Page 1: Prof Andrew McNaughton HS2 Ltd Technical Director 1 Developing HS2

Prof Andrew McNaughtonHS2 Ltd Technical Director

1

Developing HS2

Page 2: Prof Andrew McNaughton HS2 Ltd Technical Director 1 Developing HS2

2

The story so far

• Jan 2009 - HS2 Ltd established• Mar 2010 – Command paper + HS2

report• May 2010 – General Election• Dec 2010 – Consultation to commence• Feb 2011 to Jul 2011 – Consultation on

HSR and LWM route• Jan 2012 – Decision to proceed…

Page 3: Prof Andrew McNaughton HS2 Ltd Technical Director 1 Developing HS2

3

We have upgraded classic rail

• Dominant mode for travel to Central London

• Growing fast

• Market share between other cities very low

• At maximum capacity by 2025

• Further upgrading extremely disruptive

Page 4: Prof Andrew McNaughton HS2 Ltd Technical Director 1 Developing HS2

4

Benefits - Capacity and connectivity

• Total cost for Y network (inc Phase 1) is £32.7bn*• Compared to building a traditional line, HS2 will

deliver £4 in benefits for every additional £1 spent

• Wider benefits for jobs and regeneration• Moving intercity services onto HS2 means more

space for commuter, regional and freight services on existing lines

Y network will see up to 4.5 million air trips and 9 million road trips move to rail

Additional railfreight capacity could take 200 trucks per hour off roads, saving 500,000 tonnes of CO2 pa

• Transforms journey time between principal cities* 2011 prices

Page 5: Prof Andrew McNaughton HS2 Ltd Technical Director 1 Developing HS2

5

Government gives go ahead

• 10 Jan Secretary of State green light: Y network: London to West

Midlands with extensions to Manchester and Leeds and spur to Heathrow

London to West Midlands Alignment Changes to consultation

route including changes following 2011 consultation

Page 6: Prof Andrew McNaughton HS2 Ltd Technical Director 1 Developing HS2

6

HS2 Ltd mobilises

• Move from advisory role to developing phase 1 and promoting HS2

• Grow and strengthen organisation with new expertise CH2M Hill as development project management partner Framework of professional services consultants

Page 7: Prof Andrew McNaughton HS2 Ltd Technical Director 1 Developing HS2

7

Hybrid bill

• The act will give powers to: Build and operate HS2 Acquire and lease land Alter roads Modify statutory

undertaker’s equipment• Deposit hybrid bill by end of

2013• Royal assent 2015

Page 8: Prof Andrew McNaughton HS2 Ltd Technical Director 1 Developing HS2

8

Working towards hybrid bill for phase 1

• Design of line and stations Detailed measures e.g. earth building, landscaping Construction methods and sites Outline design of stations, viaducts and bridges etc

• Land referencing• Managing petitioners

Page 9: Prof Andrew McNaughton HS2 Ltd Technical Director 1 Developing HS2

9

Working towards hybrid bill for phase 1

• Environmental impact assessment and preparation of environmental statement, for example: Ecological, geological and archaeological surveys Noise assessment Impact on water courses, flood risk etc

• Scale of work 17 work packages covering design, environment and land At times up to 1000 people working on programme

Page 10: Prof Andrew McNaughton HS2 Ltd Technical Director 1 Developing HS2

10

Mitigating effects on people and nature

Page 11: Prof Andrew McNaughton HS2 Ltd Technical Director 1 Developing HS2

11

“A thing of beauty”

Page 12: Prof Andrew McNaughton HS2 Ltd Technical Director 1 Developing HS2

12

Noise mitigation: Landscape and barriers

Images: Arup (HS1)

Page 13: Prof Andrew McNaughton HS2 Ltd Technical Director 1 Developing HS2

13

Tunnel noise and vibration control

Resilient Material

Page 14: Prof Andrew McNaughton HS2 Ltd Technical Director 1 Developing HS2

14

Consultations

• Scoping of the environmental impact assessment spring 2012

• Blight consultation 2012

• Safeguarding consultation 2012

• Environmental statement consultation spring 2013

Page 15: Prof Andrew McNaughton HS2 Ltd Technical Director 1 Developing HS2

15

Leeds Manchester and Heathrow

• Options report went to Secretary of State March 2012

• Informal consultation 2012

• Government decision on proposed route and station options autumn 2012

• Formal consultation 2013?

Page 16: Prof Andrew McNaughton HS2 Ltd Technical Director 1 Developing HS2

16

Initial network• London to

West Midlands 1-24 to 0-49

Manchester 2-08 to 1-13 Leeds 2-15 to 1-20 Scotland 4-20 to 3-30

• Birmingham to Manchester 1-34 to 0-40 Leeds 2-05 to 1-00

• Heathrow to Manchester 1-10 Paris 2-40

London

Manchester

Birmingham

Scotland

Leeds

Heathrow

Newcastle

Page 17: Prof Andrew McNaughton HS2 Ltd Technical Director 1 Developing HS2

17

1st Stage• London to

West Midlands 1-24 to 0-49

Manchester 2-08 to 1-40 Glasgow 4-20

to 4-00

• Birmingham to

Paris 4-30 to 3-00London

Manchester

Birmingham

Glasgow

Page 18: Prof Andrew McNaughton HS2 Ltd Technical Director 1 Developing HS2

18

Through running – “Eurostar Mark 2”

Page 19: Prof Andrew McNaughton HS2 Ltd Technical Director 1 Developing HS2

19

High speed specification

• No premium on fares

• Journey times based on 360kph (225mph) trains

• Up to 18 trains per hour

• Fully EU TSI Compliant

• Up to 1100 seats per train

Page 20: Prof Andrew McNaughton HS2 Ltd Technical Director 1 Developing HS2

20

London - 2 central stations

Euston

Old Oak Common

Page 21: Prof Andrew McNaughton HS2 Ltd Technical Director 1 Developing HS2

21

HS stations are large!

1070m

Page 22: Prof Andrew McNaughton HS2 Ltd Technical Director 1 Developing HS2

22

London Euston

Page 23: Prof Andrew McNaughton HS2 Ltd Technical Director 1 Developing HS2

23

Old Oak Common Interchange

Page 24: Prof Andrew McNaughton HS2 Ltd Technical Director 1 Developing HS2

24

Old Oak Common

Page 25: Prof Andrew McNaughton HS2 Ltd Technical Director 1 Developing HS2

25

New Central Birmingham Station

Page 26: Prof Andrew McNaughton HS2 Ltd Technical Director 1 Developing HS2

26

West Midlands Interchange

Links to National Exhibition Centre and the Airport

‘Parkway’ feeder for the metropolitan area

People mover connection to be provided

Road connections to trunk network

Page 27: Prof Andrew McNaughton HS2 Ltd Technical Director 1 Developing HS2

27

HS2 timescales• 2011 Public

Consultation

• 2012 Decision to Develop

• 2013 Start Act of Parliament

• 2017 Start Physical Work

• 2026 Open to

Birmingham

• 2033 The “Y” Complete