18
UNCLASSIFIED National Positioning Navigation and Timing Architecture Civil GPS Service Interface Committee Meeting Karen Van Dyke, DOT/RITA/Volpe Center Lt Col Patrick Huested, National Security Space Office 15 September 2008

National Positioning Navigation and Timing Architecture · National Positioning Navigation and Timing Architecture Civil GPS Service Interface Committee Meeting ... 15 September 2008

  • Upload
    others

  • View
    31

  • Download
    0

Embed Size (px)

Citation preview

Page 1: National Positioning Navigation and Timing Architecture · National Positioning Navigation and Timing Architecture Civil GPS Service Interface Committee Meeting ... 15 September 2008

UNCLASSIFIED

National Positioning Navigation and TimingArchitecture

Civil GPS Service Interface Committee MeetingKaren Van Dyke, DOT/RITA/Volpe Center

Lt Col Patrick Huested, National Security Space Office15 September 2008

Page 2: National Positioning Navigation and Timing Architecture · National Positioning Navigation and Timing Architecture Civil GPS Service Interface Committee Meeting ... 15 September 2008

2

UNCLASSIFIED

Overview

• PNT Architecture Background

• Architecture Development

• Guiding Principles

• Recommendations

• Next Steps

Page 3: National Positioning Navigation and Timing Architecture · National Positioning Navigation and Timing Architecture Civil GPS Service Interface Committee Meeting ... 15 September 2008

3

UNCLASSIFIED

Foundations

RITA

FAA

FHWA

FRA

DOC

NIST

DHS

USCG

DOI

DOS

NCO

NASA

NII

USAF

AFSPC

USA

USMC

USN

USNO

NGA

NSA

STRAT

JS

AT&L/S&T

PBFA

SAF/USA

SMDC

NRL

SMC

JPDO

““NSSO develop a NSSO develop a National PNT National PNT Architecture”Architecture”

““NPCO will NPCO will initiate an effort initiate an effort

with NSSO”with NSSO”

““RITA will lead RITA will lead effort on behalf of effort on behalf of DOT for the civil DOT for the civil

community”community”

ASD/NII Memo23-Jan-2006

ASD/NII MemoASD/NII Memo2323--JanJan--20062006

NPEC Action Items26-Jan-2006

NPEC NPEC Action ItemsAction Items2626--JanJan--20062006

DOT/RITA Memo

14-Mar-2006

DOT/RITA DOT/RITA MemoMemo

1414--MarMar--20062006

PNT Architecture TOR

11-Jul-2006

PNT Architecture PNT Architecture TORTOR

1111--JulJul--20062006

More Effective & Efficient PNT and an Evolutionary Path for Government Provided Systems & ServicesMore Effective & Efficient PNT and an Evolutionary More Effective & Efficient PNT and an Evolutionary Path for Government Provided Systems & ServicesPath for Government Provided Systems & Services

Page 4: National Positioning Navigation and Timing Architecture · National Positioning Navigation and Timing Architecture Civil GPS Service Interface Committee Meeting ... 15 September 2008

4

UNCLASSIFIED

Primary Objective

Near & Mid Term Decisions Guided

by Architecture

Near & Mid Term Near & Mid Term Decisions Guided Decisions Guided

by Architectureby Architecture

Based on Long Term

Vision

Based on Based on Long Term Long Term

VisionVision

Without Enterprise

Architecture Strategy

Without Without Enterprise Enterprise

Architecture Architecture StrategyStrategy

Cap

abili

tyC

apab

ility

ShouldShould--Be Be ArchitectureArchitecture

Evolved Evolved Baseline Baseline

(EBL)(EBL)

AsAs--Is Is ArchitectureArchitecture System EmphasisSystem Emphasis

ArchitectureArchitectureEmphasisEmphasis

NowNow 5 Years5 Years 10 Years10 Years 15 Years15 Years 20 Years20 Years

“…provide more effective and efficient PNT capabilities focused onthe 2025 timeframe and an evolutionary path for governmentprovided systems and services.” -- Terms of Reference

“…“…provide more effective and efficient PNT capabilities focused onprovide more effective and efficient PNT capabilities focused onthe 2025 timeframe and an evolutionary path for governmentthe 2025 timeframe and an evolutionary path for governmentprovided systems and services.”provided systems and services.” ---- Terms of ReferenceTerms of Reference

Page 5: National Positioning Navigation and Timing Architecture · National Positioning Navigation and Timing Architecture Civil GPS Service Interface Committee Meeting ... 15 September 2008

5

UNCLASSIFIED

Scope

Military

HomelandSecurity

Civil

Commercial

Space

Air

Surface

Sub-Surface

Location Based ServicesTrackingSurvey

ScientificRecreation

TransportationMachine Control

AgricultureWeapons

OrientationCommunications

and Timing

GNSS

GNSS Augmentation

TerrestrialNAVAIDS

Onboard / User Equip

Networks

Military

Civil

Commercial

International

USERS DOMAIN MISSIONS PROVIDERSSOURCES

Broad Scope Required Innovative Approaches and Focused Analysis Efforts

Page 6: National Positioning Navigation and Timing Architecture · National Positioning Navigation and Timing Architecture Civil GPS Service Interface Committee Meeting ... 15 September 2008

6

UNCLASSIFIED

Primary PNT Gaps

• Gaps primarily drawn from military’s PNT Joint Capabilities Document, with additions and modifications from parallel civil community documents and discussions– Operations in Physically Impeded Environments

– Operations in Electromagnetically Impeded Environments

– Higher accuracy with integrity

– Notification of Hazardously Misleading Info (Integrity)

– High Altitude/Space Position and Orientation

– Geospatial information - access to improved GIS data (regarding intended path of travel)

– Insufficient modeling capability

Page 7: National Positioning Navigation and Timing Architecture · National Positioning Navigation and Timing Architecture Civil GPS Service Interface Committee Meeting ... 15 September 2008

7

UNCLASSIFIED

Cumulative Process

Data GatheringData GatheringConcept DevelopmentConcept Development

Analysis & AssessmentAnalysis & Assessment

Needs & Gaps

Environment, Technology& Evolved Baseline

Community InvolvementCommunity InvolvementArchitecture Development Team,

Subject Matter Experts,Small Working Groups

& Industry

Trade Space, Features & Architectures

Analytical Framework

Page 8: National Positioning Navigation and Timing Architecture · National Positioning Navigation and Timing Architecture Civil GPS Service Interface Committee Meeting ... 15 September 2008

8

UNCLASSIFIED

VECTORInterchangeable Solutions

VVECTORECTORInterchangeable SolutionsInterchangeable Solutions

VISIONUS Leadership in Global PNT

VVISIONISIONUS Leadership in Global PNTUS Leadership in Global PNT

Guiding Principles

STRATEGYGreater Common Denominator

SSTRATEGYTRATEGYGreater Common DenominatorGreater Common Denominator

VECTORMultiple Phenomenologies

VVECTORECTORMultiple PhenomenologiesMultiple Phenomenologies

VVECTORECTORSynergy of PNT & CommunicationsSynergy of PNT & Communications

VVECTORECTORCooperative Organizational StructuresCooperative Organizational Structures

Page 9: National Positioning Navigation and Timing Architecture · National Positioning Navigation and Timing Architecture Civil GPS Service Interface Committee Meeting ... 15 September 2008

9

UNCLASSIFIED

US Leadership in Global PNTUS Leadership in Global PNTUS Leadership in Global PNT

Vision

• Based on a foundation of national policy

• Efficiently develop and field the best technologies and systems (e.g. cost, schedule, acceptable risks, user impact)

• Promulgate stable policies (commitment to funding, commitment toperformance, advanced notice of change, etc)

• Foster innovation through competition within the commercial sector

• Ensure robust and enduring inter-agency coordination and cooperation

• Maximize the practical use of military, civil, commercial and foreign systems and technologies

• Judiciously develop and apply standards and best practices

Page 10: National Positioning Navigation and Timing Architecture · National Positioning Navigation and Timing Architecture Civil GPS Service Interface Committee Meeting ... 15 September 2008

10

UNCLASSIFIED

Strategy

• Recommendations– Maintain GPS as a cornerstone of the National PNT Architecture

– Monitor PNT signals to verify service levels, observe environmental effects, detect anomalies, and identify signal interference for near real-time dissemination

– Transition or divest US GNSS augmentation assets that are unnecessarily redundant after capability is available from GPS modernization or other methods

– Continue to investigate methods to provide high-accuracy-with-integrity solutions for safety-of-life applications

– Develop a national approach to protect military PNT advantage

The US can Best Achieve Efficiency and Effectiveness through a Greater Common Denominator Approach

The US can Best Achieve Efficiency and Effectiveness The US can Best Achieve Efficiency and Effectiveness through a Greater Common Denominator Approachthrough a Greater Common Denominator Approach

Page 11: National Positioning Navigation and Timing Architecture · National Positioning Navigation and Timing Architecture Civil GPS Service Interface Committee Meeting ... 15 September 2008

11

UNCLASSIFIED

Vector: Multiple Phenomenologies

• Recommendations– Encourage appropriate development and employment of equipment that

integrates information from diverse sources and information paths

– Assess the potential for the use of foreign PNT systems for safety-of-life applications and critical infrastructure users and, as appropriate, develop clear standards and criteria for their use

– Continue military PNT exclusive use policy while studying development of capabilities to enable military use of other signals

– Promote standards for PNT pseudolites and beacons to facilitate interchangeability and avoid interference

– Study evolution of space-based and terrestrial PNT capabilities to support diversity in PNT sources and information paths

– Ensure critical infrastructure precise time and time interval users have access to and take advantage of multiple available sources

111 Use Multiple Phenomenologies to the Maximum Extent Practical to Ensure Robust Availability

Use Multiple Phenomenologies to the Use Multiple Phenomenologies to the Maximum Extent Practical to Ensure Robust AvailabilityMaximum Extent Practical to Ensure Robust Availability

Page 12: National Positioning Navigation and Timing Architecture · National Positioning Navigation and Timing Architecture Civil GPS Service Interface Committee Meeting ... 15 September 2008

12

UNCLASSIFIED

Vector: Interchangeable Solutions

• Recommendations– Use participation in international PNT-related activities to promote

the interchangeability of PNT sources while assuring compatibility

– Evolve standards, calibration techniques, and reference frames to support future accuracy and integrity needs

– Identify and develop common standards that meet users’ needs forPNT information exchange, assurance and protection

– Establish common standards that meet users’ needs for the depiction of position information for local and regional operations

222 Strive for Interchangeable Solutions to Enhance Efficiency and Exploit Source Diversity

Strive for Interchangeable Solutions to Strive for Interchangeable Solutions to Enhance Efficiency and Exploit Source DiversityEnhance Efficiency and Exploit Source Diversity

Page 13: National Positioning Navigation and Timing Architecture · National Positioning Navigation and Timing Architecture Civil GPS Service Interface Committee Meeting ... 15 September 2008

13

UNCLASSIFIED

Vector: Synergy of PNT & Communications

• Recommendation– Identify and evaluate methods, standards and potential capabilities

for fusion of PNT with communications

333 Pursue, where Appropriate, Fusion of PNT with New and Evolving Communications CapabilitiesPursue, where Appropriate, Fusion of PNT with Pursue, where Appropriate, Fusion of PNT with New and Evolving Communications CapabilitiesNew and Evolving Communications Capabilities

Page 14: National Positioning Navigation and Timing Architecture · National Positioning Navigation and Timing Architecture Civil GPS Service Interface Committee Meeting ... 15 September 2008

14

UNCLASSIFIED

Vector: Cooperative Organizational Structures

• Recommendations– Develop a national PNT coordination process

– Identify and leverage centers of excellence for PNT phenomenology and applications

– Define, develop, sustain, and manage a PNT modeling and simulation core analytical framework

444 Promote Interagency Coordination & Cooperation to Ensure the Necessary levels of Information Sharing

Promote Interagency Coordination & Cooperation to Promote Interagency Coordination & Cooperation to Ensure the Necessary levels of Information SharingEnsure the Necessary levels of Information Sharing

Page 15: National Positioning Navigation and Timing Architecture · National Positioning Navigation and Timing Architecture Civil GPS Service Interface Committee Meeting ... 15 September 2008

15

UNCLASSIFIED

Recommendation Tree

VisionVision

StrategyStrategy

VectorsVectors

Rec

omm

enda

tions

Rec

omm

enda

tions

Synergy of PNT & Synergy of PNT & CommunicationsCommunications

Cooperative Cooperative Organizational Organizational

StructuresStructures

GPS GPS –– An An Architecture Architecture CornerstoneCornerstone

Augmentation Augmentation Transition Transition

OpportunitiesOpportunities

PNT Signal PNT Signal Monitoring & Monitoring &

DisseminationDissemination

Multiple Multiple PhenomenologiesPhenomenologies

Interchangeable Interchangeable SolutionsSolutions

Standards & Standards & Reference Reference

FramesFrames

Grids & Grids & Coordinate Coordinate SystemsSystems

Info Exchange, Info Exchange, Assurance & Assurance &

ProtectionProtection

Interchangeability Interchangeability with Foreign PNT with Foreign PNT

SourcesSources

Integrated User Integrated User EquipmentEquipment

Civil Use of Civil Use of Foreign PNTForeign PNT

US Military Use of US Military Use of NonNon--Military Military

SignalsSignals

Evolution of PNT Evolution of PNT CapabilitiesCapabilities

Synergy of PNT & Synergy of PNT & CommunicationsCommunications

National PNT National PNT Coordination Coordination

ProcessProcess

Protect Strategic Protect Strategic AdvantageAdvantage

Critical Critical Infrastructure & Infrastructure &

TimeTime

High Accuracy High Accuracy with Integritywith Integrity

US Leadership in Global PNTUS Leadership in Global PNT

The US can Best Achieve Efficiency and Effectiveness through a The US can Best Achieve Efficiency and Effectiveness through a Greater Common Denominator ApproachGreater Common Denominator Approach

PNT Pseudolites PNT Pseudolites & Beacons& Beacons

Phenomenology & Phenomenology & Application Application ChampionsChampions

Modeling & Modeling & Simulation Simulation FrameworkFramework

1919

1818

17171616

1414

1313

1212

1515

88

77

66

99

1010

1111

33

22

11

44

55

332211 44

Page 16: National Positioning Navigation and Timing Architecture · National Positioning Navigation and Timing Architecture Civil GPS Service Interface Committee Meeting ... 15 September 2008

16

UNCLASSIFIED

ImplementationImplementation

ImplementationImplementation

CY2008Q1 Q2 Q3 Q4

IPR IPR AIM AIM

Transition PlanningTransition PlanningTransition PlanningAGM AGM

v1v1v1

v2v2v2

vNvvNN

OnOn--GoingGoingProcessProcess

Architecture Effort and Schedule

ArchitectureArchitectureDevelopmentDevelopment

TransitionTransitionPlanningPlanning

ArchitectureArchitectureDevelopmentDevelopment

TransitionTransitionPlanningPlanning

ArchitectureArchitectureDevelopmentDevelopment

TransitionTransitionPlanningPlanning

A Plan to Achieve the Should-Be Architecture

is Produced & Implementation Begins

Effort Re-Examines the PNT Environment and Crafts and

Implements the Next 20-Year Should-Be Architecture

The National PNT Architecture Effort Employs an Iterative, Interagency Process to Plan US Leadership in Global PNT

The National PNT Architecture Effort Employs an Iterative, Interagency Process to Plan US Leadership in Global PNT

Should-Be ArchitectureShouldShould--Be Be

ArchitectureArchitecture

Transition Plan provided to agenciesTransition Plan provided to agencies

v1v1v1

ShoulArchiteShouldShould

ArchiteArchitev2v2v2

Effort Repeats--the Next New Should-Be

Architecture is Developed, Planned, and Implemented

Page 17: National Positioning Navigation and Timing Architecture · National Positioning Navigation and Timing Architecture Civil GPS Service Interface Committee Meeting ... 15 September 2008

17

UNCLASSIFIED

Next Steps

• Workshop(s) to Obtain Public Feedback on Recommendations– First “Industry Day” session in conjunction with the 2008 Institute of Navigation

(ION) Global Navigation Satellite System (GNSS) conference.• Date: September 16• Time: 1PM – 4PM, starting with a presentation by NSSO • Location: Savannah International Trade and Convention Center, Rooms 105 & 106

• Influence update to PNT planning documents– Federal Radionavigation Plan– Five-Year National Space-Based PNT Plan

• Architecture Transition Plan– Event-based implementation timeline– Coordinate through Decision Coordination Group members and co-sponsors as

appropriate

Page 18: National Positioning Navigation and Timing Architecture · National Positioning Navigation and Timing Architecture Civil GPS Service Interface Committee Meeting ... 15 September 2008

18

UNCLASSIFIED

Points of Contact

• National Security Space Office– CAPT Milton Abner– [email protected]– Website: http://www.acq.osd.mil/nsso/pnt/pnt.htm

• OASD/NII– Mr. Ray Swider– [email protected]

• DOT RITA, Volpe Center– Ms. Karen Van Dyke– [email protected]