Custom Pump Skids Custom Pump Skids Ross Systems & Controls APPLICATION Potable Water System INDUSTRY Hospital / Commercial Building KEY NOTES Retrofit for Increased Capacity Custom Controls Custom Design Full Factory Test Three Hour Installation & Startup Triplex / Alternating System Disassembled to fit through as standard doorway Ross Systems & Controls was approached with a problem… we see them as opportunities. A large hospital was getting larger. First, demand was growing, but their existing potable water system was at maximum capacity. Second, the new im- proved skid had to fit in the same foot-print as the existing skid. It also had to be disassembled to fit through a standard 32” wide door. Finally, the existing skid had to be demolished and the new skid had to be reassembled, plumbed, & wired all between 11 pm and 3 am. No room for mistakes. Emergency Rooms and Intensive Care Units cannot survive without water pressure. Over and above the installation issues, the system had to be energy efficient, han- dle the growing capacity at 50% and automatically, with the ability for future expan- sion. Ross Systems & Controls was the only company able to meet the full de- mands of the project specifications. Not to mention, we had the most competitive price too. Call us with your demanding applications. Triplex / Alternating Ross Systems & Controls •34 Westgate Blvd • Savannah, Georgia 31405 Phone: 912.238.5800 • Fax: 912.238.1905 • Toll Free 866.SysCon.0 (866.797.2660) • [email protected] Superior SysCon Superior SysCon Superior SysCon Systems Systems Systems SysCon Services Project / System Conception Design and Engineering PLC & HMI Programming Recipe Based Controls Data Acquisition Systems Panel Construction Automated Machine & Process Construction On Site Installation, Start-up & Technical Assistance Pump / Chemical Feed Skids Dilution Skids Potable Water Pump Skids Powder / Liquid Mixing Systems Heat Trace Systems Fiber Optic / Ethernet Communications Networks And more…...

Ross Systems & Controls Custom Pump Skids - Custom Pump Skids.pdf · Ross Systems & Controls PumpSkid 022002 Location: Non-Hazardous / Utility-Boiler Room Design: Custom, Retrofit

  • Upload
    lamngoc

  • View
    220

  • Download
    1

Embed Size (px)

Citation preview

Page 1: Ross Systems & Controls Custom Pump Skids - Custom Pump Skids.pdf · Ross Systems & Controls PumpSkid 022002 Location: Non-Hazardous / Utility-Boiler Room Design: Custom, Retrofit

Custom Pump SkidsCustom Pump Skids Ross Systems & Controls

APPLICATION Potable Water System

INDUSTRY Hospital / Commercial Building

KEY NOTES Retrofit for Increased Capacity

Custom Controls Custom Design

Full Factory Test Three Hour Installation & Startup

Triplex / Alternating System Disassembled to fit through as

standard doorway

Ross Systems & Controls was approached with a problem… we see them as

opportunities. A large hospital was getting larger. First, demand was growing, but

their existing potable water system was at maximum capacity. Second, the new im-

proved skid had to fit in the same foot-print as the existing skid. It also had to be

disassembled to fit through a standard 32” wide door. Finally, the existing skid had

to be demolished and the new skid had to be reassembled, plumbed, & wired all

between 11 pm and 3 am. No room for mistakes. Emergency Rooms and Intensive

Care Units cannot survive without water pressure.

Over and above the installation issues, the system had to be energy efficient, han-

dle the growing capacity at 50% and automatically, with the ability for future expan-

sion. Ross Systems & Controls was the only company able to meet the full de-

mands of the project specifications. Not to mention, we had the most competitive

price too.

Call us with your demanding applications.

Triplex / Alternating

Ross Systems & Controls •34 Westgate Blvd • Savannah, Georgia 31405 Phone: 912.238.5800 • Fax: 912.238.1905 • Toll Free 866.SysCon.0 (866.797.2660) • [email protected]

Superior SysConSuperior SysConSuperior SysCon SystemsSystemsSystems

SysCon Services

Project / System Conception

Design and Engineering

PLC & HMI Programming

Recipe Based Controls

Data Acquisition Systems

Panel Construction

Automated Machine & Process Construction

On Site Installation, Start-up &

Technical Assistance

Pump / Chemical Feed Skids

Dilution Skids

Potable Water Pump Skids

Powder / Liquid Mixing Systems

Heat Trace Systems

Fiber Optic / Ethernet Communications Networks

And more…...

Page 2: Ross Systems & Controls Custom Pump Skids - Custom Pump Skids.pdf · Ross Systems & Controls PumpSkid 022002 Location: Non-Hazardous / Utility-Boiler Room Design: Custom, Retrofit

Ross Systems & Controls

PumpSkid 022002

Location: Non-Hazardous / Utility-Boiler Room

Design: Custom, Retrofit to replace existing smaller skid

Pumps: (3) 20 HP Direct Drive Centrifugal Pumps

Flow: 390 GPM @ 143 TDH per pump

Controls:

• Variable speed on each pump

• Full Bypass for each pump

• Color Graphical Touch Screen

• Pressure Control +/- 2 psi

• Speed vs. Pressure control

• Automatic Triplex / Alternating

76.00

73.00

CARVER CENTRIFUGAL PUMPMODEL: 4x3x7LA CAST IRONCONSTRUCTION FITTED W/ ASINGLE MECHANICAL SEAL, 6.50"DIA. IMPELLER

20 HP 3450 RPM230-460/3/60FRAME GENERALELECTRIC MOTOR

13/16"D. TIE DOWN(8 PLACES)

3" BUTTERFLY VALVE(DISCHARGE)

4" BUTTERFLYVALVE (SUCTION)

6" 125lb. F.F.FLANGED OUTLETSLIP-ON CONNNECTION

4.50

PIPES & WALLAISLE WAYAISLE WAY

SHUTOPEN OPEN SHUTSHUTOPEN48.00

CONCRETE PAD

24.3324.3324.33

52.92 16.00

56.00 12.00

PIPES & WALL

6" 125lb. F.F.FLANGED INLETSLIP-ON CONNNECTION 8.00

44

1/2" NPTBLACK IRON

UNION

1/2" NPTBLACK IRON

UNION

CONCRETE PAD

OPERATORINTERFACE

SCREEN

PLC/VFDCONTROLPANEL

73.50 FRONT VIEWTOP VIEWSIDE VIEWCustom Pump Skid—Triplex / Alternating

Ross Systems & Controls •34 Westgate Blvd • Savannah, Georgia 31405 Phone: 912.238.5800 • Fax: 912.238.1905 • Toll Free 866.SysCon.0 (866.797.2660) • [email protected]