05.09.2011 1 TUNNEL BORING MACHINES: TYPES AND CRITERIA FOR TBM SELECTION MASTERE SPECIALISE TUNNELS et OUVRAGES SOUTERRAINS De la conception à l’exploitation FOR TBM SELECTION. Dr. Karin Bäppler Herrenknecht AG, Germany TUNNEL BORING MACHINES: TYPES AND CRITERIA FOR TBM SELECTION. Selection of Tunnelling Machine Systems Classification scheme for tunnelling machines Geological consideration for TBM selection Overview machine types Case studies Geology Groundwater pressure Groundwater pressure Complex, changing geological conditions Diameter Three and four-lane road tunnels Multi-purpose tunnels Perspectives Support pressure development Innovative directions INSA Lyon ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 20112012 SELECTION OF TUNNELLING MACHINE SYSTEMS. RECOMMENDED STEPS IN THE DECISION MAKING PROCESS. Step 1 Step 2 Step 3 Analysis of geotechnical reports and ground profiles (Basis:DIN4020) Result: Preliminary choice of types of Tunnelling Machine Analysis of system behavior (boreability, face stability, wear prognosis..) Result: Basic requirements for excavation, face support, support medium. Localization of preliminary choice of TBM types Classification of tunnel regarding feasible machine types Result: Qualitative prognosis of suitable machine types along tunnel alignment INSA Lyon ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 20112012 Step 4 Step 5 Step 6 Step 7 Analysis of muck behavior (stickiness, wear) Result: Requirements for the muck transport system. Localization of preliminary TBM choice Analysis of muck behavior in followup systems (suitability as construction material or for landfill depositing) Result: Requirements for further muck handling. Localization of preliminary choice Definition of Excavation Classes: Final choice of TBM type Division of tunnel in sections of similar behavior Result: Tunnel profile with partitions, quantitative prognosis of excav. Classes, operational definitions, summary of characteristic ground parameters Recommended steps by : DAUB Geology or hydrogeology affect the way and extent of dewatering works water permeability soil conditioning tunnel face support support medium, increase of thrust forces handling of boulders overburden, settlement & heave tunnel alignment, gradient GEOTECHNICS. INFLUENCE OF GEOLOGY AND HYDROGEOLOGY. INSA Lyon ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 20112012 Selection of machine and operation principle Success of project soil bearing capacity, soil stabilization soil disposal Geological longitudinal profile with vertical alignment of the tunnel, groundwater table and possibly borehole locations Horizontal alignment of the tunnel with borehole locations Grain size distribution curve Wet density γ, Angle of internal friction ϕ, Cohesion c, undrained cohesion c u , permeability k Groundwater conditions Atterberg Limits: plastic limit liquid limit natural water content (consistency and SELECTION OF TBM TYPE TO BE USED FOR SOFT/ HARD ROCK. RELEVANT PARAMETERS FOR THE EVALUATION OF MACHINE TYPE. Atterberg Limits: plastic limit, liquid limit, natural water content (consistency and plasticity indexes) Modulus of elasticity E c , Earth pressure coefficient K 0 Possible existence of boulders: rock type, expected amount, expected sizes, UCS, quartz content, CAI Unconfined Compressive Strength (UCS) Tensile Strength Cerchar Index (CAI, wear behaviour) Max. Expected water inflows/ groundwater pressure INSA Lyon ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 20112012 torque calculation GEOTECHNICS GEOLOGY + HYDROGEOLOGY INSA Lyon ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 20112012 wear prognosis Documents pédagogiques internes au Mastère TOS

SHORT COURSE KB Master Course Lyon November 2011 … 2011-2012... · 2012-01-16 · Dr. Karin Bäppler Herrenknecht AG, Germany TUNNEL BORING MACHINES: TYPES AND CRITERIA FOR TBM

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

05.09.2011

1

TUNNEL BORING MACHINES: TYPES AND CRITERIA FOR TBM SELECTION

MASTERE    SPECIALISE

TUNNELS et OUVRAGES SOUTERRAINSDe la conception à l’exploitation

FOR TBM SELECTION.

Dr. Karin Bäppler

Herrenknecht AG, Germany

TUNNEL BORING MACHINES: TYPES AND CRITERIA FOR TBM SELECTION.

Selection of Tunnelling Machine SystemsClassification scheme for tunnelling machines Geological consideration for TBM selectionOverview machine typesCase studies

GeologyGroundwater pressureGroundwater pressureComplex, changing geological conditions

DiameterThree and four-lane road tunnelsMulti-purpose tunnels

PerspectivesSupport pressure developmentInnovative directions

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

SELECTION OF TUNNELLING MACHINE SYSTEMS. RECOMMENDED STEPS IN THE DECISION MAKING PROCESS.

Step 1

Step 2

Step 3

Analysis of geotechnical reports and ground profiles (Basis:DIN4020)

Result: Preliminary choice of types of Tunnelling Machine

Analysis of system behavior (boreability, face stability, wear prognosis..)

Result: Basic requirements for excavation, face support, support medium. Localization of preliminary choice of TBM types

Classification of tunnel regarding feasible machine types

Result: Qualitative prognosis of suitable machine types along tunnel alignment

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Step 4

Step 5

Step 6

Step 7

Analysis of muck behavior (stickiness, wear)

Result: Requirements for the muck transport system. Localization of preliminary TBM choice

Analysis of muck behavior in follow‐up systems (suitability as construction material or for landfill depositing)

Result: Requirements for further muck handling. Localization of preliminary choice

Definition of Excavation Classes: Final choice of TBM type

Division of tunnel in sections of similar behavior

Result: Tunnel profile with partitions, quantitative prognosis of excav. Classes, operational definitions, summary of characteristic ground parameters

Recommended steps by: DAUB

Geology or hydrogeology

affect the way and extent of

de‐watering workswater permeabilitysoil conditioningtunnel face supportsupport medium, increase of thrust forceshandling of bouldersoverburden, settlement & heave tunnel alignment, gradient

GEOTECHNICS. INFLUENCE OF GEOLOGY AND HYDROGEOLOGY.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Selection of machine and operation principle 

Success of project

soil bearing capacity, soil stabilizationsoil disposal

Geological longitudinal profile with vertical alignment of the tunnel, groundwater table and possibly borehole locations

Horizontal alignment of the tunnel with borehole locations

Grain size distribution curve

Wet density γ, Angle of internal friction ϕ, Cohesion c, undrained cohesion cu, permeability k

Groundwater conditions

Atterberg Limits: plastic limit liquid limit natural water content (consistency and

SELECTION OF TBM TYPE TO BE USED FOR SOFT/ HARD ROCK. RELEVANT PARAMETERS FOR THE EVALUATION OF MACHINE TYPE.

Atterberg Limits: plastic limit, liquid limit, natural water content (consistency and plasticity indexes)

Modulus of elasticity Ec, Earth pressure coefficient K0

Possible existence of boulders: rock type, expected amount, expected sizes, UCS, quartz content, CAI

Unconfined Compressive Strength (UCS)

Tensile Strength

Cerchar Index (CAI, wear behaviour)

Max. Expected water inflows/ groundwater pressure

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

torque calculation

GEOTECHNICS

GEOLOGY + HYDROGEOLOGY

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

wear prognosis

Doc

umen

ts p

édag

ogiq

ues

inte

rnes

au

Mas

tère

TO

S

05.09.2011

2

CONCEPTIONAL OVERVIEW OF THE THREE MAIN PARAMETERS 

INFLUENCING EXCAVATABILITY.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

TUNNELING MACHINES. CLASSIFICATION SCHEME ACCORDING TO DAUB FOR ALL TYPES OF TUNNELLING MACHINES.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

OVERVIEW MACHINE TYPES.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Soft ground TBMs

TRAFFIC  TUNNELLING.ALL TECHNOLOGIES ABOVE 6 m.

Soft ground TBMs

EPB-Shield (Earth Pressure Balanced Shield)

Mixshield.

Hard Rock TBMs

Shielded Hard Rock TBM (Single Shield, Double Shield)

Hard Rock Gripper TBM

Dual Mode TBMs

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Single Shield TBM

Open Mode

Conversion

MOVING TOWARDS MULTIMODE.THREE BASIC SHIELDED TBM SYSTEMS. 

Closed Mode

Slurry Shield EPB Shield 

• integrated• modular

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

MODE

MIXSHIELD.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Slurry Compressed Air EPB Hard Rock

Doc

umen

ts p

édag

ogiq

ues

inte

rnes

au

Mas

tère

TO

S

05.09.2011

3

WE OFFER THE COMPLETE RANGE IN MECHANIZED TUNNELLING.

For all Demands and every Geology.

For all Media and Traffic Systems.

All Sizes and Technologies.

All Services as a Full Service Provider.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

TUNNELLING WITHOUT TUNNEL SUPPORT.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Tunnel lining

Cast-in-place PrecastImmediate ground

support

TUNNEL LINING.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Shotcrete Bolting Concrete Concrete segments

Steel segments

Block segment

Trapezoidal segment

....

Shotcrete

In-situ

Shotcrete robot

TUNNELLING WITH FINAL TUNNEL SUPPORT.

concrete

Segments

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

A precast concrete lining for a TBM-driven tunnel generally comprises asequence of rings placed side-by-side.One ring is divided into sectors socalled segments.

Tail Skin

Tail Skin sealing

Grouted Material

SHIELDED TBMs.GENERAL ASPECTS OF SEGMENTAL CONCRETE TUNNEL LINING.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

TBM Advance

INSTALLATION OF SEGMENTS BY THE SEGMENT ERECTOR.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Doc

umen

ts p

édag

ogiq

ues

inte

rnes

au

Mas

tère

TO

S

05.09.2011

4

Suction plate (vacuum).Segment grab (mechanical).

SEGMENT ERECTOR FOR RING BUILDING.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Mechanical erector:

SEGMENT ERECTOR. RING BUILDING.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Vacuum erector:

BACKFILLING OF THE ANNULAR GAP.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Are determined by:

The thickness of the shield shell.

The height of the shield tail seal.

The support construction of the shield tail seal.

DIMENSIONS OF ANNULAR GAP.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

The conical form of the shield.

The ground displacement in curves.

The overcut.

Filing of the annular gap between the outer lining surface and the tunnel wall serves the following functions:

In the long term:

Ensures the most uniform bedding

In the short term:

Ensures effective bedding of the

PURPOSE OF ANNULAR GAP‐BACKFILLING.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

gbetween the lining and the ground.

In certain special cases it provides an additional seal.

glining against the enclosing ground.

Minimizes surrounding ground deformations which can cause settlements both above and below ground.

Back-filling material must be:

Sufficiently fluid to facilitate its placement and to fill completely the annular gap.

S ffi i tl fi t id l k th h th hi ld t il l d t

REQUIREMENTS OF AN EFFECTIVE BACKFILLING MATERIAL.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Sufficiently firm to avoid leakage through the shield tail seals and segment water proofing gaskets.

Sufficiently firm to avoid seepage flows along the shield tail towards the front of the TBM.

Doc

umen

ts p

édag

ogiq

ues

inte

rnes

au

Mas

tère

TO

S

05.09.2011

5

Through the lining by means of 

holes incorporated in the 

segment structure.

CONVENTIONAL BACKFILLING METHODS.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Grouting at the rear end of the 

shield tail through integrated 

grout pipes arranged 

longitudinally within the tail.

annular gap

Shield tail

soil

GROUTING OF THE ANNULAR GAP THROUGH THE TAILSKIN IS TODAY’S STATE OF THE ART.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

segment ring

BACK FILLING. GROUTING THROUGH THE TAILSKIN.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

BACK FILLING. GROUTING THROUGH THE TAILSKIN.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

MATERIALS FOR ANNULAR GAP‐BACKFILLING AND PHYSICAL PROPERTIES OF GROUTS IN TERMS OF HARDENING TIME.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Cohesive soil conditions (high fines content and sticky soil)

Blocks and boulders, layers of hard rock, obstacles

Mixed face conditions

Abrasive ground

Very coarse soil conditions

MACHINE  DESIGN.SPECIAL ATTENTION  IN  RESPECT  OF GROUND CONDITIONS .

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

High groundwater pressure

Low overburden

Underpassing of waterways, existing buildings and structures

Presence of gas

Karst formations

Swelling

Squeezing

Doc

umen

ts p

édag

ogiq

ues

inte

rnes

au

Mas

tère

TO

S

05.09.2011

6

100

90

80

70

Sieve Size

FineClaySilt Sand Gravel

Medium MediumCoarse Fine Coarse Fine Medium Coarse

SOFT GROUND TBMs. APPLICATION RANGE OF EPB AND MIXSHIELDS.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

EPB Methods Mixshield Methods 

60,020.06,02,00,60,20,060,020,0060,0020,001

40

30

20

10

0

60

50

Grain diameter d (mm)

GRAVELSANDSILTCLAY

coarsemediumfinecoarsemediumfinecoarsemediumfine

ng[%

]

60

70

80

90

100

GRAVELSANDSILTCLAY

coarsemediumfinecoarsemediumfinecoarsemediumfine

GRAVELSANDSILTCLAY

coarsemediumfinecoarsemediumfinecoarsemediumfine

ng[%

]

60

70

80

90

100

Fluid-Supported

+ se

para

tion

+ se

para

tion

susp

ensio

n+fill

ers

susp

ensio

n+fill

ers

es, h

igh se

para

tion

effo

rt

es, h

igh se

para

tion

effo

rt

APPLICATION RANGE: FLUID‐SUPPORTED SHIELD.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Perc

entP

assi

n

Particle Size [mm]

0

10

20

30

60 10020620,60,20,060,020,0060,002

40

50

60

Perc

entP

assi

n

Particle Size [mm]

0

10

20

30

60 10020620,60,20,060,020,0060,002

40

50

60

ASt

anda

rd a

pplic

ation

+

ASt

anda

rd a

pplic

ation

+

CFa

ce su

ppor

t diffi

cult:

s

CFa

ce su

ppor

t diffi

cult:

s

BAn

ti-clo

gging

-mea

sure

s

BAn

ti-clo

gging

-mea

sure

s1. Submerged wall

2. Working chamber

3. Air cushion

4. Pressure bulkhead1

3

MIXSHIELD. GENERAL LAYOUT.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

2

4

MIXSHIELDS.SUPPORT PRESSURE REGULATION.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

ACCURATE FACE PRESSURE CONTROL VIA AIR BUBBLE PRINCIPLE. 

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

slurry soil

Membrane model Penetration model

slurry soilΔP

THE 2 MODELS FOR TRANSMITTING THE CONFINEMENT PRESSURE TO THE TUNNEL FACE (SLURRY SHIELDS).

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Filter cake formed Pure penetration

Doc

umen

ts p

édag

ogiq

ues

inte

rnes

au

Mas

tère

TO

S

05.09.2011

7

Thickness of filter cake:

4% loose bedding, low compactness

MIXSHIELD. CREATION OF A FILTER CAKE. 

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

p

5% medium dense bedding

6% loose bedding, high compactness

Support of the tunnel face by developing a filter cake for the

FUNCTION OF BENTONITE SUSPENSION IN MIXSHIELD TECHNOLOGY. 

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Support of the tunnel face by developing a filter cake for the transfer of the hydrostatic pressure. The air-pressure-stable filter cake enables the inspection of the tunnel face or maintenance works in the excavation chamber.

Transportation of the excavated material through powerful pumps in a slurry circuit to the separation plant on surface.

Keeping the dissolved soil in suspension, even during standstill of the shield.

FLUID‐SUPPORTED SHIELD (HYDRO SHIELD, SLURRY SHIELD).

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

SLURRY CIRCUIT. 

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

SLURRY CIRCUIT – FEED LINE.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

SLURRY CIRCUIT – DISCHARGE LINE.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Doc

umen

ts p

édag

ogiq

ues

inte

rnes

au

Mas

tère

TO

S

05.09.2011

8

CLASSIFICATION OF THE DIFFERENT TYPES OF MATERIAL TRANSPORT.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

V VV

homogeneous transport pseudo‐homogeneous 

transportheterogeneous transport

XPreliminary sieve

Sticky soil

SiltFine sandMedium grained

sand

Coarse sand

Gravel

X X

SEPARATION TECHNOLOGY. SEPARATION STEPS.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Centrifuge/filtration

2. Hydrocyclone-StageDewatering sieve

1. Hydrocyclone-StageDewatering sieve

X X

X X X

X X

TBM diameterAverage and maximum TBM advance speedTotal quantity m³/hGrain size distribution curve up to 2µm

REQUIRED INFORMATION FOR THE DESIGN OF A SEPARATION PLANT.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

to 2µmMaximum grain sizeInformation about the geologyPossibilities for disposal of excavated materialRequirement of customer (e.g. space requirement, sound proofing,…).

1 101,201,301,401,50

x I C

[-]

ry s

tiff

hard

tunnel face clay clogging at cuttingtools

cutte

rhea

drim

tunnel face clay clogging at cuttingtools

cutte

rhea

drim

Improved slurry circuit and flushing

COHESIVE SOIL CONDITIONS (HIGH FINES CONTENT, STICKY SOIL).IDENTIFICATION OF CLOGGING POTENTIAL.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

0,300,400,500,600,700,800,901,001,10

0 10 20 30 40 50 60 70Plasticity Index IP [%]

Con

sist

ency

Inde

x

Low potential for clogging

Medium potential for clogging

High potential forclogging

med

ium

stiff

veso

ft

cutterhead arm

c

cutterhead arm

c

Figure by: M. Thewes

Center cutter

Flow optimization

High flushing pressure

Bypass flushing

Distribution of flushing nozzles in the working chamber

Geometric design of cutting wheel spokes

COHESIVE SOIL CONDITIONS (HIGH FINES CONTENT, STICKY SOIL).COUNTER‐MEASURES.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Geometric design of cutting wheel spokes

Geometric design of the working chamber (material flow)

Chemical additives

Agitators

Roller crushers

In case of EPB Shields eventual clogging is countered by the

conditioning with foam and/or bentonite

150150

200200

250250

158%158%

ACTIVE CENTRE CUTTER. TORQUE REDUCTION OF THE CUTTERHEAD.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

00

5050

100100Without Centre CutterWithout Centre Cutter

With Centre CutterWith Centre Cutter

100%100%

Torque of the cutterhead (mto)Torque of the cutterhead (mto)

Doc

umen

ts p

édag

ogiq

ues

inte

rnes

au

Mas

tère

TO

S

05.09.2011

9

MIXSHIELD. STONE CRUSHER TO HANDLE BLOCKS, BOULDERS OR BIG CLAY LUMPS.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Conveyor belt scale

Laser scanning

Flow meter

Density sensors

MUCK FLOW/ BULK CONTROL. COMPARING THEORETICAL AND ACTUALLY EXCAVATED AMOUNTS OF SOIL.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

MASTERING NATURAL AND ARTIFICIAL OBSTACLES.SYSTEM FOR SEISMIC PROBING AHEAD.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Detection of anomalies in coarse ground conditions with low fines.

Geology

Groundwater pressure

Complex, changing geological conditions

Di t

CASE STUDIES.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Diameter

Three and four-lane road tunnels

Multi-purpose tunnels

Support pressure development

S-246 | Hallandsas | Sweden

Convertible Mixshield (Hard

Rock – Slurry)

Diameter: 10,530mm

CHALLENGES IN MECHANIZED TUNNELLING.

GROUNDWATER PRESSURE.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

,

Tunnel length: 2 x 5,500m

Cutterhead power: 4,000kW

Geology: Gneiss,

Amphibolite, Diabase Dykes

Customer: Skanska/Vinci JV

Excavation of hard and abrasive rock mass

Zones of soft soil and mixed face conditions

Potential of high water inflow along the total length of the

THE HALLANDSAS RIDGE.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

along the total length of the tunnel

Static water pressure above 10 bar along the majority of the alignment

Strict environmental (legal) restrictions on water inflow volume

Doc

umen

ts p

édag

ogiq

ues

inte

rnes

au

Mas

tère

TO

S

05.09.2011

10

Open mode with dry primary muck discharge system (TBM conveyor)

Open mode with (cyclic) pre-excavation grouting

THE SOLUTION.   

FULL HYBRID TBM FOR DUAL‐MODE OPERATION.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

g g

Open mode with (cyclic) pre-excavation grouting in closed static conditions

Closed mode with hydraulic (slurry) muck discharge system

Test No. 1 Samson unit main drive Hallandsas 14.02.2005

2,00 Bar

4,00 Bar

6,00 Bar

8,00 Bar

10,00 Bar

12,00 Bar

14,00 Bar

16,00 Bar

10:3

7:32

10:3

9:33

10:4

1:34

10:4

3:35

10:4

5:36

10:4

7:37

10:4

9:38

10:5

1:39

10:5

3:40

10:5

5:41

10:5

7:43

10:5

9:44

11:0

1:46

11:0

3:47

11:0

5:48

11:0

7:50

11:0

9:51

11:1

1:52

11:1

3:53

11:1

5:54

11:1

7:55

11:1

9:56

11:2

1:57

11:2

3:58

11:2

5:59

11:2

8:00

11:3

0:01

11:3

2:03

11:3

4:04

11:3

6:05

11:3

8:06

11:4

0:07

11:4

2:08

11:4

4:09

11:4

6:10

11:4

8:11

11:5

0:12

time

pres

sure

(Bar

)

front pressure oil chamber leak chamber gear housing

For up to 13 bar

Original size dynamic shop test up to 15 bar pressure was performed

CUTTERHEAD DRIVE SEAL SYSTEM.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Mid-tunnel breakthrough in the Mölleback Zone at June 8, 2010.

TUNNELLING AT HALLANDSAS: PUSHING THE LIMITS.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Breakthrough 1st tube: August 25, 2010.

TUNNELLING AT HALLANDSAS: PUSHING THE LIMITS.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

CHALLENGES IN MECHANIZED TUNNELLING. 

LAKE MEAD | INTAKE NO. 3 | LAS VEGAS.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Sedimentary and volcanic geology

Depth of the tunnel

Potential for high groundwater inflows and high hydrostatic pressures.

CHALLENGES IN MECHANIZED TUNNELLING.

GROUNDWATER PRESSURE.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Doc

umen

ts p

édag

ogiq

ues

inte

rnes

au

Mas

tère

TO

S

05.09.2011

11

LAKE MEAD | INTAKE NO. 3 | LAS VEGAS.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

S-502 Lake Mead, Intake No. 3 | Las Vegas | USA

Dual-Mode TBM - Hard Rock /MixshieldDiameter: 7,180mmTunnel length: 4,800m

Cutterhead power: 2,800kWGeology: Basalt, sandstone, amphibolite, conglomerate Customer: JV VTC (Impregilo S.p.A, S.A. Healy Company)

TBM able to convert rapidly from an open-faced system to a closed pressurized system capable of withstanding potential hydrostatic pressures up to 17 bar maximum.

LAKE MEAD | INTAKE NO. 3. PROFILE OF INTAKE SYSTEM.

CHALLENGE: WATER PRESSURE.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Closed modeOpen mode

Possible drill pattern ahead of the

TBM

Three permanently installed drill rigs

P bi d d illi h d f h

LAKE MEAD | INTAKE NO. 3. PROFILE OF INTAKE SYSTEM.

PROBING AND PRE EXCAVATION GROUTING.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Probing and drilling ahead of the face can be accomplished in open mode and closed mode conditions (blow-out preventer units)

CHALLENGE: COMPLEX GEOLOGY.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Finnetunnel, Germany

Railway tunnel

2 Convertible Mixshield TBMs

closed mode

FINNETUNNEL | GERMANY.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

open mode

Hydro‐Mode Conversion Open‐ModeTBM‐North

Conversion

PROJECT OVERVIEW FINNETUNNEL.SEQUENCES OF TBM TUNNELLING.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Hydro‐Mode ConversionTBM‐South

OPERATION STP (SLURRY TREATMENT PLANT)STP

Doc

umen

ts p

édag

ogiq

ues

inte

rnes

au

Mas

tère

TO

S

05.09.2011

12

Locks Crusher

RECONSTRUCTION CLOSED MODE – OPEN MODE.DISASSEMBLY SLURRY‐SET.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Pipes

CHALLENGE: TUNNELLING UNDER THE VALLEY SCHNECKTAL.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Overburden of only 4.2m

Fissured and brittle stratum at tunnel crown along the section of low overburden

Low strength sediments

Measures to avoid collapse scenario in view of minimal overburden of only 4.5m:

Contractor grouted the rock from the surface to a point just above the tunnel roof via grouting holes

CHALLENGE: TUNNELLING UNDER THE VALLEY SCHNECKTAL.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

holes.

Performance of exploratory drillings and rock improvement measures

Drilled and grouted bolts and/or pipe arch from within the shield

Possibility of drilling through the

CHALLENGE: TUNNELLING UNDER THE VALLEY SCHNECKTAL.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Possibility of drilling through the cutting wheel by means of a drilling platform via drilling ducts in the pressure bulkhead and/or submerged wall.

Possibility of drillings with inclinations of 8-10 degrees.

Performance of exploratory drillings and rock improvement measures

Drilled and grouted bolts and/or pipe arch from within the shield

Possibility of drilling through the

CHALLENGE: TUNNELLING UNDER THE VALLEY SCHNECKTAL.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Possibility of drilling through the cutting wheel by means of a drilling platform via drilling ducts in the pressure bulkhead and/or submerged wall.

Possibility of drillings with inclinations of 8-10 degrees.

Advance performance in open mode limited due to segment production 110 rings/week

S-419: Breakthrough Sept. 09 4 months prior to schedule

S-420: Breakthrough Febr. 10 7 months prior to schedule

ANALYSIS ADVANCE PERFORMANCES, OPEN‐CLOSED MODE.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Doc

umen

ts p

édag

ogiq

ues

inte

rnes

au

Mas

tère

TO

S

05.09.2011

13

SOCATOP, PARIS: ROAD TUNNEL FOR THE A86. 

LARGE DIAMETER TUNNEL EXCAVATION IN DENSE URBAN AREA.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

SOCATOP, PARIS: TUNNEL CROSS SECTION.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

DIFFERENT GEOLOGICAL SOIL FORMATIONS ALONG THE TUNNEL 

ALIGNMENT. CONVERTIBLE MACHINE PRINCIPLE.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

OpenMode EPB Slurry EPBSlurry

Mixshield Mode

THE CONVERTIBLE MIXSHIELD.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

EPB Mode

SMART, Kuala Lumpur, Malaysia Ø 13.21m, Mixshield

Silberwald, Moscow, RussiaØ 14.20m, Mixshield

Nanjing, ChinaØ 14 93m Mixshield

CHALLENGE: LARGE DIAMETER AND MULTI‐PURPOSE.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Ø 14.93m, Mixshield

M30 Madrid, Spain Ø 15.20m, EPB Shield

Shanghai Changjiang, ChinaØ 15.43m, Mixshield

Galleria Sparvo, ItalyØ 15.55m, EPB Shield

THE SMART IDEA. MULTI‐FUNCTION TUNNEL IN KUALA LUMPUR.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Doc

umen

ts p

édag

ogiq

ues

inte

rnes

au

Mas

tère

TO

S

05.09.2011

14

S-252 and S-253 | SMART | Kuala Lumpur | Malaysia

THE SMART IDEA.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Lumpur | Malaysia

2 MixshieldsShield diameter: 13,210mmTunnel length: 9,350mGeology: Limestone, sand, marbleCustomers: MMCEG-GamudaJV; Wayss+Freytag AG

SMART TUNNEL KUALA LUMPUR. GEOLOGICAL CONDITIONS.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

70 % traverses karstic limestone and sections in compact and fresh marble

30 % traverses quaternary alluvial deposits (silty, gravely sand) and mine tailings

Road tunnel section is marked red

POSSIBLE EXPLOARTION DRILLINGS FOR KARSTIC ZONES THROUGH THE 

SHIELD.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

EFFICIENT SOFT GROUND TUNNELLING

WITH ELECTRONIC WEAR DETECTION SYSTEM.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Actual information about cutting tool wear

Economical tool change

Limited damage on steel structure

Guide parameters from interdisciplinary processing of geotechnical, geodetic and machine data

CONTROLLED BORING PROCESS (CBP) ‐ CONTROL FOR MORE SAFETY.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

and machine dataOnline visualization of tunnelling

mac

hine

(PLC

) da

tam

achi

ne(P

LC)

data

geot

echn

ical

data

geot

echn

ical

data

Nav

igat

ion

Nav

igat

ion

Mod

ule

(n)

Mod

ule

(n)

Mod

ule

(n+2

)M

odul

e (n

+2)

TUnIS CBP – TUNNEL AND UNDERGROUND INTEGRATED SOFTWARE STRUCTURE FOR CBP. 

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

repo

rting

mod

ule

repo

rting

mod

ule

geol

ogy

geol

ogy

desi

gn d

ata

desi

gn d

ata

Mod

ule

(n+1

)M

odul

e (n

+1)

Mod

ule

(n+3

)M

odul

e (n

+3)

TUnIS data base structure with basic functions

Individual implementation of expert modules

Expandable – as and when required

Doc

umen

ts p

édag

ogiq

ues

inte

rnes

au

Mas

tère

TO

S

05.09.2011

15

SMART TUNNEL KUALA LUMPUR.

PERFORMANCES IN METERS PER MONTH.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

S-108 | 4th Tube Elbe Tunnel| Hamburg | Germany

1 Mixshield, Ø14.20mTunnel length: 2,560m

CUTTING WHEEL INTERVENTIONS. SAFETY ASPECTS.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

S-317 and S-318 | Changjiang Under River Tunnel | Shanghai | China

2 Mixshields, Ø15.43mTunnel length: 7,170m each

S-349 and S-350 | Nanjing| China2 Mixshields, Ø14.93mTunnel length: 2,933m each

S-108 | 4th Elbe River Tunnel | Hamburg | Germany

Mixshield

Diameter: 14,200mmTunnel length: 2,650m

Cutterhead power: 3,400kW

G l G l ilt d

4th ELBE RIVER TUNNEL | HAMBURG | GERMANY

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Geology: Gravel, silt, sand,

boulders

Customer: Bilfinger Berger AG, Dyckerhoff & Widman AG,

Heitkamp GmbH, HOCHTIEF AG,

Philipp Holzmann AG, Wayss &

Freytag AG, Ed. Züblin AG

CONNECTION TO THE EXISTING TUNNEL TUBES.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

DEMANDING GEOLOGY UNDER THE ELBE RIVER.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Access to the main arm of the cutting wheel under atmospheric pressure

Operator undertakes maintenance procedure’s

ONE OF THE MAJOR TECHNICAL INNOVATIONS.

CUTTING TOOL CHANGE IN FREE AIR.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

pwithout the risk of having to work at the tunnel face

Back loading cutting tools

Doc

umen

ts p

édag

ogiq

ues

inte

rnes

au

Mas

tère

TO

S

05.09.2011

16

S-317 and S-318 | Changjiang Under River Tunnel | Shanghai | China

2 Mixshields

Shield diameter: 15,430mm

Cutterhead power: 3,500kW

THE WORLD’S LARGEST MIXSHIELDS.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Tunnel length: 7,170m each

Geology: Sand, clay, shell debris

End user: Shanghai ChangjiangTunnel & Bridge Construction Co., Ltd.

ACCESSIBLE CUTTING WHEEL SPOKES FOR TOOL CHANGE IN FREE AIR.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Date of contract: February 8, 2005

Start tunnelling S-317: September 2006 S-318: December 2006

BreakthroughS-317: May 2008

A CHALLENGING TIME SCHEDULE.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

S 317: May 2008S-318: September 2008

In total 75,000 lining segments (16 t each) for 14,340m of tunnel.

Tunnel was opened for the traffic in time for the World Expo 2010.

SHANGHAI, CHINA. BREAKTHROUGH OF THE WORLD‘S LARGEST 

MIXSHIELDS 12 AND 10 MONTH EARLIER THAN SCHEDULED.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

S-317May 28, 2008

S-318September 5, 2008

THE WESTERSCHELDE ROAD TUNNEL PROJECT, THE NETHERLANDS.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

GEOLOGY AT WESTERSCHELDE. PRESSURE OF UP TO 7.5 BAR.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Doc

umen

ts p

édag

ogiq

ues

inte

rnes

au

Mas

tère

TO

S

05.09.2011

17

MACHINE FEATURES AGAINST CLOGGING BEHAVIOR.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Pressure chamber system for up to 12 divers and technicians enables divers a long-term stay under pressure

Transport shuttle:

Length: 2,500mm

Diameter: 1,300mm

WORKING IN UP TO 7.5 BAR.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Diver Capacity: 4

BREAKTHROUGH AFTER 6.6 KILOMETERS.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

PERSPECTIVES. SUPPORT PRESSURE DEVELOPMENT.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

SUPPORT PRESSURE DEVELOPMENT. TYPES OF DIVING APPLICATIONS DEPENDING ON REQUIRED FACE SUPPORT PRESSURE.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Atmospheric access to cutting tools

Easy access to information about wear of each cutting tool and steel structure

ACCESSIBLE CUTTING WHEEL. KEY BENEFITS.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Drastic reduction of hyperbaric interventions

Possibility to flange man lock to center

Possibility to increase pressure within the accessible cutting wheel

Doc

umen

ts p

édag

ogiq

ues

inte

rnes

au

Mas

tère

TO

S

05.09.2011

18

EPB‐SHIELD. THROUGH SOFT GROUND WITH EARTH PRESSURE.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

1. Tunnel face2. Cutting wheel

3. Excavation chamber

4. Pressure bulkhead1

8

EARTH PRESSURE BALANCED SHIELD. OPERATIONAL PRINCIPLE.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

5. Thrust cylinders

6. Screw conveyor7. Erector

8. Segment lining23

4

5

6 7

EARTH PRESSURE BALANCED SHIELD. FACE PRESSURE CONTROL.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

GRAVELSANDSILTCLAY

coarsemediumfinecoarsemediumfinecoarsemediumfine

ng[%

]

60

70

80

90

100

EPB

tency, foam for stickiness

ure

GRAVELSANDSILTCLAY

coarsemediumfinecoarsemediumfinecoarsemediumfine

ng[%

]

60

70

80

90

100

GRAVELSANDSILTCLAY

coarsemediumfinecoarsemediumfinecoarsemediumfine

GRAVELSANDSILTCLAY

coarsemediumfinecoarsemediumfinecoarsemediumfine

ng[%

]

60

70

80

90

100

EPB

tency, foam for stickiness

tency, foam for stickiness

ureure

APPLICATION RANGE: EPB SHIELD.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Perc

entP

assi

n

Particle Size [mm]

0

10

20

30

60 10020620,60,20,060,020,0060,002

40

50

60

1Water fo

r consisten

2Foam

3Foam + Polymers, water pressure < 2 bar

4Foam + Polymers + fines, no water pressure

Perc

entP

assi

n

Particle Size [mm]

0

10

20

30

60 10020620,60,20,060,020,0060,002

40

50

60

Perc

entP

assi

n

Particle Size [mm]

0

10

20

30

60 10020620,60,20,060,020,0060,002

40

50

60

1Water fo

r consisten

1Water fo

r consisten

2Foam

2Foam

3Foam + Polymers, water pressure < 2 bar

3Foam + Polymers, water pressure < 2 bar

4Foam + Polymers + fines, no water pressure

4Foam + Polymers + fines, no water pressure

Closed Mode Semi open mode or Compressed Air Mode

EPB OPERATION MODES.

CLOSED MODE, SEMI OPEN MODE, OPEN MODE.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Open Mode

To be useable as support medium, the soil has to fulfil following requirements:

Capability to extrude.Cohesive and plastic.

EPB‐SHIELD. SOIL REQUIREMENTS.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Soft to stiff consistency.Lower inner angle of friction.Low water permeability.Good elasticity.

Doc

umen

ts p

édag

ogiq

ues

inte

rnes

au

Mas

tère

TO

S

05.09.2011

19

If the soil requirements are not existing, the soil has to be conditioned. The conditioning is dependent on following soil parameters:

Grain size distribution.

EPB‐SHIELD. CHOICE OF CONDITIONING.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Water content, w (%).Liquid limit, wL (%).Plasticity Index, IP andConsistency Index, IC.

Bentonite.Water.Polymers.Foam.

EPB‐SHIELD. INJECTION MATERIAL.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

The initial state of the soil should be kept unchanged as possible; the consistency of the soil should guarantee the transport to the disposal site and should be economical.

Three main areas of conditioning:

Porous, non-cohesive soil: Conditioning required to get a plastic material to achieve a reliable earth pressure build-up in the working chamber.

EARTH PRESSURE BALANCED SHIELD. APPLICATION RANGE AND NEED FOR CONDITIONING.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Silty sands: Conditioning shows positive effects regarding the reduction of abrasion and the reduction of the torque. This enables higher advancement speed of the TBM.

Clay: Conditioning required to reduce clogging and adhesion problems

EPB‐SHIELD. FOAM INJECTION POINTS.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

EPB‐SHIELD. STATORS FOR MIXING AND CONDITIONING OF EXCAVATED MATERIAL.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Stators for mixing excavated material

Low density.Optimum mixing with soil.Reduction of internal friction.Reduction of cutting wheel torque.Reduce soil adhesion to metal of

ADVANTAGES OF CONDITIONING. SOFT GROUND.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

shield/ cutting wheel.Reduce soil permeability.Reduction of wear.Higher temporary face stability.

Doc

umen

ts p

édag

ogiq

ues

inte

rnes

au

Mas

tère

TO

S

05.09.2011

20

CONDITIONING OF SOFT SOIL WITH FOAM.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Low cohesive sand

Short-term cohesion via foam

Reduction of dust.Reduction of blocked disc cutters, clean disc and faster tool change possible.Greater cooling effect with foam than with water.Lower wear, abrasion.Lower torque.

ADVANTAGES OF CONDITIONING. HARD ROCK.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Foam for structuring

BARCELONA, SPAIN: SAFE INNERCITY TUNNELLING WITH LARGE 

DIAMETER TBMs IN VARIABLE SOILS.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Gorg

BARCELONA, SPAIN.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

S-221 | Metro Line 9 | Barcelona |

Spain

EPB Shield

Shield diameter: 12,060mm

Cutterhead power: 4 000kW

BARCELONA, SPAIN.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Cutterhead power: 4,000kW

Tunnel length: 8,500m

Geology: Granodiorite, Sand,

Clay, Gravel

Customer: Dragados, Necso,

ACS, Comsa, Sorigue

Tunnel profile for a double-deck metro tunnel (with platform in the station area)

Sensible structure with density f b ildi

BARCELONA: RISK CONTROL WITH LARGE DIAMETER TBMs, DENSITY OF 

DEVELOPMENT, VARIABLE SOILS.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

of buildings

Variable, geological conditions: Soft and hard rock, boulders, groundwater

High abrasivity due to variable geology

Doc

umen

ts p

édag

ogiq

ues

inte

rnes

au

Mas

tère

TO

S

05.09.2011

21

MIXED TUNNEL FACE CONDITIONS. SOFT AND HARD ROCK AT TUNNEL 

FACE IN BARCELONA.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

60 METERS / 40 RINGS PER DAY.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

S-300 | Road Tunnel M30 | Madrid | Spain

EBP ShieldDiameter: 15,200mmTunnel length: 3,600mCutterhead power:

ONE OF THE WORLD‘S LARGEST EPB SHIELD.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Cutterhead power: 12,000kW + 2,000kWGeology: Clay, gypsumCustomer: FerrovialAgroman, S.A., AccionaInfrastructuras

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Required cutting wheel drive torque of 125,000,000Nm

Limitation of the shield roll due to the high installed torque

Agitating of the excavated

REQUIRED MACHINE CHARACTERISTICS.

material in order to prevent clogging in the centre area

Excavation and conditioning of 363m³ for an advance of 2m at a maximum speed of 65mm/min

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Two independent drive units allowing counter clockwise rotation

32 foam generators with a max capacity of 700m³/h

Three screw conveyors with a

THE MACHINE DESIGN.

Three screw conveyors with a capacity of 2x900m³/h and 1x250m³/h

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Doc

umen

ts p

édag

ogiq

ues

inte

rnes

au

Mas

tère

TO

S

05.09.2011

22

MUCK CONTOL. BELT WEIGHING SYSTEM.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

LASER SCANNER FOR MUCK CONTROL.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

3 vessels on the Rhine River to Rotterdam

1 vessel Rotterdam – Alicante

1 vessel Rotterdam - Bilbao

102 t k di tl G

FROM SCHWANAU TO MADRID IN 3 MONTHS.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

102 trucks directly Germany -Madrid

Reassembly of equipment on jobsite 24h/7 days within 12 weeks

Completion of the advance in 8.5 months, 3.5 months

Cycle times for excavation of 2m length incl. ring erection

SPEED TUNNELLING IN MADRID.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

0

100

200

300

400

500

50 100

150

200

250

300

350

400

450

500

550

600

650

700

750

800

850

900

950

1000

1050

1100

1150

1200

1250Ring

Zeit

Feb. 2, 2005Beginning of w

orkshop assembly

March 23, 2007

Inauguration

June 2, 2004M

achine ordered at H

errenknecht

June 6, 2005W

orkshop acceptance

Nov. 5, 2005

Start of Tunnelling

July 17, 2006Breakthrough

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

2005 2006 2007

EUROPE. ITALY. GALERIA SPARVO.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

2 parallel road tunnels, each with 3 lanes

Extending the highway between Bologna and Florence

Challenge: Large diameter and geological conditions

Doc

umen

ts p

édag

ogiq

ues

inte

rnes

au

Mas

tère

TO

S

05.09.2011

23

Galeria Sparvo | Italy

EPB Shield Ø:Cutterhead power: Tunnel length:

d

15,550mm

12,000kW 2 x 2,500m

THE WORLD‘S LARGEST TUNNEL BORING MACHINE.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

End user: Joint venture of Toto CostruzioniGenerali, Vianini Lavoriand Profacta

S-441 | Escalator Shaft | St. Petersburg | Russia

EPB ShieldDiameter: 10,690mmCutterhead power: 1,200kW

Tunnel length: 120mGeology: Soft and hard clayCustomer: OAO Metrostroy

S‐441 |ESCALATOR SHAFT | ST. PETERSBURG | RUSSIA.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

30°

S‐441 |ESCALATOR SHAFT | ST. PETERSBURG | RUSSIA.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

S‐512 AND S‐514 | BRISBANE AIRPORT LINK | BRISBANE | AUSTRALIA.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

S-512 and S-514 | Brisbane Airport Link | Brisbane | Australia

2 EPB ShieldsDiameter: 12,450mmTunnel length: 2,422m each

Geology: Brisbane tuff, weathered zonesCustomer: Thiess Pty. Ltd., John Holland Engineering Pty. Ltd.

Double Gripper-TBM:S-96 TBM 3000, ∅ 3.00m

Single Gripper-TBM:S-155 Tscharner, ∅ 9.53m

HARD ROCK TBMs.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Double Shield-TBM:S-153 La Réunion, ∅ 3.80m

Shielded-TBM with articulation joint:S-163 Sörenberg, ∅ 4.56m

CUTTERHEAD. EXCAVATION AND MUCKING.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Doc

umen

ts p

édag

ogiq

ues

inte

rnes

au

Mas

tère

TO

S

05.09.2011

24

HARD ROCK CUTTING PROCESS.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

HARD ROCK TBM. DISC CUTTERS.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

center disc cutter

single ring disc cutters

double ring disc cutters

DiscSteel structure cutterhead

Bearing housing

HARD ROCK TBM. CUTTERHEAD DESIGN. HOUSING.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Spacing

HARD ROCK TBM. CUTTING PROCESS. CHIPPING.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Spacing

Spacing influences:

• Number of disc cutters

• Chip size

• Loads on cutters

Loads on cutterhead

HARD ROCK TBM. CUTTING PROCESS. CHIPPING.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

• Loads on cutterhead

• Penetration

• Wear behavior disc cutter

HARD ROCK TBM. CUTTERHEAD DESIGN.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

The cutterhead fulfills following functions:• Carrier of disc cutters

• Pick up of material at the tunnel face

• Supporting the tunnel face in case of falling rock

Doc

umen

ts p

édag

ogiq

ues

inte

rnes

au

Mas

tère

TO

S

05.09.2011

25

Backloading cutters

Higher Cutterloads

Larger Diameters

HARD ROCK EXCAVATION.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Cutterhousing & Structure

Buckets

Cutter Handling

A1B1

D1C1

A1A2

B1

B2

C1

CUTTER GROUP ARRANGEMENT. 

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

C2D2

A2 B2

C2

D1

D2

CUTTER HANDLING. 

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

CUTTERHEAD DETAILS. 

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

CUTTERHEAD ACCESS. 

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

CUTTER HANDLING.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Doc

umen

ts p

édag

ogiq

ues

inte

rnes

au

Mas

tère

TO

S

05.09.2011

26

BACKLOADING CUTTERHEAD. CUTTER EXCHANGE.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

SINGLE SHIELDED HARD ROCK TBM.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

SINGLE SHIELDED HARD ROCK TBMs.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Perschling, Austria. ∅12.98m

Wienerwald, Austria.∅10.695m

Islisberg, Switzerland. ∅11.805m

“Swiss system”: double lining

SINGLE SHIELD TBM. THRUST RING.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Double-shell Single-shell

TUNNEL LINING SYSTEM FOR TBM USE.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

[Girmscheid 2000]

High quality of the precast segmentsHigh load capacity shortly after ring erectionEasy detection of leakages and easy repair work

ADVANTAGES OF THE SINGLE SHELL SEGMENT LINING. 

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Lower costs than for a double shell lining (no inner lining)Real loads on inner lining are not clear

Doc

umen

ts p

édag

ogiq

ues

inte

rnes

au

Mas

tère

TO

S

05.09.2011

27

Necessary for:

Water tunnels (fresh water, headrace tunnels and sewers) with high requirements for water tightness

Water tunnels with high water pressure

DOUBLE SHELL LINING WITH SEGMENTS AND IN SITU CAST INNER LINING.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Water tunnels with high water pressure

Tunnels for the transport of dangerous materials (f.i. nuclear fluids) to protect the sealing

Special loads

Swing support roller

SINGLE SHIELD TBM. THRUST RING.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Thrust ring

Withdrawal of the thrust ring and placing of the bottom segments.

Placing of the left and right tunnel

Spreading of the bottom segments and placing of the key stone.

Pushing forward

SINGLE SHIELD TBM. THRUST RING.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

and right tunnel side wall segments.

Placing of the crown segment

Pushing forward of the thrust ring and pea gravel injection in the annular gap.

S-56 | N 3 Bözberg, Aarau | Switzerland

Single Shield Hard Rock TBM

Diameter: 11,800mm

FIRST LARGE DIAMETER IN HARD ROCK.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Tunnel length: 2x 3,200m

S-60 Single Shield Hard Rock TBM

Diameter 11,740mm

Tunnel length: 3,550m

Road Tunnel

SWITZERLAND: TUNNEL DU MONT RUSSELIN.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

S-287 Single Shield Hard Rock TBM

Diameter 9,900mm

Tunnel length 7,650+ 2,750m

PAJARES.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

S-281 Double Shield

Diameter 10,160mm

Tunnel length 10,700+ 3,700m

Doc

umen

ts p

édag

ogiq

ues

inte

rnes

au

Mas

tère

TO

S

05.09.2011

28

DOUBLE SHIELD TECHNOLOGY FOR HARD ROCK TUNNELLING.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

S-201/202 Double Shield TBM

Diameter 9,510mm

Tunnel length 14,292 + 14,428m

GUADARRAMA.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

S-373 | Cabrera | Spain

Double Shield TBM

Diameter: 9,690mm

Tunnel length: 2 x 6,200m

Geology: Limestone

S‐373 | CABRERA| SPAIN.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Geology: Limestone

Client: FCC Construcción S.A.; ConstruccionesSanchez Dominguez-Sando S.A.

Daily best performance: 105.6m / 66 rings

Weekly best performance: 435m / 290 rings

HIGH SPEED TUNNELLING IN SPAIN. S‐373 CABRERA.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Monthly best performance: 1688m / 1055 rings

NORTH‐SOUTH BYPASS TUNNEL. BRISBANE.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

S-375 and S-376 | North-South Bypass Tunnel | Brisbane | Australia

2 Double Shield TBMsDiameter: 12,340mmTunnel length: 3,997m + 3,932m

Geology: Welded tuff, Arenites, Phyllites with quartz veins, faulted rockCustomer: Baulderstone Hornibrook; Bilfinger Berger AG; Leighton Contractors

NORTH‐SOUTH BYPASS TUNNEL. BRISBANE.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Doc

umen

ts p

édag

ogiq

ues

inte

rnes

au

Mas

tère

TO

S

05.09.2011

29

APRIL 16, 2009.

BREAKTHROUGH S-376 FLORENCE IN WOOLLOONGABBA.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

GRIPPER TECHNOLOGY FOR HARD ROCK TUNNELLING.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

GRIPPER TBM. TUNNEL SUPPORT IN WORKING AREA L1.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Anchoring and steel arching

GRIPPER TBM. TUNNEL SUPPORT IN WORKING AREA L1.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

GRIPPER TBM. TUNNEL SUPPORT IN WORKING AREA L1.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Fix installed probe drilling unit Pivot anchor / injection drilling unit

AnchoringExploratory drilling

GRIPPER TBM. TUNNEL SUPPORT IN WORKING AREA L1.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Doc

umen

ts p

édag

ogiq

ues

inte

rnes

au

Mas

tère

TO

S

05.09.2011

30

GRIPPER TBM. TUNNEL SUPPORT IN WORKING AREA L1.

WIRE MESH ERECTOR.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

WIRE MESH ERECTOR.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

AUTOMATIC SHOTCRETE ROBOT L2.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

ROCK SAFETY CONCEPT.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

2000: S-167 Steg and S-174 Raron

9,430mm diameter, 18,850m tunnel in total

In operation since 2007

LÖTSCHBERG BASE TUNNEL.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

85km of mechanized tunnelling in total

Up to approx. 2,500m overburden

Tectonically active massif (alps folding)

GOTTHARD BASE TUNNEL.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Doc

umen

ts p

édag

ogiq

ues

inte

rnes

au

Mas

tère

TO

S

05.09.2011

31

Bodio – Faido / Faido – Sedrun

2 Gripper TBMDiameter: 8,830mm (9,430mm)Cutterhead power: 3,500kWTunnel length: 49,839mCostomer: Consorzio TAT (Implenia Industrial Construction, Alpine Bau GmbH, CSC ImpresaCostruzioni SA Hochtief AG Impregilo SpA)

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Costruzioni SA, Hochtief AG, Impregilo SpA)

Amsteg – Sedrun / Erstfeld - Amsteg

2 Gripper TBMDiameter: 9,580 mmCutterhead power: 3,500kWTunnel length: 35,687mCustomer: AGN (STRABAG AG TunnelbauSchweiz (CH)/ STRABAG AG (A) )

The difference between the geologic prediction and the findings is great.The rock conditions have proven to be less favorable than expected.The relevance in terms of construction can change very quickly.

GOTTHARD BASE TUNNEL. CHALLENGES.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Strain redistributions can occur over 3x the excavation diameter in fault zones and zones with low rock strength.The tunnelling systems used are capable of mastering significantly more difficult situations than originally thought.

Enlargement of cutterhead (incl. diameter relevant parts) from 8.8m to 9.4m in respect of expected convergences and more intensive support measures.

Shifting of cutters to enlarge the cutterhead diameter to 9.5m.

Spiral arrangement of cutters.

MODIFICATIONS DUE TO EXPERIENCES MADE DURING 

EXCAVATION OF SECTION BODIO.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

p g

Increase number of cutters and buckets

Reinforcement of cutterhead shield and dust shield

Replacement main drive

Revision of motors, gear, hydraulic cylinders

Increasing the back-up by three wagons

S-575 | Linth Limmern | Switzerland

Gripper-TBMDiameter: 5,200mmTunnel length: 2 x 1,000m

40° INCLINE TUNNEL FOR HYDROELECTRIC POWER.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Cutterhead power: 2,205kWGeology: limestoneIncline: 85% 40°Customer: Marti Tunnelbau

S‐575 LINTH LIMMERN, SWITZERLAND.

40° INCLINE FOR HYDROELECTRIC POWER.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

More complex challenges in terms of construction ground and logistics

Gotthard Base Tunnel (high rock overburden, fault zones, squeezing rock conditions), M30 Madrid (inner city tunnelling with Ø15.20m)

TENDENCIES IN MECHANIZED TUNNELLING.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Long tunnel drives with larger diameters under high groundwater pressure

Gotthard Base Tunnel (2x57km), Shanghai (Ø15.43m), Lake Mead (17bar)

Demand for well-engineered technology to produce high-capacity infrastructure systems.

Doc

umen

ts p

édag

ogiq

ues

inte

rnes

au

Mas

tère

TO

S

05.09.2011

32

Escalators shafts

Tunnel renovation:

- Road Tunnels

- Railway tunnels

PERSPECTIVES. INNOVATIVE DIRECTIONS.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

VSM – Vertical Shaft Sinking

- Offshore

- U-Park

SBS – Shaft Boring System

Now and in the future: Demand for high-efficient infrastructure

Push for innovations:

- Safety, cost effectiveness, efficiency, integrated package solutions

T h i l l ti f h ll

PERSPECTIVES.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

- Technical solutions for every challenge

Large scale infrastructure schemes to benefit from economic stimulus plans

Teamwork Tunnelling to guarantee best possible project success: project owners, planers/ consultants, constructors, machine suppliers)

THANK YOU FOR YOUR ATTENTION.

INSA Lyon  ‐ ENTPE                                                                                     MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012

Doc

umen

ts p

édag

ogiq

ues

inte

rnes

au

Mas

tère

TO

S