING ASSEMBLIES TO BEINSTALLED BY OTHER TRADES.

.2 ACCESS DOORS SHALL BE FIRE-RATED TYPE, WHERE USEDIN FIRE-RATED ASSEMBLIES, AND SHALL MATCH THERATING OF THE ASSEMBLY.

6 NATURAL GAS PIPING:.1 STEEL PIPE, SCHEDULE 40, SEAMLESS, SCREWED FITTINGS..2 SLOPE PIPING DOWN IN DIRECTION OF FLOW TO LOW

POINTS.

.3 TEST SYSTEM IN ACCORDANCE WITH NATURAL GAS ANDPROPANE INSTALLATION CODE.

7 DUCTWORK:.1 RECTANGULAR DUCT:

.1 RIGID GALVANIZED STEEL, LOCK FORMING QUALITYTO ASTM A653/A653M

.2 THICKNESS, FABRICATION, REINFORCEMENT ANDSUPPORT/ATTACHMENT TO ASHRAE OR SMACNA.

.2 ROUND DUCT:.1 RIGID GALVANIZED STEEL, LOCK FORMING QUALITY

TO ASTM A653/A653M.2 THICKNESS, FABRICATION, REINFORCEMENT AND

SUPPORT/ATTACHMENT TO ASHRAE OR SMACNA..3 SEAL CLASSIFICATION:

.1 CLASS A: LONGITUDINAL SEAMS, TRANSVERSE JOINTS,DUCT WALL PENETRATIONS AND CONNECTIONSMADE AIRTIGHT WITH SEALANT AND TAPE.

.4 FITTINGS.1 FABRICATION: TO SMACNA..2 RADIUSED ELBOWS.

.1 RECTANGULAR: STANDARD WITH CENTRELINERADIUS 1.5 TIMES DUCT DIMENSION, WITHSINGLE THICKNESS TURNING VANES.

.2 ROUND: FIVE PIECE WITH CENTRELINE RADIUS1.5 TIMES DIAMETER.

.3 MITRED ELBOWS, RECTANGULAR: WITH DOUBLETHICKNESS TURNING VANES.

.5 BRANCHES:.1 RECTANGULAR MAIN AND BRANCH: WITH RADIUS ON

BRANCH 1.5 TIMES WIDTH OF DUCT 45 DEGREESENTRY ON BRANCH.

.2 ROUND MAIN AND BRANCH: ENTER MAIN DUCT AT 45DEGREES WITH CONICAL CONNECTION.

.3 PROVIDE VOLUME CONTROL DAMPER IN BRANCHDUCT NEAR CONNECTION TO MAIN DUCT.

.6 TRANSITIONS:.1 DIVERGING: 20 DEGREES MAXIMUM INCLUDED

ANGLE..2 CONVERGING: 30 DEGREES MAXIMUM INCLUDED

ANGLE..7 FIRE STOPPING

.1 RETAINING ANGLES AROUND DUCT, ON BOTH SIDESOF FIRE SEPARATION IN ACCORDANCE WITH SECTION.

.2 FIRE STOPPING MATERIAL AND INSTALLATION MUSTNOT DISTORT DUCT.

.8 DAMPERS:.1 MANUFACTURE TO SMACNA STANDARDS.

.2 SINGLE BLADE DAMPERS:.1 FABRICATE FROM SAME MATERIAL AS DUCT,

BUT ONE SHEET METAL THICKNESS HEAVIER.V_GROOVE STIFFENED.

.2 SIZE AND CONFIGURATION TORECOMMENDATIONS OF SMACNA.

.3 LOCKING QUADRANT (WITH SHAFT EXTENSIONTO ACCOMMODATE INSULATION THICKNESS, IFREQUIRED).

.4 INSIDE AND OUTSIDE NYLON END BEARINGS.

.5 CHANNEL FRAME OF SAME MATERIAL ASADJACENT DUCT, COMPLETE WITH ANGLE STOP.

.9 DUCT LEAKAGE: IN ACCORDANCE WITH SMACNA HVAC AIRDUCT LEAKAGE TEST MANUAL.

.10 ALL DUCT AND SEAL MATERIALS TO HAVE A FLAME SPREADRATING OF LESS THAN 25 AND A SMOKE DEVELOPEDCLASSIFICATION OF LESS THAN 50.

.11 PROVIDE FLEXIBLE CONNECTIONS AT ALL EQUIPMENTDUCT CONNECTION POINTS.

8 DUCT INSULATION:.1 REFER TO DRAWING FOR DUCT THAT IS IDENTIFIED TO BE

INSULATED..2 INSTALL IN ACCORDANCE WITH THERMAL INSULATION

ASSOCIATION OF CANADA (TIAC) NATIONAL STANDARDS..3 MAX. FLAME SPREAD RATING: 25..4 MAX. SMOKE DEVELOPED RATING: 50..5 ACOUSTIC DUCT LINING:

.1 1” (R4.3) ACOUSTIC QUALITY MINERAL FIBRE DUCTLINER, WITH MAT FACING, BACTERIA AND FUNGUSRESISTANT.

.2 FASTEN TO INTERIOR SHEET METAL SURFACE WITH100% COVERAGE OF ADHESIVE AND 5/16” WELDPINS NOT LESS THAN 2 ROWS PER SURFACE AND NOTMORE THAN 16 IN ON CENTRES.

.3 SEAL BUTT JOINTS, EXPOSED EDGES, WELD PIN ANDCLIP PENETRATIONS AND DAMAGED AREAS OF LINERWITH 2” JOINT TAPE AND SEALER.

9 MECHANICAL FIRE PROTECTION:.1 REFER TO ARCHITECTURAL DRAWINGS, TO VERIFY

LOCATION OF ALL FIRE SEPARATIONS AND FIRE-RATEDMEMBRANES.

.2 ALL PIPING SHALL BE TIGHTLY FITTED AND SEALED WITHFIRESTOPPING MATERIAL AT ALL FIRE SEPARATIONS ANDFIRE-RATED MEMBRANES.

.3 FIRE DAMPERS:.1 FIRE DAMPERS SHALL BE CAN/ULC-S112 (STANDARD

METHOD OF FIRE TEST OF FIRE DAMPER ASSEMBLIES)LISTED AND LABELLED.

.2 FIRE DAMPERS SHALL BE NFPA 80 (STANDARD FORFIRE DOORS AND OTHER OPENING PROTECTIVES),NFPA 90A (STANDARD FOR THE INSTALLATION OFAIR-CONDITIONING AND VENTILATING SYSTEMS),AND NFPA 101 (LIFE SAFETY CODE) COMPLIANT.

.3 DUCTWORK SHALL BE FITTED WITH FIRE DAMPERS ATALL FIRE SEPARATIONS AND FIRE-RATEDMEMBRANES.

.4 SUPPLY AND INSTALL ACCESS DOORS INARCHITECTURAL FINISH (WALL, CEILING OR FLOOR)TO ACCESS DUCT, IN COMMON AREA WHEREPOSSIBLE.

.5 SUPPLY AND INSTALL TIGHTLY-FITTED ACCESS DOORIN DUCT TO ACCESS, INSPECT AND RESET FIREDAMPER.

.4 FIRE DAMPER AND DUCT SHALL BE INSTALLED INACCORDANCE WITH MANUFACTURERS REQUIREMENTS,AND SHALL BE SEALED WITH FIRESTOPPING MATERIAL.

.5 ALL MECHANICAL MATERIALS USED WITHIN CEILINGRETURN AIR PLENUMS SHALL FLAME-SPREAD RATING NOTMORE THAN 25 AND SMOKE DEVELOPED CLASSIFICATIONNOT MORE THAN 50 PER CAN/ULC-S102.2.

.6 MOCK-UPS:.1 PREPARE MOCK-UPS OF TYPICAL FIRESTOP

INSTALLATION OF THE FOLLOWING, FOR REVIEW ANDAPPROVAL BY THE OWNER, ENGINEER ANDMUNICIPAL BUILDING INSPECTOR.

.2 ALL FIRESTOP INSTALLATIONS SHALL BE COMPLETEDIN ACCORDANCE WITH THE APPROPRIATE PRODUCTINSTALLATION INSTRUCTIONS, AND THE REFERENCEDUL/ULC LISTING AND/OR TEST STANDARD.

.3 SUPPLY A COPY OF THE PRODUCT INSTALLATIONINSTRUCTIONS WITH ULC LISTING AND/OR TESTSTANDARD REFERENCE, FOR EACH INSTALLATION.

.4 MOCK-UP MAY REMAIN AS PART OF WORK.

10 EARTHQUAKE LOAD:.1 ALL MECHANICAL WORK SHALL BE COMPLETED IN

ACCORDANCE WITH THE EARTHQUAKE LOAD AND EFFECTSREQUIRED BY THE ONTARIO BUILDING CODE.

.2 MECHANICAL ELEMENTS AND COMPONENTS (EQUIPMENT,PIPES, DUCTS, ETC.), AND THEIR CONNECTIONS TO THEBUILDING SHALL BE CONSTRUCTED IN ACCORDANCE WITHTHE SMACNA/ANSI SEISMIC RESTRAINT MANUAL OROTHER GUIDELINE REFERENCED IN THE ONTARIO BUILDINGCODE.

11 EQUIPMENT AND MATERIALS SUPPORT:.1 ALL MECHANICAL EQUIPMENT, PIPING, DUCTWORK, AND

RELATED ITEMS SHALL BE SECURELY SUPPORTED,ATTACHED AND FASTENED TO BUILDING STRUCTURE.

.2 PIPE HANGERS AND SUPPORTS SHALL BE FABRICATED ANDINSTALLED IN ACCORDANCE WITH MSS STANDARD SP-58,PIPE HANGERS AND SUPPORTS - MATERIALS, DESIGN,MANUFACTURE, SELECTION, APPLICATION, ANDINSTALLATION.

.3 PLATFORMS SHALL BE FABRICATED FROM STRUCTURALGRADE STEEL MEETING THE REQUIREMENTS OF THEONTARIO BUILDING CODE, INCLUDING CSA STANDARDW59 WELDED STEEL CONSTRUCTION, AND THEREQUIREMENTS OF THE CANADIAN WELDING BUREAU.

12 COORDINATION:.1 INFORMATION INVOLVING ACCURATE DIMENSIONING OF

THE BUILDING SHALL BE TAKEN FROM SITE BYCONTRACTOR.

.2 DRAWINGS ARE IN DIAGRAMMATIC FORM, INTENDED TOCONVEY THE SCOPE OF WORK AND GENERALARRANGEMENT FOR EQUIPMENT. COORDINATE PHYSICALLOCATION OF ALL EQUIPMENT WITH OTHER TRADESAND ALLOW FOR ANY ADDITIONAL PIPING, DUCTING,FITTINGS, SUPPORTS, ETC., IN ORDER TO AVOIDINTERFERENCE AND FACILITATE THE WORK.

.3 CONTRACTOR TO MAKE ANY NECESSARY MODIFICATIONSOR ADDITIONS, WITHOUT CHARGE, TOACCOMMODATE SITE CONDITIONS AND COORDINATION.

.4 COORDINATE ALL MECHANICAL EQUIPMENT WIRING,INCLUDING LOW VOLTAGE CONTROL WIRING, WITHELECTRICAL TRADES.

13 START-UP, COMMISSIONING AND TRAINING:.1 COMMISSIONING:

.1 START-UP AND COMMISSION THE FOLLOWINGSYSTEMS:.1 HVAC.

.2 PERFORM SYSTEMATIC TESTS, PROCEDURES ANDCHECKS ON SYSTEMS, AS FOLLOWS:.1 TO VERIFY OPERATION IN ACCORDANCE WITH

CONTRACT DOCUMENTS, DESIGN CRITERIA ANDINTENT, AND MANUFACTURER'SREQUIREMENTS;

.2 TO ENSURE APPROPRIATE DOCUMENTATION ISPROVIDED;

.3 TO EFFECTIVELY TRAIN BUILDING OPERATIONALSTAFF.

.3 SYSTEMS ARE TO BE OPERATED AT FULL CAPACITY,WITH CORRECTION OF ALL DEFICIENCIES ANDADJUSTMENTS TO MEET OPTIMUM PERFORMANCE.

.4 PROVIDE WRITTEN REPORT AT END OFCOMMISSIONING OUTLINING EQUIPMENTOPERATIONAL CONDITIONS AND PARAMETERS.

.2 TESTING, ADJUSTING AND BALANCING:.1 TEST, ADJUST AND BALANCE (TAB) ALL PLUMBING

AND HVAC EQUIPMENT AND SYSTEMS; INCLUDINGTHE FOLLOWING:.1 FURNACES;.2 CONDENSING UNITS;.3 HEAT RECOVERY VENTILATORS.

.2 TAB PROCEDURE SHALL BE COMPLETED INACCORDANCE WITH ASHRAE STANDARD 111,MEASUREMENT, TESTING, ADJUSTING ANDBALANCING OF BUILDING HVAC SYSTEMS.

.3 PROVIDE DETAILED REPORT AT END OF TAB, INACCORDANCE WITH THE REPORTING PROCEDURES OFASHRAE STANDARD 111.

.3 DEMONSTRATION AND TRAINING:.1 DEMONSTRATE OPERATION AND MAINTENANCE OF

EQUIPMENT AND SYSTEMS TO OWNER'S PERSONNELONE WEEK PRIOR TO DATE OF FINAL INSPECTION

.2 PRIOR TO DEMONSTRATION AND TRAINING, ENSURETHAT EQUIPMENT HAS BEEN INSPECTED AND PUTINTO OPERATION, INCLUDING COMPLETION OFCOMMISSIONING AND TESTING, ADJUSTING, ANDBALANCING.

.3 DEMONSTRATE START_UP, OPERATION, CONTROL,ADJUSTMENT, TROUBLE_SHOOTING, SERVICING, ANDMAINTENANCE OF EACH ITEM OF EQUIPMENT.

.4 INSTRUCT PERSONNEL IN PHASES OF OPERATION ANDMAINTENANCE USING OPERATION ANDMAINTENANCE MANUALS AS BASIS OF INSTRUCTION.REVIEW CONTENTS OF MANUAL IN DETAIL TOEXPLAIN ASPECTS OF OPERATION ANDMAINTENANCE.

ELECTRICAL NOTES

ELECTRICAL DRAWINGS SHALL BE READ IN CONJUNCTION WITH ALL OTHERDRAWINGS FOR THIS PROJECT.

1 GENERAL:.1 CONFORM WITH APPLICABLE REQUIREMENTS OF THE MINISTRY OF

LABOUR, AND THE OCCUPATIONAL HEALTH AND SAFETY ACT ANDREGULATIONS FOR CONSTRUCTION PROJECTS.

.2 DO COMPLETE INSTALLATION IN ACCORDANCE WITH THE FOLLOWING:.1ONTARIO ELECTRICAL SAFETY CODE;.2ELECTRICAL SAFETY AUTHORITY.

.3 SUBMIT TO ELECTRICAL SAFETY AUTHORITY NECESSARY NUMBER OFDRAWINGS AND SPECIFICATIONS FOR APPROVAL PRIOR TOCOMMENCEMENT OF WORK.

.4 PAY ALL ELECTRICAL PERMIT AND INSPECTION FEES.

.5 GROUND COMPLETE SYSTEM IN ACCORDANCE WITH THE ONTARIOELECTRICAL SAFETY CODE AND ELECTRICAL SAFETY AUTHORITY.

.6 IDENTIFICATION AND LABELLING:.1 IDENTIFY ELECTRICAL EQUIPMENT WITH LAMICOID NAMEPLATES,

INCLUDING AMPERAGE, VOLTAGE, PHASE AND POWER SOURCE..2 PROVIDE TYPEWRITTEN PANEL DIRECTORIES.

.7 PROVIDE THREE COPIES OF COMPLETE OPERATING AND MAINTENANCEINSTRUCTIONS FOR EQUIPMENT FURNISHED UNDER THIS CONTRACT.

.8 CLEAN ALL ELECTRICAL SYSTEMS AT PROJECT COMPLETION.

.9 COMPLETE AS-BUILT DRAWINGS SHOWING ALL CHANGES AS WORKPROGRESSES.

2 CONTRACTOR QUALIFICATIONS:.1 ALL WORK TO BE CARRIED OUT IN ACCORDANCE WITH THE “TRADES

QUALIFICATION AND APPRENTICESHIP ACT” AND REGULATIONS, BYPERSONS WHO HOLD THE FOLLOWING CERTIFICATES OF QUALIFICATION(AS APPLICABLE):.1 ELECTRICIAN: CONSTRUCTION & MAINTENANCE;.2 ELECTRICIAN: DOMESTIC & RURAL.

3 EXISTING FACILITIES AND DEMOLITION:.1 LOCATE AND PROTECT ALL EXISTING EXTERIOR SITE SERVICES..2 RETAIN AND PROTECT ALL EXISTING INTERIOR SERVICES AND BUILDING

FABRIC. MAKE GOOD ANY AND ALL DAMAGE RESULTING FROM THISWORK.

.3 CONNECTIONS TO EXISTING SERVICES SHALL BE COORDINATED WITH THEOWNER.

.4 EXECUTE WORK WITH LEAST POSSIBLE INTERFERENCE OR DISTURBANCE TONORMAL USE OF THE EXISTING BUILDING.

.5 DESIGNATED SUBSTANCES:.1 DESIGNATED SUBSTANCES SHALL BE TREATED IN ACCORDANCE WITH

THE REQUIREMENTS OF THE OCCUPATIONAL HEALTH AND SAFETY ACTAND REGULATIONS.

.2 SHOULD ANY DESIGNATED SUBSTANCES BE ENCOUNTERED IN THEAREA OF CONSTRUCTION, ALL WORK SHALL STOP IMMEDIATELY, ANDTHE OWNER AND ENGINEER SHALL BE NOTIFIED IMMEDIATELY.

.3 IF APPLICABLE, ASBESTOS REMOVAL SHALL BE COMPLETED INACCORDANCE WITH THE OCCUPATIONAL HEALTH AND SAFETY ACTAND ONTARIO REGULATION 278 “DESIGNATED SUBSTANCE -ASBESTOS ON CONSTRUCTION PROJECTS AND IN BUILDINGS ANDREPAIR OPERATIONS”.

.6 DISPOSAL OF MATERIALS: .1 REMOVE AND DISPOSE OF ALL WASTE MATERIALS. .2 RECYCLE MATERIALS WHERE POSSIBLE. .3 HANDLE WASTE MATERIALS NOT REUSED, SALVAGED, OR RECYCLED IN

ACCORDANCE WITHAPPROPRIATE REGULATIONS AND CODES.

.4 DO NOT BURY RUBBISH OR WASTE MATERIALS, OR DISPOSE OFMATERIALS INTO WATERWAYS, STORM, OR SANITARY SEWERS.

.5 KEEP RECORDS OF CONSTRUCTION WASTE INCLUDING NUMBER ANDSIZE OF BINS, WASTE TYPE OF EACH BIN, TOTAL TONNAGEGENERATED, TONNAGE REUSED OR RECYCLED, REUSED OR RECYCLEDWASTE DESTINATION.

.6 REMOVE MATERIALS FROM DECONSTRUCTION ASDECONSTRUCTION/DISASSEMBLY WORK PROGRESSES.

.7 PREPARE PROJECT SUMMARY TO VERIFY DESTINATION ANDQUANTITIES ON A MATERIAL_BY_MATERIAL BASIS.

4 FIXTURES AND EQUIPMENT:.1 INSTALL ALL ELECTRICAL FIXTURES AND EQUIPMENT IN ACCORDANCE WITH

MANUFACTURER'S INSTRUCTIONS..2 EQUIPMENT AND MATERIAL TO BE CSA CERTIFIED. WHERE THERE IS NO

ALTERNATIVE TO SUPPLYING EQUIPMENT WHICH IS NOT CSA CERTIFIED,OBTAIN SPECIAL APPROVAL FROM ELECTRICAL SAFETY AUTHORITY.

5 EQUIPMENT SUPPLIED BY OTHERS:.1 MAKE ALL ELECTRICAL SERVICE CONNECTIONS TO EQUIPMENT SUPPLIED BY

OTHERS..2 CONFIRM ALL SERVICE CONNECTIONS WITH MANUFACTURER AND

SUPPLIER, PRIOR TO INSTALLATION. THIS SHALL INCLUDE ALL CONNECTIONSIZES, LOCATIONS AND DETAILS, AND SHALL TAKE INTO ACCOUNTEQUIPMENT CLEARANCES AND INSTALLATION REQUIREMENTS.

6 CONDUITS:.1 ELECTRICAL METALLIC TUBING (EMT), HOT DIPPED GALVANIZED STEEL,

WITH THREADED CONNECTORS AND COUPLINGS, WHERE NOT SUBJECT TOMECHANICAL INJURY, IN SERVICE AREAS ONLY.

7 WIRES AND CABLE:.1 VOLTAGE DROP:

.1 BRANCH CIRCUIT CONDUCTORS SHALL BE SIZED FOR A MAXIMUMVOLTAGE DROP OF 3% AT DESIGN LOAD.

.2 BUILDING WIRES IN CONDUIT SYSTEMS TO BE STRANDED COPPERCONDUCTORS FOR 10 AWG AND LARGER, MINIMUM SIZE 12 AWG, TYPERW90.

.3 BUILDING WIRES IN CONCEALED LOCATIONS TO BE COPPER, MINIMUM SIZE12 AWG, TYPE AC90.

.4 ALL WIRING SHALL BE CONCEALED IN WALLS AND CEILINGS, UNLESSOTHERWISE NOTED OR APPROVED. SURFACE-MOUNTED WIRING IS NOTPERMITTED.

8 FIRE PROTECTION:.1 ALL CABLING AND CONDUIT SHALL BE TIGHTLY FITTED AND SEALED WITH

FIRESTOPPING MATERIAL AT ALL FIRE SEPARATIONS AND FIRE-RATEDMEMBRANES.

9 EARTHQUAKE LOAD:.1 ALL ELECTRICAL WORK SHALL BE COMPLETED IN ACCORDANCE WITH THE

EARTHQUAKE LOAD AND EFFECTS REQUIRED BY THE ONTARIO BUILDINGCODE.

.2 ELECTRICAL ELEMENTS AND COMPONENTS (FIXTURES, EQUIPMENT,CONDUIT, ETC.), AND THEIR CONNECTIONS TO THE BUILDING SHALL BECONSTRUCTED IN ACCORDANCE WITH THE SMACNA/ANSI SEISMICRESTRAINT MANUAL OR OTHER GUIDELINE REFERENCED IN THE ONTARIOBUILDING CODE.

10 EQUIPMENT SUPPORT:.1 ALL ELECTRICAL EQUIPMENT, CONDUIT, WIRING, LIGHTING, DEVICES, AND

RELATED ITEMS SHALL BE SECURELY SUPPORTED, ATTACHED ANDFASTENED TO BUILDING STRUCTURE.

.2 HANGERS AND SUPPORTS SHALL BE FABRICATED AND INSTALLED INACCORDANCE WITH MSS STANDARD SP-58, PIPE HANGERS AND SUPPORTS- MATERIALS, DESIGN, MANUFACTURE, SELECTION, APPLICATION, ANDINSTALLATION.

11 COORDINATION:.1 INFORMATION INVOLVING ACCURATE DIMENSIONING OF THE BUILDING

SHALL BE TAKEN FROM SITE BY CONTRACTOR..2 DRAWINGS ARE IN DIAGRAMMATIC FORM, INTENDED TO CONVEY THE

SCOPE OF WORK AND GENERAL ARRANGEMENT FOR EQUIPMENT.COORDINATE PHYSICAL LOCATION OF ALL EQUIPMENT WITH OTHERTRADES AND ALLOW FOR ANY ADDITIONAL CONDUIT, WIRING, FITTINGS,SUPPORTS, ETC., IN ORDER TO AVOID INTERFERENCE AND FACILITATE THEWORK.

.3 CONTRACTOR TO MAKE ANY NECESSARY MODIFICATIONS OR ADDITIONS,WITHOUT CHARGE, TO ACCOMMODATE SITE CONDITIONS ANDCOORDINATION.

.4 COORDINATE AND VERIFY ALL ELECTRICAL BRANCH CIRCUITREQUIREMENTS FOR EQUIPMENT SUPPLIED BY OTHERS, PRIOR TOMATERIAL PROCUREMENT OR INSTALLATION.

.5 PROVIDE ALL WIRING TO ALL MECHANICAL EQUIPMENT, INCLUDINGWIRING BELOW 50V. COORDINATE ALL MECHANICAL EQUIPMENT WIRINGWITH MECHANICAL TRADES.

12 START-UP, COMMISSIONING AND TRAINING:.1 START-UP AND COMMISSION THE FOLLOWING SYSTEMS:

.1 ELECTRICAL CONNECTIONS TO NEW EQUIPMENT..2 PERFORM SYSTEMATIC TESTS, PROCEDURES AND CHECKS ON SYSTEMS, AS

FOLLOWS:.1 TO VERIFY OPERATION IN ACCORDANCE WITH CONTRACT

DOCUMENTS, DESIGN CRITERIA AND INTENT,AND MANUFACTURER'S REQUIREMENTS;

.2 TO ENSURE APPROPRIATE DOCUMENTATION IS PROVIDED;

.3 TO EFFECTIVELY TRAIN BUILDING OPERATIONAL STAFF..3 SYSTEMS ARE TO BE OPERATED AT FULL CAPACITY, WITH CORRECTION OF

ALL DEFICIENCIES AND ADJUSTMENTS TO MEET OPTIMUM PERFORMANCE..4 PROVIDE WRITTEN REPORT AT END OF COMMISSIONING OUTLINING

EQUIPMENT OPERATIONAL CONDITIONS AND PARAMETERS.

All drawings, specifications and related documents are the copyright propertyof the Engineer and must be returned upon request. Reproduction of drawings,specifications, and related documents in part or whole is forbidden without the

Engineers' written permission.

The contractor must check and verify all dimensions on the job prior tostart of construction.

DRAWINGS ARE NOT TO BE SCALED

Scale:

REV DATE:

Drawing No.:

Contract No.:

Project No.:

Date:

Approved:Checked:

Checked:Drawn:

Design:

Drawing Title:

RevisionsDateByNo.

Facsimile: (613) 345-0008Telephone: (613) 345-0400

Web: www.EastEng.com100 Strowger Blvd. Suite 207Brockville, Ont. K6V 5J9

Eastern Engineering Group Inc.

6/20/2018

MECHANICAL & ELECTRICALNOTES & SCHEDULES

- - MM

MP 12-07-17

8051

ME1

0 MP 2018-02-02 FOR REVIEW

1 MP 2018-04-23 FINAL REVIEW

2 GB 2018-05-30 FOR TENDER & PERMIT

3 GB 2018-06-13 LAYOUT CLARIFICATION

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

Scale:

Horizontal: AS SHOWN

Vertical: AS SHOWN

Project Title:

478 Main St. EastWinchester, Ontario

WINCHESTEROLD TOWN HALL THEATRE

HVAC MODIFICATIONS

Telephone: (613) 499-207768 William St. Suite 200Brockville, Ont.

Page 2: MECHANICAL NOTES 11 EQUIPMENT AND MATERIALS ….3wiring diagram of control panels..4operating instructions, including start-up ... ontario regulation 278 “designated substance -

SCALE: 14" = 1'-0"

PARTIAL FLOOR PLAN - DEMOLITION

RA 32x14 SA 1

2x1

4

SA 12Ø

SA 32x14

SA 2

4x1

4 S

A 2

4x1

2

SA 20x8

SA 12Ø

SA 12Ø

SA 12Ø

SA 12Ø

SA 12Ø

SA 12Ø

SA 12Ø

ELECTRIC BASEBOARD HEATERDISCONNECT & REMOVEINCLUDING CONDUIT & WIRINGBACK TO SOURCE

RETAIN EXISTING EXHAUST FANNO CHANGE

SHOW CURTAIN

EXISTING ROOFTOP UNITLENNOX - DISCONNECT, REMOVE & DISPOSE OF UNIT

INCLUDING ALL DUCTWORKS ASSOCIATED WITH THE UNIT.

- REUSE EXISTING NAT. GAS PIPING FOR NEW FURNACES

- INFILL & REPAIR ROOF OPENINGS TO MATCH EXISTING.REFER TO DETAIL.

MUSICBOOTH

SEATINGAREA

SHOWAREA

DRESSINGRM

W/RCORR

RETAIN EXISTING EXHAUST FANNO CHANGE

T

REPLACE EXISTINGTHERMOSTAT

RELOCATE EXISTINGREFRIGERATOR

T

REPLACE EXISTINGTHERMOSTAT

ELECTRIC BASEBOARD HEATERDISCONNECT & REMOVE

INCLUDING CONDUIT & WIRINGBACK TO SOURCE

F-1FURNACESA19x12 (NOM) OFF UNITELBOW & TRANS TO SA16x10RA22x14 (NOM) OFF UNITWITH FILTER RACK & FILTERELBOW TO 8' AFFACOUSTICALLY LINE COMPLETE LENGTH12" GAS CONNECTION WITH UNION,ISOLATING VALVE & DRIP LEGCOMB/VENT AIR TO EXTERIOR WALL CAP

SCALE: 14" = 1'-0"

PARTIAL FLOOR PLAN - NEW CONSTRUCTION

39'-2"±

D

12

'-6"±

CEILING HT: 8'

MUSICBOOTH

SEATINGAREA

SHOWAREA

DRESSINGRM

18

'-3"±

10

'-4"±

5'-834"±

13'-0"±

SA 8

SA 16x10

75S312" Ø

EXISTING EXHAUST FANNO CHANGE

T

NEWTHERMOSTAT

BARRIER-FREEW/R

T

NEWTHERMOSTAT

200S124X6

R124x6

50

'-0"±

26'-7" ±

150S212X4

150S212x4

DENOTES BELOWFLOOR

SA 10"Ø

SA 10"Ø

D

D D

SA 2

0x2

0 S

A 2

0x1

6

APPROX LOCATION OF EXISTINGNAT. GAS SERVICE & METER

F-1

SA 8

D

SA 8

GA

S

FD FD

SA 6"ØCAP FOR FUTUREWASHROOM

200S318"Ø

200S218"Ø

200S318"Ø

R140X14

F-2FINAL LOCATIONBY OWNER

A

A

200S124X6

SA 6

SA 6

GAS GAS GAS

SA 10"Ø

200S124X6

200S124X6

200S124X6

D

D D

D D SA 10"Ø

D D

GA

SG

AS

GA

S

GAS GAS GAS GAS

REFRIGERANT LINES FROMCONDENSING UNIT CU-2

COMB/VENTTHROUGH WALL TO

EXTERIOR WALL CAP

200S124X6200S1

24X6

200S124X6

200S124X6

SA 12x10

34" NAT. GAS PIPINGFROM ROOF

SA 8x10

R224"x6"

R224"x6"

R224"x6"

R224"x6"

D

SA 10"Ø

SA 10"Ø

SA 10"Ø

F-2FURNACESA 19x19 (NOM) OFF UNITWITH COOLING COILRA 21.5x19.5 (NOM) OFF UNIT WITHFILTER RACK & FILTERELBOW TO BASEMENT RA PLENUMACOUSTICALLY LINE FULL LENGTH12" GAS CONNECTION WITH UNION,ISOLATING VALVE & DRIP LEGCOMB/VENT AIR TO EXTERIOR WALL CAPCONDENSATE DRAIN TO FLOOR DRAIN

D

SA 10"Ø

SA 10"Ø

200S124X6

DO NOT CUT OR MODIFYEXISTING STRUCTURE DURINGCONSTRUCTION

HRV-1HEAT RECOVERY VENTILATOR - HRV SA 14x8 TO RA PLENUM- HRV RA 14x8 - HRV OA 14x8 FROM ROOF - HRV EA 14x8 TO WALL CAP- CONDENSATE PIPE DRAIN TO FLOOR

DRAIN

SCALE: 316" = 1'-0"

SECTION A-A

HRV-1HEAT RECOVERYVENTILATOR

F-2FURNACE

SA 20x20 SA 20x16

SA 24x6DIFFUSER

All drawings, specifications and related documents are the copyright propertyof the Engineer and must be returned upon request. Reproduction of drawings,specifications, and related documents in part or whole is forbidden without the

Engineers' written permission.

The contractor must check and verify all dimensions on the job prior tostart of construction.

DRAWINGS ARE NOT TO BE SCALED

Scale:

REV DATE:

Drawing No.:

Contract No.:

Project No.:

Date:

Approved:Checked:

Checked:Drawn:

Design:

Drawing Title:

RevisionsDateByNo.

Facsimile: (613) 345-0008Telephone: (613) 345-0400

Web: www.EastEng.com100 Strowger Blvd. Suite 207Brockville, Ont. K6V 5J9

Eastern Engineering Group Inc.

6/20/2018

HVACFLOOR PLANS

- - MM

MP 12-07-17

8051

ME2

0 MP 2018-02-02 FOR REVIEW

1 MP 2018-04-13 FINAL REVIEW

2 GB 2018-05-30 FOR TENDER & PERMIT

3 GB 2018-06-13 LAYOUT CLARIFICATION

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

Scale:

Horizontal: AS SHOWN

Vertical: AS SHOWN

Project Title:

478 Main St. EastWinchester, Ontario

WINCHESTEROLD TOWN HALL THEATRE

HVAC MODIFICATIONS

P

R

O

J

E

C

T

N

O

R

T

H

Telephone: (613) 499-207768 William St. Suite 200Brockville, Ont.

Page 3: MECHANICAL NOTES 11 EQUIPMENT AND MATERIALS ….3wiring diagram of control panels..4operating instructions, including start-up ... ontario regulation 278 “designated substance -

SCALE: 14" = 1'-0"

PARTIAL ROOF PLAN - NEW CONSTRUCTION

APPROX LOCATION OF EXISTING11

4" NAT. GAS SERVICE & METER

GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS

GA

SG

AS

GA

SG

AS

GA

S

GAS

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

GA

SG

AS

REFRIGERANT LINESTO FURNACE F-1

REFRIGERANT LINESTO FURNACE F-2

NEW1" NAT GAS LINEON ROOF MOUNTING BLOCKSTO FURNACE F-2

NEW1" NAT GAS LINECONNECT TO EXISTINGON ROOF MOUNTING BLOCKSCONNECT TO EXISTING

EXISTING1" NAT GAS ON ROOFMOUNTING BLOCKS

NAT GAS LINE & REFRIGERANT LINESDOWN THE WALL, UNDER SOFFIT TOCEILING SPACE

NEW34" NAT GAS LINEON ROOF MOUNTING BLOCKSTO FURNACE F-1

OUTDOOR AIR INLET TOHEAT RECOVERYVENTILATOR HRV-1

CU-1CONDENSING UNITMOUNTED ON ROOFREFER TO DETAIL

CU-2CONDENSING UNITMOUNTED ON ROOFREFER TO DETAIL

EXISTING1" NAT GAS

UP WALL TO ROOF

EXISTING1" NAT GAS

DOWN WALL TO BASEMENT

EXISTING11

4" NAT GAS

STRUCTURAL NOTES1) ALL WORK TO BE COMPLETED IN ACCORDANCE WITH THE 2012 ONTARIO BUILDING CODE2) CONTRACTOR SHALL VERIFY ALL DIMENSIONS PRIOR TO FABRICATION.3) STEEL SHALL BE MIN. FY=300MPA TO CAN G40.21-13.4) HOLES SHALL BE DRILLED, DIAMETER +2MM (1/8”). NO BURNING OF HOLES IN STEEL IS NOT PERMITTED.5) STEEL SHALL BE SHOP PRIMED AND TOUCHED UP IN FIELD WITH PRIMER AS REQUIRED.6) CONCRETE SHALL BE MIN. 35 MPA AT 28 DAY STRENGTH. EXPOSURE CLASS C-1.7) REINFORCING STEEL SHALL BE MIN. GRADE 400.8) MAINTAIN A MINIMUM OF 50MM (2”) CLEAR COVER ON ALL SIDES.9) PRIOR TO SAW-CUTTING THE EXISTING SLAB SHALL BE SCANNED. DO NOT CUT REINFORCING STEEL.10) EPOXY SHALL BE HILTI HY200 ADHESIVE ANCHORING SYSTEM OR AN APPROVED EQUAL.11) INSTALL ALL PREMANUFACTURED BRACKETS, FASTENERS AND ADHESIVES IN ACCORDANCE WITH THE MANUFACTURER

SPECIFICATIONS AND INSTALLATION GUIDELINES.

DESIGN LOADS:SS=2.3 KPASR=0.4 KPAIS =1.0SA(0.2) = 0.60IE= 1.0DL (ROOF): 2.4 KPA

: MECHANICAL SELF-WEIGHT (REFER TO MANUFACTURER)

*PRIOR TO APPLICABLE LOAD FACTORS

HRV-1HEAT RECOVERY VENTILATOR<12A, 120V/1PHBELOW FLOOR

F-1FURNACE<12A, 120V/1PH

CEILING HT: 8'

SCALE: 14" = 1'-0"

ELECTRICAL - NEW CONSTRUCTION

39'-2"±

12

'-6"±

MUSICBOOTH

SHOWAREA

DRESSINGRM

18

'-3"±

10

'-4"±

5'-834"±

13'-0"±

50

'-0"±

T

BARRIER-FREEW/R

T

F-2FURNACE<16A,120V/1PHBELOW FLOOR

CU-2CONDENSING UNIT30.1 MCA, 240V/1PH(LOCATED ON ROOF)

CU-1CONDENSING UNIT14.5MCA, 240V/1PH(LOCATED ON ROOF)

EXISTING ROOFTOP UNITLENNOX - #GCS16-120-270-2Y58 MCA, 240V/3PHDISCONNECT & REMOVEELECTRICAL WIRING BACK TOSOURCE

EXISTING ELECTRICAL SERVICESUPPLY & INSTALL THE FOLLOWING NEW

BRANCH CIRCUITS:· 15A/1P - FURNACE F-1· 20A/1P - FURNACE F-2

· 20A/2P - CONDENSING UNIT CU-1· 50A/2P - CONDENSING UNIT CU-2

· 15A/1P - HEAT RECOVERY VENTILATOR

SCALE:- NTS

CONDENSING UNIT & SERVICE CURB DETAIL (STRUCTURAL)

ROOF STRUCTURE

CONDENSING UNITMOUNTED ON CONCRETE SLAB10% SLOPE

1" RUBBER ROOFING PAD

1'-10"1'-4"

1'-2"

2'-6

"

8"

10"HRV OA 14"x8" (INSUL)

EXISTINGEXTERIORWALL

MECHANICAL PIPING

4"x4"x38" ELASTROMIC PAD

W/ 38"Ø HILTI KWIK BOLT TZMECHANICAL ANCHOR(MIN. 2' EMBEDMENT)

NOTE: SCAN SLAB PRIORTO INSTALLING ANCHORAGEDO NOT INTERFERE ORDAMAGE ANY REINFORCING

SCALE = NTS

ROOF INFILL DETAIL (STRUCTURAL)A1

1A1

EXISTING CONCRETE ROOF SLAB(MIN. THICKNESS 100mm)

10mm Ø HILTI ADHESIVE ANCHORS @ 12" o.c.W/ 50mm (MIN.) EMBEDMENT

SIZE OF EXISTING OPENING TOBE SITE VERIFIED5mm THINK STEEL PLATEFASTENED TO U/S OF SLAB

NEW 20MPa CONC. ROOF SLAB TOMATCH EXISTING DEPTH

NOTES:USE PRE-MIX CONCRETE ONLY.

10mm ANCHORS @ 12"AROUND PERIMETER

5mm THINK STEEL PLATE

EXISTING ROOF SLAB

ISOMETRICSECTION

NEW CONC. INFILL

DOWEL EPOXYMIN'M 200mm EMBEDMENT

10M REINFORCEMENT @200mm o.c. BOTH WAYS

DOWEL EPOXY INTO EXISTINGROOF SLABMIN'M 200mm EMBEDMENT

10M REINFORCEMENT @200mm o.c. BOTH WAYS

8"2" XX

MAKE GOOD ALL ROOFINGFINISHES TO MATCH EXISTING

All drawings, specifications and related documents are the copyright propertyof the Engineer and must be returned upon request. Reproduction of drawings,specifications, and related documents in part or whole is forbidden without the

Engineers' written permission.

The contractor must check and verify all dimensions on the job prior tostart of construction.

DRAWINGS ARE NOT TO BE SCALED

Scale:

REV DATE:

Drawing No.:

Contract No.:

Project No.:

Date:

Approved:Checked:

Checked:Drawn:

Design:

Drawing Title:

RevisionsDateByNo.

Facsimile: (613) 345-0008Telephone: (613) 345-0400

Web: www.EastEng.com100 Strowger Blvd. Suite 207Brockville, Ont. K6V 5J9

Eastern Engineering Group Inc.

6/20/2018

ROOF PLANELECTRICAL FLOOR PLAN

- - MM

MP 12-07-17

8051

ME3

0 MP 2018-02-02 FOR REVIEW

1 MP 2018-04-23 FINAL REVIEW

2 GB 2018-05-30 FOR TENDER & PERMIT

3 GB 2018-06-13 LAYOUT CLARIFICATION

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

Scale:

Horizontal: AS SHOWN

Vertical: AS SHOWN

Project Title:

478 Main St. EastWinchester, Ontario

WINCHESTEROLD TOWN HALL THEATRE

HVAC MODIFICATIONS

P

R

O

J

E

C

T

N

O

R

T

H

Telephone: (613) 499-207768 William St. Suite 200Brockville, Ont.