MOTIVATING MEMORANDUM
APPLICATION IN TERMS OF SECTION 31 OF THE DEVELOPMENT FACILITATION
ACT, 1995, FOR THE ESTABLISHMENT OF A LAND DEVELOPMENT AREA ON:
PPOORRTTIIOONN 117733 OOFF TTHHEE FFAARRMM RRAANNDDFFOONNTTEEIINN 224477--IIQQ
TO BE KNOWN AS:
RRAANNDDFFOONNTTEEIINN EEXXTTEENNSSIIOONN 22
Prepared by: Adv PJ Steyn
Futurescope Town and Regional Planners
Applicant's Tel No: 011-955-5537
Applicant's Fax No: 086-612-8333
Applicant‟s e-mail: [email protected]
Client: Continental Oil Mills (Pty) Ltd
Date: March 2012
Reference:
i
- CONTENTS -
EXECUTIVE SUMMARY
1. INTRODUCTION 1
2. BACKGROUND INFORMATION 3
3. BRIEF 4
4. GENERAL INFORMATION 5
4.1 Locality 5
4.2 Property description, size and ownership 5
4.3 Existing zoning 5
4.4 Existing land use 6
5. PHYSICAL FEATURES 7
5.1 Topography 7
5.2 Flood lines 7
5.3 Vegetation 8
5.4 Geotechnical investigation 8
5.5 Dolomite Stability Investigation 9
5.6 Accessibility 10
6. LEGAL ASPECTS 11
6.1 Mineral rights 11
6.2 Conditions of title 11
6.3 Servitudes 12
6.4 Special Power of Attorney 12
6.5 Bondholder‟s Consent 12
7. SERVICES 13
7.1 Civil Services Scheme Report 13
7.2 Electrical Services Scheme Report 14
7.3 Traffic Impact Study 15
8. ENVIRONMENTAL IMPACT ASSESSMENT 17
9. APPLICATION 22
ii
10. MOTIVATION 23
10.1 Introduction 23
10.2 Compliance with Chapter 1-Principles of the DFA 23
10.3 Compliance with Randfontein SDF 28
11. LAND DEVELOPMENT AREA: MOTIVATION 30
11.1 Locality and linkages with existing business activities 30
11.2 Need and desirability 30
11.3 Design of Land Development Area 32
11.4 Supportive land uses 34
13. SUMMARY / CONCLUSION 35
- ANNEXURES -
A : Locality Plans 36
B : Deed of Transfer 38
C : Power of Attorney 46
D : Zoning Certificate 49
E : Land Use Plan 51
F : Zoning Plan 53
G : Geotechnical Report 55
H : Dolomite Stability Investigation 72
I : Conveyancer Certificate 133
J : Harmony Gold Correspondence 136
K : Land Surveyor‟s Certificate 138
L : Correspondence re Bondholder‟s Consent 141
M : Civil Services Scheme Report 146
N : Electrical Services Report 178
O : Traffic Impact Study 186
P : R31 Scoping Report 232
Q : Proposed Layout Plan of Land Development Area 318
R : Extract from Map 10 of Randfontein SDF 320
S : Map 2 documentation and Draft Conditions 322
of Establishment
iii
- EXECUTIVE SUMMARY -
Application is made to the Gauteng Development Tribunal for the
following, namely:
Details of the application / relief sought from the Gauteng Development
Tribunal are as follows, namely:
a) Approval for the establishment of a Land Development Area on
Portion 173 of the farm Randfontein 247-IQ, to be known as
Randfontein Extension 2, consisting of one erf zoned „Commercial‟
and two erven zoned „Undetermined‟;
b) Removal of Conditions (2), (3), (4), (5) and (6) from Deed of Transfer
0812/2000;
c) Approval of the Draft Conditions of Establishment for the proposed
Land Development Area, to be known as Randfontein Extension 2;
and
d) Approval of Randfontein Amendment Scheme 672 and Amendment
Scheme 428.
The proposed land development area will be located on the above land
portions, located to the east of Homestead Avenue, Randfontein. Access
will be obtained from Homestead Avenue.
It is the intention to use the proposed Land Development Area for further
expansions of the plant of Continental Oil Mills, located to the east of the
proposed Land Development Area.
iv
The proposed layout of Randfontein X2 is shown on the attached plans.
Provision is made for the following erven:
LAND USE NO. OF STANDS ERF NUMBERS AREA OF STANDS % OF AREA
Commercial 1 1 3,8538ha 82.4
Undetermined 2 2 & 3 0,4167ha 8.7
Public Road 0,4078ha 8.9
The application is supported by reports on the following, namely
geotechnical conditions, environmental issues, traffic impact and a
services scheme report.
The name allocated to the porposed development area / township is
Randfontein Extension 2.
The proposed development complies with the general principles for
development as contained in Chapter 1 of the Development Facilitation
Act, as well as the Gauteng Planning and Development Act. It is also in
line with the Spatial Development Framework of the Randfontein LM.
motivating memorandum: lda: rndf x2 1
1 INTRODUCTION
Continental Oil Mills (Pty) Ltd is the owner of a number of Southern Africa‟s
best known edible oil brands, including household names such as Excella
Oil, Pan Oil, Conti Canola Oil, Cardin Pure Sunflower Oil, Conti Mayonnaise
and Conti Dips. In addition to its consumer brands, Continental Oil Mills also
manufactures and markets a wide range of bulk products for the catering
and hospitality industries. Among others, these include brands like
Copperfield Oil, Royale Cuisine Oil and Sunfield Deli.
Thanks to this rich heritage in the industry, Continental Oil Mills has always
been at the forefront of food processing and oil expressing technology.
With packaging capacities of over 300,000 litres per day, the Continental
Oil Mills plant is one of the most modern and highly rated of its kind in the
Southern Hemisphere. A brand new crushing plant, commissioned in 2008,
is capable of processing 1,000 tonnes of sunflower seed per day.
As the largest independently owned oil expresser in Southern Africa, and
one of the top marketers in its category, Continental Oil Mills‟ brands hold
a leading share of the sunflower and blended edible oils market in top and
bottom end retail as well as the wholesale trade. Brands include Excella
Pure Sunflower Oil, Pan Pure Sunflower Oil, Cardin Pure Sunflower Oil, S‟Lite
Pure Vegetable Oil, Vista Cottonseed Oil and Conti Canola Cooking &
Salad Oil.
Because of its independent ownership, Continental Oil Mills is also well
positioned to compete with the larger corporate players in the industry. As
such, Continental Oil Mills is able to react quickly and efficiently to
category trends and focus on its competitive advantages under virtually
any set of market circumstances.
motivating memorandum: lda: rndf x2 2
Continental Oil Mills has also been in the export market for several years
and is experiencing steady growth among its business links with many
countries in Sub Saharan Africa.
Constant research and development into new product lines and the
improvement of current ranges ensure that Continental Oil Mills supplies
only the highest quality products into the market place.
The existing plant of Continental Oil Mills is located to the east of the
proposed Land Development Area, between a railway line and the R28
(Main Reef Road). This property is zoned „Industrial‟ in terms of the
provisions of the Randfontein Town Planning Scheme, 1988.
The client – Continental Oil Mills (Pty) Ltd - being the owner of the subject
property, is in need of expansion of its current operations, and therefore
this application is lodged in order to obtain the required land use rights for
such activities on the subject property.
It is the intention to apply for the following, namely:
a) Approval for the establishment of a Land Development Area on
Portion 173 of the farm Randfontein 247-IQ, to be known as
Randfontein Extension 2, consisting of one erf zoned „Commercial‟
and two erven zoned „Undetermined‟;
b) Removal of Conditions (2), (3), (4), (5) and (6) from Deed of Transfer
0812/2000;
c) Approval of the Draft Conditions of Establishment for the proposed
Land Development Area, to be known as Randfontein Extension 2;
and
d) Approval of Randfontein Amendment Scheme 672 and Amendment
Scheme 428.
motivating memorandum: lda: rndf x2 3
2 BACKGROUND INFORMATION
2.1 The application is for the establishment of a land development area
on Portion 173 of the farm Randfontein 247-IQ.
ANNEXURE A - LOCALITY PLAN
2.2 The subject property is located within the area of jurisdiction of the
Randfontein Local Municipality.
2.3 The subject property is owned by Continental Oil Mills (Proprietary)
Limited.
ANNEXURE B – DEED OF TRANSFER
2.5 Futurescope Town and Regional Planners CC was appointed by the
registered owner, to apply in terms of the provisions of the
Development Facilitation Act, 1995 for the establishment of a land
development area on the subject property.
ANNEXURE C – POWER OF ATTORNEY
motivating memorandum: lda: rndf x2 4
3 BRIEF
The project team for the development application consisted of the
following professionals, namely:
Town Planning and Futurescope Town and Regional
Project Management Planners (Petrus Steyn and Manda
Smit)
Civil Engineering Lidwala (Koos Coetzee)
Geotechnical issues Soilkraft CC (Isak Breytenbach)
Electrical Engineering Lidwala (Terence Chauke)
Traffic Engineering TTT Africa (Mike Meijer)
Environmental issues Web Environmental Consultancy
(Bronwen Griffiths)
Land Surveying FJ Loock Land Surveyors
(Leroy Coetzee)
Attorneys Adriaan Venter and Associates
This application is the result of extensive work conducted by the various
professionals, involved in the project.
It is submitted that, on the basis of the specialist reports, as well as the
motivation submitted hereby, the proposed development‟s sustainability,
need and desirability is proofed to the Gauteng Development Tribunal.
motivating memorandum: lda: rndf x2 5
4 GENERAL INFORMATION
4.1 LOCALITY
The subject property, as defined above (par 2.1) is located to the
west of the existing Continental Oil-plant, south-east of a residential
development, located on Erf 139, Robin Park and north of the
residential areas of Hectorton and Homelake. Cognisance should,
however, be taken of major arterial roads, namely Homestead
Avenue and Cemetery Road Extension, as well as a railway line,
separating the proposed Land Development Area from adjoining
areas.
Access to the development will be obtained from the existing
Homestead Avenue as well as future K197 (to be discussed in more
detail in par 7.3).
ANNEXURE A - LOCALITY PLANS
4.2 PROPERTY DESCRIPTION, SIZE AND OWNERSHIP
In terms of the Deed of Transfer, the property is described as Portion
173 of the farm Randfontein 247-IQ, measuring 4,6783ha. The
property is owned by Continental Oil Mills (Proprietary) Limited.
ANNEXURE B - DEED OF TRANSFER
4.3 EXISTING ZONING
The subject property is located within the boundaries of the
Randfontein Town Planning Scheme, 1988, and is zoned as follows:
Zoning: Agricultural
Coverage: 40%
motivating memorandum: lda: rndf x2 6
Height Zone: „0‟ – maximum height 2 storeys
Uses permitted: Agricultural building and agricultural land
Building line: 10m street building line and 5m on other sides
ANNEXURE D - ZONING CERTIFICATE
4.4 EXISTING LAND USE
A number of storage facilities, as per approved building plans, are
located on the property. The land development area is surrounded
by the following land uses, namely:
Continental Oil-plant (east);
Residential development, part of Robin Park (west); and
Residential areas of Hectorton and Homelake (south).
ANNEXURE E – LAND USE MAP
Zoning of surrounding properties are indicated on the attached
Zoning Map. It should be noted that this map does not correspond
with the A-series maps provided by the Randfontein Local
Municipality, but actually reflects the factual situation pertaining to
the zoning of properties to the north-west of the Land Development
Area is reflected on the zoning map attached.
ANNEXURE F - ZONING MAP
From the Zoning Map it is clear that properties to the north–east of
the proposed Land Development Area is predominantly residentially
zoned, whilst properties to the south–west are a mix of residential
and business related properties.
motivating memorandum: lda: rndf x2 7
5 PHYSICAL FEATURES
5.1 TOPOGRAPHY
In terms of the status quo, the topography is relatively level and has
been significantly modified by previous activities on the site – both
by Continental Oil and during the building of the railway line
adjacent to the site. The proposed development will thus not
significantly further alter the topography of the site.
The site has a gentle slope of about 1% (one percent) rising from the
south-western boundary to about two-thirds of the site’s length
where the highest point is found, before gently dropping again
towards the north-eastern boundary of the site near the railway
station.
The site is characterised by a four relatively flat terraces, with very
shallow connecting ramps between the each. These terraces and
ramps are extant but currently in the case of three of the terrace
areas are still bare ground.
The dominant impacts to topography will be experienced during the
site clearance and earthworks portion of the construction phase per
phase. Mitigation measures are however feasible and suitable, and
will be included in the EMP.
5.2 FLOOD LINES
The property is not affected by any flood lines.
motivating memorandum: lda: rndf x2 8
5.3 VEGETATION
The site is already highly modified due to a series of past actions to
the site – beginning with the long-term fire control maintenance
operations, the railway line installation and finally the beginning of
the development process at hand. The only real flora species found
were either pioneer grasses or weed species. No large shrubs or trees
were encountered on the site.
Small faunal species commonly found within a suburban area are
expected to occur on the site varying from small rodents such as
mice, to various size birds, as well as small reptile and amphibian
species. These species are all however common within the wider
suburban area and will re-colonise the site once the construction
process is finished.
5.4 GEOTECHNICAL INVESTIGATION
Soilkraft CC was appointed to conduct a phase one
reconnaissance type of survey and report for the proposed land
development area, as provided for in the Development Facilitation
Regulations.
ANNEXURE G - GEOTECHNICAL REPORT
According to the report, a surface survey was executed and
observations made on the property, combined with existing maps
and the author‟s knowledge was used in order to formulate an idea
of the geotechnical characteristics of the site.
It was, amongst others, concluded and recommended that:
motivating memorandum: lda: rndf x2 9
5.4.1 The subject property is located on the Black Reef Formation of
the Transvaal Supergroup and is therefore considered as a
dolomitic area by current practice. In this regard it is
recommended that a full dolomite stability investigation be
conducted;
5.4.2 Referring to soil profiles it is recommended that should the
dolomite stability investigation, as well as the undermining
study proof the land is suitable for the proposed development,
a soil investigation be conducted in order to verify founding
conditions and to make recommendations for design and
construction purposes; and
5.4.3 Based on the findings and further studies recommended in the
report, the site is at this stage regarded as being of
intermediate favourability for the proposed development.
5.5 DOLOMITE STABILITY INVESTIGATION
Following the above-mentioned geotechnical report a „Dolomite
Stability Investigation‟ was conducted by RMS Consulting Earth
Scientists.
ANNEXURE H – DOLOMITE STABILITY INVESTIGATION
In this report it is, inter alia, concluded that the geological conditions
underlying the property favour the delineation of the site into a
single zone with an inherent classification of Class 4(6)//6.
Referring to the development potential it is stated that no restrictions
are placed on the type of commercial development that may be
regarded as suitable.
motivating memorandum: lda: rndf x2 10
5.5 ACCESSIBILITY
Access to and from the proposed land development area will be
obtained from the existing Homestead Avenue, whilst provision is
also made for access from the proposed K197. This will be discussed
in more detail in par (7.3).
motivating memorandum: lda: rndf x2 11
6 LEGAL ASPECTS
Legal issues are outlined in the attached Conveyancer‟s and Land
Surveyor‟s Certificates.
6.1 MINERAL RIGHTS
All mineral rights have been allocated to the State.
6.2 CONDITIONS OF TITLE
According to the attached Conveyancer Certificate the following
issues are of importance, namely:
ANNEXURE I – CONVEYANCER’S CERTIFICATE
6.2.1 There is a bond registered in favour of HBZ Bank Limited. This is
addressed in (6.5) below;
6.2.2 Conditions 2, 3 and 4 refers to certain issues applicable to and
enforceable by the Randfontein Gold Mining Company,
Witwatersrand, Limited, which conditions need to be removed
from the Deed of Transfer;
6.2.3 Condition 5 provides for the mentioned Randfontein Gold
Mining Company to waive conditions 2, 3 and 4. Due to the
fact that the responsible company is Harmony Gold, this
matter was referred to them for feedback.
Feedback was received from Harmony Gold indicating that
they consent to the removal of these conditions.
ANNEXURE J – HARMONY GOLD CONSENT
motivating memorandum: lda: rndf x2 12
6.3 SERVITUDES
A self-explanatory report is this regard is attached.
Of importance is that Conditions (3) and (5) refers to the Randfontein
Estates Gold Mining Company, now being a full subsidiary of
Harmony Gold Mining Company Limited, whose consent has been
obtained, as per (6.2.3) above.
ANNEXURE K- LAND SURVEYOR’S CERTIFICATE
6.4 SPECIAL POWER OF ATTORNEY
Power of Attorney was obtained from the property owner, being
Continental Oil Mills (Proprietary) Limited, being the legal owner of
the subject properties.
ANNEXURE C - POWER OF ATTORNEY
6.5 BONDHOLDER’S CONSENT
Following on various efforts in order to obtain the bondholder‟s
consent, correspondence were received from the following, namely:
6.5.1 HBZ Bank, dated 15 November 2011 – stating that the bank
does not have any guarantee requirements as the client has
fully settled liabilities with them (the Bank); and
6.5.2 HBZ Ban, dated 16 November 2011 – addressed to Dasoo
Attorneysstating that the bond over Portion 173 Randfontein
247, and other properties, should be cancelled.
It should therefore be clear that the bond has been paid-off and
that the relevant attorneys are in process of addressing the
cancellation of the bond. Further proof, if available, will be
submitted at the Pre-Hearing Conference.
ANNEXURE L –CORRESPONDENCE RE BONDHOLDER’S CONSENT
motivating memorandum: lda: rndf x2 13
7 SERVICES
Both a Civil and Electrical Services Scheme Report for the proposed Land
Development Area were compiled by Lidwala Consulting Engineers, whilst
a Traffic Statement was compiled by TTT-Africa.
7.1 CIVIL SERVICES SCHEME REPORT
ANNEXURE M – CIVIL SERVICES SCHEME REPORT
The following issues are highlighted in the Civil Services Scheme
Report, namely:
7.1.1 All designs for civil services are based on standards as set out
in the Guidelines for the Provision of Engineering Services for
Residential Townships, 1994, as well as Guidelines for Human
Settlement Planning and Design, 2000 and special
requirements from the Randfontein Local Municipality;
7.1.2 Internal services will be the responsibility of the developer, and
design standards are also based on the documentation
referred to in (7.1.1) above;
7.1.3 The internal access roads will remain private and will therefore
be maintained by the developers;
7.1.4 Although there is an existing storm water system in place, this
will only cater for minor storms. It is proposed to integrate the
road network with the storm water management for the
development. Street designs will be of such a nature to cater
for storm water drainage;
motivating memorandum: lda: rndf x2 14
7.1.5 The site is well served by existing bulk infrastructure – referring
to water and sewer. Water can be provided from the existing
lines along Homestead Avenue. From the analysis it is clear
that sufficient bulk water is available to serve the normal
operational demand of the development without negatively
affecting the surrounding area‟s water supply. Provision will be
made for on-site storage of water for fire prevention purposes;
and
7.1.6 Sewerage connections are available on the south western
corner at the intersection of Homestead Avenue and
Cemetery Road.
7.2 ELECTRICAL SERVICES SCHEME REPORT
ANNEXURE N – ELECTRICAL SERVICES SCHEME REPORT
The following issues are highlighted in the Electrical Services Scheme
Report, namely:
7.2.1 Currently there is a minisub on the South-Western corner on
the outside of the property that is a dedicated supply to the
site. The minisub has an installed capacity of 500kVA and the
property has been allocated a supply point rated at 350A;
7.2.2 An increase in the power drawn from this installed supply point
is subject to an application with the municipally and the
availability of spare capacity in the area and the municipality
approving this application and allocating the additional
supply;
7.2.3 The response from the Randfontein Municipality to this report is
solicited as soon as possible; and
motivating memorandum: lda: rndf x2 15
7.2.4 Agreement as to the execution of external services by the
Developer on behalf of the Council must also be reached if
that route is to be followed, which Agreement is to be
incorporated into the Services Agreement.
7.3 TRAFFIC IMPACT STUDY
ANNEXURE O – TRAFFIC IMPACT STUDY
The following issues relating to the envisaged traffic impact are
addressed in the report namely:
7.3.1 The traffic impact of the proposed development is considered
to be low;
7.3.2 The most important effect of traffic to and from the proposed
land development area will be at the signalised junction of
Homestead Road and Randfontein Road with the R28 (Main
Reef Road). Analysis in the traffic report indicates that there is
an existing lack of capacity at this intersection. This can,
however, be alleviated by the addition of a second right-turn
lane, and it would be reasonable for the developer to pay
towards the cost of this improvement;
7.3.3 As will be noted from the proposed layout plan for the Land
Development Area, the property is intersected by the
proposed K197 and its service roads. Discussions are,
however, underway with Gautrans in order to investigate the
possibility of relocating the service road intersection more to
the north of the proposed land development area, thereby
minimising the current negative effect on this development.
motivating memorandum: lda: rndf x2 16
Once this has been concluded the report and layout plan will
be amended accordingly;
7.3.4 From a traffic point of view it is recommended that the
proposed development be approved, with or without an
internal link for traffic movement between erven 1 and 2.
motivating memorandum: lda: rndf x2 17
8 ENVIRONMENTAL IMPACT ASSESSMENT
WEB Environmental Consultancy compiled an Environmental Evaluation /
Environmental Scoping Report in terms of Regulation 31 of the DFA.
ANNEXURE P – R31 SCOPING REPORT
The document at hand – the Environmental Evaluation (EE) and
accompanying Environmental Management Programme (EMP) – has
been prepared as part of the formal Development Facilitation Act (DFA)
application being submitted for the proposed development of Portion 173
Randfontein 247IQ owned and to be operated by Continental Oil Mills
(Pty) Ltd. The proposal being the use of the site, which is adjacent to the
Mill in Randfontein for storage and distribution of products and some
materials used in the process on the main Mill site. Specifically the
document is the summary of the environmental issues and concerns for the
site it surrounds, as it currently stands and in terms of the proposed
development thereof.
The objectives of the environmental consideration of the site are, inter alia,
to:
minimise disturbance to the environment – i.e. biological, physical and
socio-economic;
identify impacts and propose measures for their mitigation;
address impacts in terms of their spatial and temporal aspects;
identify potential environmental benefits, such that the development
may enhance the greater environment of the area;
identify the actions to be taken and related responsibilities to ensure
that sustainable environmental management is effected; and
be a “cradle to grave” product – the linked EMP will be used to ensure
that the conclusions drawn in the EIA are carried forward in the project,
this as an EMP is a „live document that can be reviewed and updated
motivating memorandum: lda: rndf x2 18
over time to ensure optimal environmental management across the life
of the development.
The site occurs within the mixed land-use area of Randfontein, in the
western part of Gauteng province.
The application at hand is for the formalisation of the change of land-use
for the site from a relic agricultural farm portion to commercial. The
commercial land-use is to allow for warehousing for the Mill products and
some raw materials in two (2) warehouses, one (1) extant, in close
proximity to the existing Mill site, as well as dedicated storage tanks for
some of the vegetable oil produced. For full details of the application
proposal refer to the full DFA application. Note that the final proposed
layout plan was considered in the generation of this environmental
evaluation process – refer to the issue consideration section of the
document at hand (Sect. 7). It should be noted that a knock-on of this
proposed development is the enhancement of the surrounding area‟s
infrastructure, especially storm water control and road layouts.
Given these points, the environmental evaluation process was started with
the aim being to consider the feasibility of carrying out the proposed
development on the site.
The fact that the proposal is related to an existing and key demographic
feature in the area, the project is deemed to be compatible with the local
authority‟s Spatial Development Framework (RSDF) for the greater area.
The specifics of this are considered in detail in the main application
document.
WEB Environmental, on behalf of Continental Oil Mills, is thus carrying out
the Environmental Evaluation process forming part of the Development
Facilitation Act Application. In terms thereof this document serves as the
motivating memorandum: lda: rndf x2 19
conclusion of the Environmental Impact consideration of the project, and
provides a formal recommendation in this regard.
It is acknowledged that construction may have begun prior to obtaining
all required permits and authorisations relevant to the proposed land-use
on the site, and thus the DFA-process at hand to rectify this oversight.
It should however be noted that, as the proposal does not trigger an
Environmental Impact Assessment-process, as required by NEMA, nor any
other environmental related legislation, as reviewed in detail in the section
above, that the proposal cannot be deemed to be illegal in terms of any
environmental legislation.
PUBLIC PARTICIPATION PROCESS
As per the EIA Public Participation Guideline (PPP) document {Guideline 4,
Government Gazette of 19th May 2006}, the need for a suitable process is
critical as: ―… This stems from the requirement that people have the right
to be informed about potential decisions that may affect them and that
they must be afforded an opportunity to influence those decisions.
Effective public participation also improves the ability of the competent
authority to make informed decisions and result in improved decision-
making as the views of all parties are considered.
However, given that a separate EIA was not required, the public
participation process was limited to the public open day held as part of
the overall DFA application process. All information / concerns / issues /
objections provided during that process have been integrated into the
specialist study investigations and have been considered in detail in the
document at hand.
motivating memorandum: lda: rndf x2 20
No specific concerns were raised by I&APs for the DFA-process at hand,
other than those already considered by the project team. The project
team determined that the dominant issues would relate to:
Traffic congestion and impacts on the road network;
Implications on hydrology and storm water issues;
Geology and soil conditions;
Potential pollution generation – especially in terms of air pollution (i.e.
dust generation);
Visual / aesthetic impacts;
Sense of place; and
Cumulative impacts.
CONCLUSION / RECOMMENDATION
Based on the EIA process detailed above, it is believed that the proposed
development (as detailed in this document) for a commercial site
associated with the adjacent Continental Oil Mills site found on Portion 173
Randfontein 247IQ, will not have any significant negative impacts after
mitigation measures are implemented, on the surrounding environment,
and will in fact enhance and reduce the risk to the environment.
As per the legal review carried out in Sect. 2 of the document, it has been
determined that no environmentally-related authorisations are required for
the site.
All of the identified potential impacts have had mitigatory measures
presented and, if the EMP is successfully implemented, would reduce the
risk of realisation over the current status quo.
motivating memorandum: lda: rndf x2 21
ENVIRONMENTAL IMPACT STATEMENT
Based on the above, it is thus recommended that this report for the
proposal for the site, Portion 173 Randfontein 247IQ, including all
accompanying information, and the documents forming the remainder of
the DFA application, be used as motivation to approve the application,
thus allowing the proposed development to proceed.
motivating memorandum: lda: rndf x2 22
9 APPLICATION
This application is for the following, namely:
a) Approval for the establishment of a Land Development Area on
Portion 173 of the farm Randfontein 247-IQ, to be known as
Randfontein Extension 2, consisting of one erf zoned „Commercial‟
and two erven zoned „Undetermined‟;
b) Removal of Conditions (2), (3), (4), (5) and (6) from Deed of Transfer
0812/2000;
c) Approval of the Draft Conditions of Establishment for the proposed
Land Development Area, to be known as Randfontein Extension 2;
and
d) Approval of Randfontein Amendment Scheme 672 and Amendment
Scheme 428.
The proposed Land Development Area is indicated on ANNEXURE Q.
motivating memorandum: lda: rndf x2 23
10 MOTIVATION
10.1 INTRODUCTION
This section of the report deals with the issues underlying the
application, need and desirability and the guidelines for
development in the area as outlined by the respective authorities.
Attention will be given to the development principles as contained
in the Development Facilitation Act (also referring to the Gauteng
Development Act and the National Environmental Management
Act), the Spatial Development Framework for the Randfontein Local
Municipality, as well as other related issues.
10.2 COMPLIANCE WITH CHAPTER 1 PRINCIPLES OF THE DFA
One of the major objectives with a land development application is
to adhere to / comply with land development and environmental
principles as contained in the Development Facilitation Act (DFA) as
well as the National Environmental Management Act (NEMA). This
section addresses compliance with the most relevant principles of
the Development Facilitation Act:
motivating memorandum: lda: rndf x2 24
Development Facilitation Act Position of the proposed development
Policy, administrative practice and laws should provide for
urban and rural land development and should facilitate the
development of formal and informal, existing and new
settlements
Policy, administrative practice and laws should promote
efficient and integrated land development
The proposed development will adhere to this principle due to
the fact that a transition zone will be created between the
existing industrial activities (east of the proposed land
development area) and the residential area, hospital,
guesthouse and crèche activities located to the west of the
proposed land development area. It will ensure that a buffer
area is created and that there is an integration, but not conflict
between, various land uses in this area. In this regard the
Randfontein SDF (see par 10.3) also provide for this specific area
to be utilised for mixed land uses.
Integration of social, economic, institutional and physical
aspects of land development
In this regard it is important to note that the specific area has
been designated for mixed land uses in the Randfontein SDF
(par 10.3). Although the development does not cater for a
number of different land uses, it will, however, as discussed
motivating memorandum: lda: rndf x2 25
Development Facilitation Act Position of the proposed development
above, contribute towards the integration of various other land
uses in this area and will ensure / contribute thereto that the
policy ideas expressed in the Randfontein SDF become reality.
Optimise the use of existing resources including such resources
relating to agriculture, land, minerals, bulk infrastructure, roads,
transportation and social facilities
Existing infrastructure in this area, provided for this type of land
use, will be utilised optimally.
Encourage environmentally sustainable land development
practices and processes
As was noted / concluded in the Environmental Report (see par
8), based on the EIA-process, it is believed that the proposed
development for a commercial site associated with the
adjacent Continental Oil Mills will not have any significant
negative impacts after mitigation measures are implemented,
on the surrounding environment, and will in fact enhance and
reduce the risk to the environment. As per the legal review
carried out in Sect. 2 of the document, it has been determined
that no environmentally-related authorisations are required for
the site. All of the identified potential impacts have had
mitigatory measures presented and, if the EMP is successfully
implemented, would reduce the risk of realisation over the
current status quo.
motivating memorandum: lda: rndf x2 26
Development Facilitation Act Position of the proposed development
Members of communities affected by land development should
actively participate in the process of land development
In this respect a Public Open Day was arranged for 27
November 2010 with the purpose to introduce the proposed
development to the public. Notices of this meeting were
published in the Randfontein Herald, as well as on-site.
However, no member of the public attended this information
session.
Policy, administrative practice and laws should promote
sustainable land development at the required scale
It is submitted that the development of the proposed land
development area is sustainable from an economic, as well as
environmental point of view and will as such contribute towards
the overall development of this area. It is also indicated that
the proposed land development area, and the activities
envisaged on the property fit in with the provisions of the
Randfontein SDF.
Each proposed land development area should be judged on its
own merits and no particular use of land, such as residential,
commercial, conservational, industrial, community facility,
mining, agricultural or public use, should in advance or in
general be regarded as being less important or desirable than
any other use of land
Cognisance was taken of some comments / complaints by the
Netcare Hospital referring to the possible impact of the existing
operations of Continental Oils on the hospital. These issues were
taken into consideration, and it is submitted that the proposed
land development area, as well as the actual activities
envisaged on the property, will ensure that there is a buffer
motivating memorandum: lda: rndf x2 27
Development Facilitation Act Position of the proposed development
between the current activities, which could be of a nuisance to
the hospital, and the hospital itself. In this regard, as outlined
above and below, Randfontein LM in their SDF for this specific
area, provided for this area to be utilised for mixed land uses.
By zoning the area „Commercial‟ and not full „Industrial‟
provision is made for a transition zone, whereby any possible
negative effects of the existing developments to the east could
be mitigated. Therefore, in the light of the motivation provided,
it is submitted that this proposed land development area should
be considered on its own merit, taking into consideration the
role it will play in the broader context.
motivating memorandum: lda: rndf x2 28
10.3 COMPLIANCE WITH RANDFONTEIN SDF
In this regard reference is made to the „Review of the Spatial
Development Framework for Randfontein Local Municipality, June
2008‟ (RSDF), as adopted on 16 July 2008 by the Randfontein Local
Municipality.
The following issues, as contained in the SDF, should be noted,
namely:
10.3.1 According to the Urban Land Use Map (Map 2.2) the land use
on the subject property was identified as being „Industrial‟;
10.3.2 The proposed Land Development Area is located inside both
the Provincial, as well as the Municipal Urban Edges (Map 9 of
the RSDF);
10.3.3 The following spatial development vision was adopted,
namely to identify areas for social and economic
opportunities in order to create sustainable development in an
integrated manner1. Linked to this certain planning principles2
were also adopted, including the following, namely to:
11.3.1.1 Enhance Randfontein as a prominent sub-regional
decentralized node within the West Rand and
Gauteng; and
11.3.1.2 Creation of job opportunities in the close proximity to
residential areas;
1 Par 5.2, p46 of Randfontein SDF, 2008 2 Par 5.3, pp 46-47 of Randfontein SDF, 2008
motivating memorandum: lda: rndf x2 29
10.3.4 Referring to spatial objectives it is stated that economic
opportunities should be aligned and identified along major
development corridors3. Three types of development corridors
have been identified, namely activity corridors, activity spines
and activity streets. Homestead Avenue, and therefore the
future alignment of the K197, has been identified as an activity
street4. An activity street is defined as forming major linkages
between the different sections of the urban area as well as
activity corridors and spines. These roads normally attract
sufficient passing trade and provide important opportunities
for the stimulation of business development and community
facilities within neighbourhood nodes;
10.3.5 According to the SDF, Map 10, the area where the proposed
Land Development Area is located, is earmarked for „Future
Mixed Land Use‟5. In the SDF, mixed land use areas are
described as areas where suitable and compatible residential
and non-residential land uses are integrated. Non-residential
land uses can, according to the SDF, include businesses,
offices and commercial activities6.
ANNEXURE R – EXTRACT FROM MAP 10, RANDFONTEIN SDF, 2008
3 Par 5.4, p47 of Randfontein SDF, 2008 4 Map 10, Randfontein SDF, 2008 5 Map 10, Spatial Proposals, Randfontein SDF, 2008 6 Par 5.6.1.4, p53, Randfontein SDF, 2008
motivating memorandum: lda: rndf x2 30
11 LAND DEVELOPMENT AREA: MOTIVATION
The following issues will be discussed in this regard, namely:
Locality and linkages with existing business activities;
Need and desirability;
Design of Land Development Area; and
Supportive land uses.
11.1 LOCALITY AND LINKAGES WITH EXISTING BUSINESS ACTIVITIES
As indicated above, the subject property is located to the west of
the existing Continental Oil Mills in Randfontein. The subject property
is also owned by Continental Oils and therefore strategically located
for any expansions to the existing operations.
In the light of the above the need was identified to expand the
current operations to the subject property.
11.2 NEED AND DESIRABILITY
Referring to the need for the establishment of this specific Land
Development Area, it is submitted that it was argued that the
subject property is strategically located in relation to the existing
operations of Continental Oil Mills, Randfontein. Further to this the
existing property is fully developed and therefore further expansions
to the operations need to be on this property.
It should be noted that the existing property, namely that to the east
of the subject property, is totally developed and locked in such a
manner that there are no possible extensions to that land.
motivating memorandum: lda: rndf x2 31
Due to new developments at Continental Oil Mills, land is required in
order to establish new warehouses, as well as silos.
Referring to the desirability of the land for this use the following
should be noted:
11.2.1 The proposed land development area will be utilised by
Continental Oils for the expansion of their current activities,
located to the east of the land development area. In this
regard it should be noted that the current developments to
the east can be considered to be hard-core industrial
activities, whilst the envisaged developments on the subject
property will be more of a commercial type of use and the
impact thereof would be lower than that of the current
operations;
11.2.2 As outlined above, the Randfontein SDF, when compiled took
into consideration existing land uses, as well as the future
development of this area, recognised the need for mixed land
use activities and therefore earmarked this area for such uses.
Therefore, from a spatial planning perspective, the proposed
land uses on the subject property will contribute towards the
development of this vacant area, in line with the provisions of
the Randfontein SDF;
11.2.3 Referring to „mixed land use‟ it should be noted that this term
is defined as follows in the Randfontein SDF7, namely:
7 Par 5.6.1.4, p53 of Randfontein SDF, 2008
motivating memorandum: lda: rndf x2 32
„Mixed land use refer to the integration of suitable and
compatible residential and non-residential land uses within the
same area and can include non-residential land uses such as
business, offices and commercial activities. …… Specific
mixed land use zones are proposed adjacent to the main
corridor (R28) – areas north of the CBD, west of the R28‟
It is submitted that the proposed development adheres to this
definition.
11.3 DESIGN OF LAND DEVELOPMENT AREA
In the design of Randfontein X2 cognisance was taken of the existing
property of the client and their needs, as well as the impact of the
proposed K197 on the proposed Land Development Area.
The effect of the proposed road is clear from the layout plan,
indicating that the northern portion of the proposed Land
Development Area, is affected to a large extend by the alignment
of the proposed K197. The impact of the current alignment is that
provision is made for four erven, and the two smaller erven, namely
Erven 3 (2,157m2) and 4 (2,010m2), is a direct result of the proposed
alignment.
The Proposed Layout of Randfontein X2 is shown on the attached
plan.
ANNEXURE Q – PROPOSED LAYOUT PLAN
Provision is made for the following erven in the proposed
Randfontein X2, namely:
motivating memorandum: lda: rndf x2 33
LAND USE NO. OF STANDS ERF NUMBERS AREA OF STANDS % OF AREA
Commercial 1 1 3,8538ha 82.4
Undetermined 2 2 & 3 0,4078ha 8.79
Public Road 0,408ha 8.99
One erf, to be zoned „Commercial‟, as well as two erven zoned
„Undetermined‟, as provided for in the Randfontein Town Planning
Scheme, 1988, are provided for, as well as an area affected by the
alignment of the proposed K197.
The following development control measures are applied for
namely:
Erf 1:
Zoning : „Commercial‟
Primary rights : Distribution centres, storage,
warehouses, limited industrial uses,
including packaging and processing,
laboratories and computer centres
and including offices which are
directly related and subservient to
the main use which is carried out on
the land or in the building
Coverage : 55%, which may be increased with
the consideration of a Site
Development Plan
Height : As per Site Development Plan
Parking : 10 parking bays for employees
10 parking bays for visitors
Loading zones – As per Site
Development Plan
FAR : N/A
motivating memorandum: lda: rndf x2 34
Erven 2 and 3:
Zoning : „Undetermined‟
Primary rights : As per Scheme
Coverage : As per Scheme
Height : As per Scheme
Parking : As per Scheme
ANNEXURE S – MAP 2 DOCUMENTATION AND
DRAFT CONDITIONS OF ESTABLISHMENT
11.4 SUPPORTIVE LAND USES
Due to the fact that provision is made for commercial land uses on
the proposed Land Development Area there is no real need for
other community related supportive land uses in the direct vicinity of
the proposed land development area.
motivating memorandum: lda: rndf x2 35
12 SUMMARY / CONCLUSION
This application is submitted in terms of the Development Facilitation Act,
1995, for the establishment of a land development area to be known as
Randfontein Extension 2, on Portion 173 of the farm Randfontein 247-IQ.
Details of the application / relief sought from the Gauteng Development
Tribunal are as follows, namely:
a) Approval for the establishment of a Land Development Area on
Portion 173 of the farm Randfontein 247-IQ, to be known as
Randfontein Extension 2, consisting of one erf zoned „Commercial‟
and two erven zoned „Undetermined‟;
b) Removal of Conditions (2), (3), (4), (5) and (6) from Deed of Transfer
0812/2000;
c) Approval of the Draft Conditions of Establishment for the proposed
Land Development Area, to be known as Randfontein Extension 2;
and
d) Approval of Randfontein Amendment Scheme 672 and Amendment
Scheme 428.
It is submitted that the proposed development complies with the general
principles for development as contained in Chapter 1 of the Development
Facilitation Act, as well as the Gauteng Planning and Development Act. It
is also in line with the Spatial Development Framework for the Randfontein
LM.