TUNNEL BORING MACHINES: TYPES AND CRITERIA FOR TBM SELECTION
MASTERE SPECIALISE
TUNNELS et OUVRAGES SOUTERRAINSDe la conception à l’exploitation
FOR TBM SELECTION.
Dr. Karin Bäppler
Herrenknecht AG, Germany
TUNNEL BORING MACHINES: TYPES AND CRITERIA FOR TBM SELECTION.
Selection of Tunnelling Machine SystemsClassification scheme for tunnelling machines Geological consideration for TBM selectionOverview machine typesCase studies
GeologyGroundwater pressureGroundwater pressureComplex, changing geological conditions
DiameterThree and four-lane road tunnelsMulti-purpose tunnels
PerspectivesSupport pressure developmentInnovative directions
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
SELECTION OF TUNNELLING MACHINE SYSTEMS. RECOMMENDED STEPS IN THE DECISION MAKING PROCESS.
Step 1
Step 2
Step 3
Analysis of geotechnical reports and ground profiles (Basis:DIN4020)
Result: Preliminary choice of types of Tunnelling Machine
Analysis of system behavior (boreability, face stability, wear prognosis..)
Result: Basic requirements for excavation, face support, support medium. Localization of preliminary choice of TBM types
Classification of tunnel regarding feasible machine types
Result: Qualitative prognosis of suitable machine types along tunnel alignment
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Step 4
Step 5
Step 6
Step 7
Analysis of muck behavior (stickiness, wear)
Result: Requirements for the muck transport system. Localization of preliminary TBM choice
Analysis of muck behavior in follow‐up systems (suitability as construction material or for landfill depositing)
Result: Requirements for further muck handling. Localization of preliminary choice
Definition of Excavation Classes: Final choice of TBM type
Division of tunnel in sections of similar behavior
Result: Tunnel profile with partitions, quantitative prognosis of excav. Classes, operational definitions, summary of characteristic ground parameters
Recommended steps by: DAUB
Geology or hydrogeology
affect the way and extent of
de‐watering workswater permeabilitysoil conditioningtunnel face supportsupport medium, increase of thrust forceshandling of bouldersoverburden, settlement & heave tunnel alignment, gradient
GEOTECHNICS. INFLUENCE OF GEOLOGY AND HYDROGEOLOGY.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Selection of machine and operation principle
Success of project
soil bearing capacity, soil stabilizationsoil disposal
Geological longitudinal profile with vertical alignment of the tunnel, groundwater table and possibly borehole locations
Horizontal alignment of the tunnel with borehole locations
Grain size distribution curve
Wet density γ, Angle of internal friction ϕ, Cohesion c, undrained cohesion cu, permeability k
Groundwater conditions
Atterberg Limits: plastic limit liquid limit natural water content (consistency and
SELECTION OF TBM TYPE TO BE USED FOR SOFT/ HARD ROCK. RELEVANT PARAMETERS FOR THE EVALUATION OF MACHINE TYPE.
Atterberg Limits: plastic limit, liquid limit, natural water content (consistency and plasticity indexes)
Modulus of elasticity Ec, Earth pressure coefficient K0
Possible existence of boulders: rock type, expected amount, expected sizes, UCS, quartz content, CAI
Unconfined Compressive Strength (UCS)
Tensile Strength
Cerchar Index (CAI, wear behaviour)
Max. Expected water inflows/ groundwater pressure
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
torque calculation
GEOTECHNICS
GEOLOGY + HYDROGEOLOGY
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
wear prognosis
Doc
umen
ts p
édag
ogiq
ues
inte
rnes
au
Mas
tère
TO
S
05.09.2011
2
CONCEPTIONAL OVERVIEW OF THE THREE MAIN PARAMETERS
INFLUENCING EXCAVATABILITY.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
TUNNELING MACHINES. CLASSIFICATION SCHEME ACCORDING TO DAUB FOR ALL TYPES OF TUNNELLING MACHINES.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
OVERVIEW MACHINE TYPES.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Soft ground TBMs
TRAFFIC TUNNELLING.ALL TECHNOLOGIES ABOVE 6 m.
Soft ground TBMs
EPB-Shield (Earth Pressure Balanced Shield)
Mixshield.
Hard Rock TBMs
Shielded Hard Rock TBM (Single Shield, Double Shield)
Hard Rock Gripper TBM
Dual Mode TBMs
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Single Shield TBM
Open Mode
Conversion
MOVING TOWARDS MULTIMODE.THREE BASIC SHIELDED TBM SYSTEMS.
Closed Mode
Slurry Shield EPB Shield
• integrated• modular
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
MODE
MIXSHIELD.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Slurry Compressed Air EPB Hard Rock
Doc
umen
ts p
édag
ogiq
ues
inte
rnes
au
Mas
tère
TO
S
05.09.2011
3
WE OFFER THE COMPLETE RANGE IN MECHANIZED TUNNELLING.
For all Demands and every Geology.
For all Media and Traffic Systems.
All Sizes and Technologies.
All Services as a Full Service Provider.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
TUNNELLING WITHOUT TUNNEL SUPPORT.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Tunnel lining
Cast-in-place PrecastImmediate ground
support
TUNNEL LINING.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Shotcrete Bolting Concrete Concrete segments
Steel segments
Block segment
Trapezoidal segment
....
Shotcrete
In-situ
Shotcrete robot
TUNNELLING WITH FINAL TUNNEL SUPPORT.
concrete
Segments
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
A precast concrete lining for a TBM-driven tunnel generally comprises asequence of rings placed side-by-side.One ring is divided into sectors socalled segments.
Tail Skin
Tail Skin sealing
Grouted Material
SHIELDED TBMs.GENERAL ASPECTS OF SEGMENTAL CONCRETE TUNNEL LINING.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
TBM Advance
INSTALLATION OF SEGMENTS BY THE SEGMENT ERECTOR.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Doc
umen
ts p
édag
ogiq
ues
inte
rnes
au
Mas
tère
TO
S
05.09.2011
4
Suction plate (vacuum).Segment grab (mechanical).
SEGMENT ERECTOR FOR RING BUILDING.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Mechanical erector:
SEGMENT ERECTOR. RING BUILDING.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Vacuum erector:
BACKFILLING OF THE ANNULAR GAP.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Are determined by:
The thickness of the shield shell.
The height of the shield tail seal.
The support construction of the shield tail seal.
DIMENSIONS OF ANNULAR GAP.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
The conical form of the shield.
The ground displacement in curves.
The overcut.
Filing of the annular gap between the outer lining surface and the tunnel wall serves the following functions:
In the long term:
Ensures the most uniform bedding
In the short term:
Ensures effective bedding of the
PURPOSE OF ANNULAR GAP‐BACKFILLING.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
gbetween the lining and the ground.
In certain special cases it provides an additional seal.
glining against the enclosing ground.
Minimizes surrounding ground deformations which can cause settlements both above and below ground.
Back-filling material must be:
Sufficiently fluid to facilitate its placement and to fill completely the annular gap.
S ffi i tl fi t id l k th h th hi ld t il l d t
REQUIREMENTS OF AN EFFECTIVE BACKFILLING MATERIAL.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Sufficiently firm to avoid leakage through the shield tail seals and segment water proofing gaskets.
Sufficiently firm to avoid seepage flows along the shield tail towards the front of the TBM.
Doc
umen
ts p
édag
ogiq
ues
inte
rnes
au
Mas
tère
TO
S
05.09.2011
5
Through the lining by means of
holes incorporated in the
segment structure.
CONVENTIONAL BACKFILLING METHODS.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Grouting at the rear end of the
shield tail through integrated
grout pipes arranged
longitudinally within the tail.
annular gap
Shield tail
soil
GROUTING OF THE ANNULAR GAP THROUGH THE TAILSKIN IS TODAY’S STATE OF THE ART.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
segment ring
BACK FILLING. GROUTING THROUGH THE TAILSKIN.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
BACK FILLING. GROUTING THROUGH THE TAILSKIN.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
MATERIALS FOR ANNULAR GAP‐BACKFILLING AND PHYSICAL PROPERTIES OF GROUTS IN TERMS OF HARDENING TIME.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Cohesive soil conditions (high fines content and sticky soil)
Blocks and boulders, layers of hard rock, obstacles
Mixed face conditions
Abrasive ground
Very coarse soil conditions
MACHINE DESIGN.SPECIAL ATTENTION IN RESPECT OF GROUND CONDITIONS .
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
High groundwater pressure
Low overburden
Underpassing of waterways, existing buildings and structures
Presence of gas
Karst formations
Swelling
Squeezing
Doc
umen
ts p
édag
ogiq
ues
inte
rnes
au
Mas
tère
TO
S
05.09.2011
6
100
90
80
70
Sieve Size
FineClaySilt Sand Gravel
Medium MediumCoarse Fine Coarse Fine Medium Coarse
SOFT GROUND TBMs. APPLICATION RANGE OF EPB AND MIXSHIELDS.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
EPB Methods Mixshield Methods
60,020.06,02,00,60,20,060,020,0060,0020,001
40
30
20
10
0
60
50
Grain diameter d (mm)
GRAVELSANDSILTCLAY
coarsemediumfinecoarsemediumfinecoarsemediumfine
ng[%
]
60
70
80
90
100
GRAVELSANDSILTCLAY
coarsemediumfinecoarsemediumfinecoarsemediumfine
GRAVELSANDSILTCLAY
coarsemediumfinecoarsemediumfinecoarsemediumfine
ng[%
]
60
70
80
90
100
Fluid-Supported
+ se
para
tion
+ se
para
tion
susp
ensio
n+fill
ers
susp
ensio
n+fill
ers
es, h
igh se
para
tion
effo
rt
es, h
igh se
para
tion
effo
rt
APPLICATION RANGE: FLUID‐SUPPORTED SHIELD.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Perc
entP
assi
n
Particle Size [mm]
0
10
20
30
60 10020620,60,20,060,020,0060,002
40
50
60
Perc
entP
assi
n
Particle Size [mm]
0
10
20
30
60 10020620,60,20,060,020,0060,002
40
50
60
ASt
anda
rd a
pplic
ation
+
ASt
anda
rd a
pplic
ation
+
CFa
ce su
ppor
t diffi
cult:
s
CFa
ce su
ppor
t diffi
cult:
s
BAn
ti-clo
gging
-mea
sure
s
BAn
ti-clo
gging
-mea
sure
s1. Submerged wall
2. Working chamber
3. Air cushion
4. Pressure bulkhead1
3
MIXSHIELD. GENERAL LAYOUT.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
2
4
MIXSHIELDS.SUPPORT PRESSURE REGULATION.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
ACCURATE FACE PRESSURE CONTROL VIA AIR BUBBLE PRINCIPLE.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
slurry soil
Membrane model Penetration model
slurry soilΔP
THE 2 MODELS FOR TRANSMITTING THE CONFINEMENT PRESSURE TO THE TUNNEL FACE (SLURRY SHIELDS).
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Filter cake formed Pure penetration
Doc
umen
ts p
édag
ogiq
ues
inte
rnes
au
Mas
tère
TO
S
05.09.2011
7
Thickness of filter cake:
4% loose bedding, low compactness
MIXSHIELD. CREATION OF A FILTER CAKE.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
p
5% medium dense bedding
6% loose bedding, high compactness
Support of the tunnel face by developing a filter cake for the
FUNCTION OF BENTONITE SUSPENSION IN MIXSHIELD TECHNOLOGY.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Support of the tunnel face by developing a filter cake for the transfer of the hydrostatic pressure. The air-pressure-stable filter cake enables the inspection of the tunnel face or maintenance works in the excavation chamber.
Transportation of the excavated material through powerful pumps in a slurry circuit to the separation plant on surface.
Keeping the dissolved soil in suspension, even during standstill of the shield.
FLUID‐SUPPORTED SHIELD (HYDRO SHIELD, SLURRY SHIELD).
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
SLURRY CIRCUIT.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
SLURRY CIRCUIT – FEED LINE.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
SLURRY CIRCUIT – DISCHARGE LINE.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Doc
umen
ts p
édag
ogiq
ues
inte
rnes
au
Mas
tère
TO
S
05.09.2011
8
CLASSIFICATION OF THE DIFFERENT TYPES OF MATERIAL TRANSPORT.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
V VV
homogeneous transport pseudo‐homogeneous
transportheterogeneous transport
XPreliminary sieve
Sticky soil
SiltFine sandMedium grained
sand
Coarse sand
Gravel
X X
SEPARATION TECHNOLOGY. SEPARATION STEPS.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Centrifuge/filtration
2. Hydrocyclone-StageDewatering sieve
1. Hydrocyclone-StageDewatering sieve
X X
X X X
X X
TBM diameterAverage and maximum TBM advance speedTotal quantity m³/hGrain size distribution curve up to 2µm
REQUIRED INFORMATION FOR THE DESIGN OF A SEPARATION PLANT.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
to 2µmMaximum grain sizeInformation about the geologyPossibilities for disposal of excavated materialRequirement of customer (e.g. space requirement, sound proofing,…).
1 101,201,301,401,50
x I C
[-]
ry s
tiff
hard
tunnel face clay clogging at cuttingtools
cutte
rhea
drim
tunnel face clay clogging at cuttingtools
cutte
rhea
drim
Improved slurry circuit and flushing
COHESIVE SOIL CONDITIONS (HIGH FINES CONTENT, STICKY SOIL).IDENTIFICATION OF CLOGGING POTENTIAL.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
0,300,400,500,600,700,800,901,001,10
0 10 20 30 40 50 60 70Plasticity Index IP [%]
Con
sist
ency
Inde
x
Low potential for clogging
Medium potential for clogging
High potential forclogging
med
ium
stiff
veso
ft
cutterhead arm
c
cutterhead arm
c
Figure by: M. Thewes
Center cutter
Flow optimization
High flushing pressure
Bypass flushing
Distribution of flushing nozzles in the working chamber
Geometric design of cutting wheel spokes
COHESIVE SOIL CONDITIONS (HIGH FINES CONTENT, STICKY SOIL).COUNTER‐MEASURES.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Geometric design of cutting wheel spokes
Geometric design of the working chamber (material flow)
Chemical additives
Agitators
Roller crushers
In case of EPB Shields eventual clogging is countered by the
conditioning with foam and/or bentonite
150150
200200
250250
158%158%
ACTIVE CENTRE CUTTER. TORQUE REDUCTION OF THE CUTTERHEAD.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
00
5050
100100Without Centre CutterWithout Centre Cutter
With Centre CutterWith Centre Cutter
100%100%
Torque of the cutterhead (mto)Torque of the cutterhead (mto)
Doc
umen
ts p
édag
ogiq
ues
inte
rnes
au
Mas
tère
TO
S
05.09.2011
9
MIXSHIELD. STONE CRUSHER TO HANDLE BLOCKS, BOULDERS OR BIG CLAY LUMPS.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Conveyor belt scale
Laser scanning
Flow meter
Density sensors
MUCK FLOW/ BULK CONTROL. COMPARING THEORETICAL AND ACTUALLY EXCAVATED AMOUNTS OF SOIL.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
MASTERING NATURAL AND ARTIFICIAL OBSTACLES.SYSTEM FOR SEISMIC PROBING AHEAD.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Detection of anomalies in coarse ground conditions with low fines.
Geology
Groundwater pressure
Complex, changing geological conditions
Di t
CASE STUDIES.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Diameter
Three and four-lane road tunnels
Multi-purpose tunnels
Support pressure development
S-246 | Hallandsas | Sweden
Convertible Mixshield (Hard
Rock – Slurry)
Diameter: 10,530mm
CHALLENGES IN MECHANIZED TUNNELLING.
GROUNDWATER PRESSURE.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
,
Tunnel length: 2 x 5,500m
Cutterhead power: 4,000kW
Geology: Gneiss,
Amphibolite, Diabase Dykes
Customer: Skanska/Vinci JV
Excavation of hard and abrasive rock mass
Zones of soft soil and mixed face conditions
Potential of high water inflow along the total length of the
THE HALLANDSAS RIDGE.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
along the total length of the tunnel
Static water pressure above 10 bar along the majority of the alignment
Strict environmental (legal) restrictions on water inflow volume
Doc
umen
ts p
édag
ogiq
ues
inte
rnes
au
Mas
tère
TO
S
05.09.2011
10
Open mode with dry primary muck discharge system (TBM conveyor)
Open mode with (cyclic) pre-excavation grouting
THE SOLUTION.
FULL HYBRID TBM FOR DUAL‐MODE OPERATION.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
g g
Open mode with (cyclic) pre-excavation grouting in closed static conditions
Closed mode with hydraulic (slurry) muck discharge system
Test No. 1 Samson unit main drive Hallandsas 14.02.2005
2,00 Bar
4,00 Bar
6,00 Bar
8,00 Bar
10,00 Bar
12,00 Bar
14,00 Bar
16,00 Bar
10:3
7:32
10:3
9:33
10:4
1:34
10:4
3:35
10:4
5:36
10:4
7:37
10:4
9:38
10:5
1:39
10:5
3:40
10:5
5:41
10:5
7:43
10:5
9:44
11:0
1:46
11:0
3:47
11:0
5:48
11:0
7:50
11:0
9:51
11:1
1:52
11:1
3:53
11:1
5:54
11:1
7:55
11:1
9:56
11:2
1:57
11:2
3:58
11:2
5:59
11:2
8:00
11:3
0:01
11:3
2:03
11:3
4:04
11:3
6:05
11:3
8:06
11:4
0:07
11:4
2:08
11:4
4:09
11:4
6:10
11:4
8:11
11:5
0:12
time
pres
sure
(Bar
)
front pressure oil chamber leak chamber gear housing
For up to 13 bar
Original size dynamic shop test up to 15 bar pressure was performed
CUTTERHEAD DRIVE SEAL SYSTEM.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Mid-tunnel breakthrough in the Mölleback Zone at June 8, 2010.
TUNNELLING AT HALLANDSAS: PUSHING THE LIMITS.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Breakthrough 1st tube: August 25, 2010.
TUNNELLING AT HALLANDSAS: PUSHING THE LIMITS.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
CHALLENGES IN MECHANIZED TUNNELLING.
LAKE MEAD | INTAKE NO. 3 | LAS VEGAS.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Sedimentary and volcanic geology
Depth of the tunnel
Potential for high groundwater inflows and high hydrostatic pressures.
CHALLENGES IN MECHANIZED TUNNELLING.
GROUNDWATER PRESSURE.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Doc
umen
ts p
édag
ogiq
ues
inte
rnes
au
Mas
tère
TO
S
05.09.2011
11
LAKE MEAD | INTAKE NO. 3 | LAS VEGAS.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
S-502 Lake Mead, Intake No. 3 | Las Vegas | USA
Dual-Mode TBM - Hard Rock /MixshieldDiameter: 7,180mmTunnel length: 4,800m
Cutterhead power: 2,800kWGeology: Basalt, sandstone, amphibolite, conglomerate Customer: JV VTC (Impregilo S.p.A, S.A. Healy Company)
TBM able to convert rapidly from an open-faced system to a closed pressurized system capable of withstanding potential hydrostatic pressures up to 17 bar maximum.
LAKE MEAD | INTAKE NO. 3. PROFILE OF INTAKE SYSTEM.
CHALLENGE: WATER PRESSURE.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Closed modeOpen mode
Possible drill pattern ahead of the
TBM
Three permanently installed drill rigs
P bi d d illi h d f h
LAKE MEAD | INTAKE NO. 3. PROFILE OF INTAKE SYSTEM.
PROBING AND PRE EXCAVATION GROUTING.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Probing and drilling ahead of the face can be accomplished in open mode and closed mode conditions (blow-out preventer units)
CHALLENGE: COMPLEX GEOLOGY.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Finnetunnel, Germany
Railway tunnel
2 Convertible Mixshield TBMs
closed mode
FINNETUNNEL | GERMANY.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
open mode
Hydro‐Mode Conversion Open‐ModeTBM‐North
Conversion
PROJECT OVERVIEW FINNETUNNEL.SEQUENCES OF TBM TUNNELLING.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Hydro‐Mode ConversionTBM‐South
OPERATION STP (SLURRY TREATMENT PLANT)STP
Doc
umen
ts p
édag
ogiq
ues
inte
rnes
au
Mas
tère
TO
S
05.09.2011
12
Locks Crusher
RECONSTRUCTION CLOSED MODE – OPEN MODE.DISASSEMBLY SLURRY‐SET.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Pipes
CHALLENGE: TUNNELLING UNDER THE VALLEY SCHNECKTAL.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Overburden of only 4.2m
Fissured and brittle stratum at tunnel crown along the section of low overburden
Low strength sediments
Measures to avoid collapse scenario in view of minimal overburden of only 4.5m:
Contractor grouted the rock from the surface to a point just above the tunnel roof via grouting holes
CHALLENGE: TUNNELLING UNDER THE VALLEY SCHNECKTAL.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
holes.
Performance of exploratory drillings and rock improvement measures
Drilled and grouted bolts and/or pipe arch from within the shield
Possibility of drilling through the
CHALLENGE: TUNNELLING UNDER THE VALLEY SCHNECKTAL.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Possibility of drilling through the cutting wheel by means of a drilling platform via drilling ducts in the pressure bulkhead and/or submerged wall.
Possibility of drillings with inclinations of 8-10 degrees.
Performance of exploratory drillings and rock improvement measures
Drilled and grouted bolts and/or pipe arch from within the shield
Possibility of drilling through the
CHALLENGE: TUNNELLING UNDER THE VALLEY SCHNECKTAL.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Possibility of drilling through the cutting wheel by means of a drilling platform via drilling ducts in the pressure bulkhead and/or submerged wall.
Possibility of drillings with inclinations of 8-10 degrees.
Advance performance in open mode limited due to segment production 110 rings/week
S-419: Breakthrough Sept. 09 4 months prior to schedule
S-420: Breakthrough Febr. 10 7 months prior to schedule
ANALYSIS ADVANCE PERFORMANCES, OPEN‐CLOSED MODE.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Doc
umen
ts p
édag
ogiq
ues
inte
rnes
au
Mas
tère
TO
S
05.09.2011
13
SOCATOP, PARIS: ROAD TUNNEL FOR THE A86.
LARGE DIAMETER TUNNEL EXCAVATION IN DENSE URBAN AREA.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
SOCATOP, PARIS: TUNNEL CROSS SECTION.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
DIFFERENT GEOLOGICAL SOIL FORMATIONS ALONG THE TUNNEL
ALIGNMENT. CONVERTIBLE MACHINE PRINCIPLE.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
OpenMode EPB Slurry EPBSlurry
Mixshield Mode
THE CONVERTIBLE MIXSHIELD.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
EPB Mode
SMART, Kuala Lumpur, Malaysia Ø 13.21m, Mixshield
Silberwald, Moscow, RussiaØ 14.20m, Mixshield
Nanjing, ChinaØ 14 93m Mixshield
CHALLENGE: LARGE DIAMETER AND MULTI‐PURPOSE.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Ø 14.93m, Mixshield
M30 Madrid, Spain Ø 15.20m, EPB Shield
Shanghai Changjiang, ChinaØ 15.43m, Mixshield
Galleria Sparvo, ItalyØ 15.55m, EPB Shield
THE SMART IDEA. MULTI‐FUNCTION TUNNEL IN KUALA LUMPUR.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Doc
umen
ts p
édag
ogiq
ues
inte
rnes
au
Mas
tère
TO
S
05.09.2011
14
S-252 and S-253 | SMART | Kuala Lumpur | Malaysia
THE SMART IDEA.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Lumpur | Malaysia
2 MixshieldsShield diameter: 13,210mmTunnel length: 9,350mGeology: Limestone, sand, marbleCustomers: MMCEG-GamudaJV; Wayss+Freytag AG
SMART TUNNEL KUALA LUMPUR. GEOLOGICAL CONDITIONS.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
70 % traverses karstic limestone and sections in compact and fresh marble
30 % traverses quaternary alluvial deposits (silty, gravely sand) and mine tailings
Road tunnel section is marked red
POSSIBLE EXPLOARTION DRILLINGS FOR KARSTIC ZONES THROUGH THE
SHIELD.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
EFFICIENT SOFT GROUND TUNNELLING
WITH ELECTRONIC WEAR DETECTION SYSTEM.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Actual information about cutting tool wear
Economical tool change
Limited damage on steel structure
Guide parameters from interdisciplinary processing of geotechnical, geodetic and machine data
CONTROLLED BORING PROCESS (CBP) ‐ CONTROL FOR MORE SAFETY.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
and machine dataOnline visualization of tunnelling
mac
hine
(PLC
) da
tam
achi
ne(P
LC)
data
geot
echn
ical
data
geot
echn
ical
data
Nav
igat
ion
Nav
igat
ion
Mod
ule
(n)
Mod
ule
(n)
Mod
ule
(n+2
)M
odul
e (n
+2)
TUnIS CBP – TUNNEL AND UNDERGROUND INTEGRATED SOFTWARE STRUCTURE FOR CBP.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
repo
rting
mod
ule
repo
rting
mod
ule
geol
ogy
geol
ogy
desi
gn d
ata
desi
gn d
ata
Mod
ule
(n+1
)M
odul
e (n
+1)
Mod
ule
(n+3
)M
odul
e (n
+3)
TUnIS data base structure with basic functions
Individual implementation of expert modules
Expandable – as and when required
Doc
umen
ts p
édag
ogiq
ues
inte
rnes
au
Mas
tère
TO
S
05.09.2011
15
SMART TUNNEL KUALA LUMPUR.
PERFORMANCES IN METERS PER MONTH.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
S-108 | 4th Tube Elbe Tunnel| Hamburg | Germany
1 Mixshield, Ø14.20mTunnel length: 2,560m
CUTTING WHEEL INTERVENTIONS. SAFETY ASPECTS.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
S-317 and S-318 | Changjiang Under River Tunnel | Shanghai | China
2 Mixshields, Ø15.43mTunnel length: 7,170m each
S-349 and S-350 | Nanjing| China2 Mixshields, Ø14.93mTunnel length: 2,933m each
S-108 | 4th Elbe River Tunnel | Hamburg | Germany
Mixshield
Diameter: 14,200mmTunnel length: 2,650m
Cutterhead power: 3,400kW
G l G l ilt d
4th ELBE RIVER TUNNEL | HAMBURG | GERMANY
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Geology: Gravel, silt, sand,
boulders
Customer: Bilfinger Berger AG, Dyckerhoff & Widman AG,
Heitkamp GmbH, HOCHTIEF AG,
Philipp Holzmann AG, Wayss &
Freytag AG, Ed. Züblin AG
CONNECTION TO THE EXISTING TUNNEL TUBES.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
DEMANDING GEOLOGY UNDER THE ELBE RIVER.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Access to the main arm of the cutting wheel under atmospheric pressure
Operator undertakes maintenance procedure’s
ONE OF THE MAJOR TECHNICAL INNOVATIONS.
CUTTING TOOL CHANGE IN FREE AIR.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
pwithout the risk of having to work at the tunnel face
Back loading cutting tools
Doc
umen
ts p
édag
ogiq
ues
inte
rnes
au
Mas
tère
TO
S
05.09.2011
16
S-317 and S-318 | Changjiang Under River Tunnel | Shanghai | China
2 Mixshields
Shield diameter: 15,430mm
Cutterhead power: 3,500kW
THE WORLD’S LARGEST MIXSHIELDS.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Tunnel length: 7,170m each
Geology: Sand, clay, shell debris
End user: Shanghai ChangjiangTunnel & Bridge Construction Co., Ltd.
ACCESSIBLE CUTTING WHEEL SPOKES FOR TOOL CHANGE IN FREE AIR.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Date of contract: February 8, 2005
Start tunnelling S-317: September 2006 S-318: December 2006
BreakthroughS-317: May 2008
A CHALLENGING TIME SCHEDULE.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
S 317: May 2008S-318: September 2008
In total 75,000 lining segments (16 t each) for 14,340m of tunnel.
Tunnel was opened for the traffic in time for the World Expo 2010.
SHANGHAI, CHINA. BREAKTHROUGH OF THE WORLD‘S LARGEST
MIXSHIELDS 12 AND 10 MONTH EARLIER THAN SCHEDULED.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
S-317May 28, 2008
S-318September 5, 2008
THE WESTERSCHELDE ROAD TUNNEL PROJECT, THE NETHERLANDS.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
GEOLOGY AT WESTERSCHELDE. PRESSURE OF UP TO 7.5 BAR.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Doc
umen
ts p
édag
ogiq
ues
inte
rnes
au
Mas
tère
TO
S
05.09.2011
17
MACHINE FEATURES AGAINST CLOGGING BEHAVIOR.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Pressure chamber system for up to 12 divers and technicians enables divers a long-term stay under pressure
Transport shuttle:
Length: 2,500mm
Diameter: 1,300mm
WORKING IN UP TO 7.5 BAR.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Diver Capacity: 4
BREAKTHROUGH AFTER 6.6 KILOMETERS.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
PERSPECTIVES. SUPPORT PRESSURE DEVELOPMENT.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
SUPPORT PRESSURE DEVELOPMENT. TYPES OF DIVING APPLICATIONS DEPENDING ON REQUIRED FACE SUPPORT PRESSURE.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Atmospheric access to cutting tools
Easy access to information about wear of each cutting tool and steel structure
ACCESSIBLE CUTTING WHEEL. KEY BENEFITS.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Drastic reduction of hyperbaric interventions
Possibility to flange man lock to center
Possibility to increase pressure within the accessible cutting wheel
Doc
umen
ts p
édag
ogiq
ues
inte
rnes
au
Mas
tère
TO
S
05.09.2011
18
EPB‐SHIELD. THROUGH SOFT GROUND WITH EARTH PRESSURE.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
1. Tunnel face2. Cutting wheel
3. Excavation chamber
4. Pressure bulkhead1
8
EARTH PRESSURE BALANCED SHIELD. OPERATIONAL PRINCIPLE.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
5. Thrust cylinders
6. Screw conveyor7. Erector
8. Segment lining23
4
5
6 7
EARTH PRESSURE BALANCED SHIELD. FACE PRESSURE CONTROL.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
GRAVELSANDSILTCLAY
coarsemediumfinecoarsemediumfinecoarsemediumfine
ng[%
]
60
70
80
90
100
EPB
tency, foam for stickiness
ure
GRAVELSANDSILTCLAY
coarsemediumfinecoarsemediumfinecoarsemediumfine
ng[%
]
60
70
80
90
100
GRAVELSANDSILTCLAY
coarsemediumfinecoarsemediumfinecoarsemediumfine
GRAVELSANDSILTCLAY
coarsemediumfinecoarsemediumfinecoarsemediumfine
ng[%
]
60
70
80
90
100
EPB
tency, foam for stickiness
tency, foam for stickiness
ureure
APPLICATION RANGE: EPB SHIELD.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Perc
entP
assi
n
Particle Size [mm]
0
10
20
30
60 10020620,60,20,060,020,0060,002
40
50
60
1Water fo
r consisten
2Foam
3Foam + Polymers, water pressure < 2 bar
4Foam + Polymers + fines, no water pressure
Perc
entP
assi
n
Particle Size [mm]
0
10
20
30
60 10020620,60,20,060,020,0060,002
40
50
60
Perc
entP
assi
n
Particle Size [mm]
0
10
20
30
60 10020620,60,20,060,020,0060,002
40
50
60
1Water fo
r consisten
1Water fo
r consisten
2Foam
2Foam
3Foam + Polymers, water pressure < 2 bar
3Foam + Polymers, water pressure < 2 bar
4Foam + Polymers + fines, no water pressure
4Foam + Polymers + fines, no water pressure
Closed Mode Semi open mode or Compressed Air Mode
EPB OPERATION MODES.
CLOSED MODE, SEMI OPEN MODE, OPEN MODE.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Open Mode
To be useable as support medium, the soil has to fulfil following requirements:
Capability to extrude.Cohesive and plastic.
EPB‐SHIELD. SOIL REQUIREMENTS.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Soft to stiff consistency.Lower inner angle of friction.Low water permeability.Good elasticity.
Doc
umen
ts p
édag
ogiq
ues
inte
rnes
au
Mas
tère
TO
S
05.09.2011
19
If the soil requirements are not existing, the soil has to be conditioned. The conditioning is dependent on following soil parameters:
Grain size distribution.
EPB‐SHIELD. CHOICE OF CONDITIONING.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Water content, w (%).Liquid limit, wL (%).Plasticity Index, IP andConsistency Index, IC.
Bentonite.Water.Polymers.Foam.
EPB‐SHIELD. INJECTION MATERIAL.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
The initial state of the soil should be kept unchanged as possible; the consistency of the soil should guarantee the transport to the disposal site and should be economical.
Three main areas of conditioning:
Porous, non-cohesive soil: Conditioning required to get a plastic material to achieve a reliable earth pressure build-up in the working chamber.
EARTH PRESSURE BALANCED SHIELD. APPLICATION RANGE AND NEED FOR CONDITIONING.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Silty sands: Conditioning shows positive effects regarding the reduction of abrasion and the reduction of the torque. This enables higher advancement speed of the TBM.
Clay: Conditioning required to reduce clogging and adhesion problems
EPB‐SHIELD. FOAM INJECTION POINTS.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
EPB‐SHIELD. STATORS FOR MIXING AND CONDITIONING OF EXCAVATED MATERIAL.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Stators for mixing excavated material
Low density.Optimum mixing with soil.Reduction of internal friction.Reduction of cutting wheel torque.Reduce soil adhesion to metal of
ADVANTAGES OF CONDITIONING. SOFT GROUND.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
shield/ cutting wheel.Reduce soil permeability.Reduction of wear.Higher temporary face stability.
Doc
umen
ts p
édag
ogiq
ues
inte
rnes
au
Mas
tère
TO
S
05.09.2011
20
CONDITIONING OF SOFT SOIL WITH FOAM.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Low cohesive sand
Short-term cohesion via foam
Reduction of dust.Reduction of blocked disc cutters, clean disc and faster tool change possible.Greater cooling effect with foam than with water.Lower wear, abrasion.Lower torque.
ADVANTAGES OF CONDITIONING. HARD ROCK.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Foam for structuring
BARCELONA, SPAIN: SAFE INNERCITY TUNNELLING WITH LARGE
DIAMETER TBMs IN VARIABLE SOILS.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Gorg
BARCELONA, SPAIN.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
S-221 | Metro Line 9 | Barcelona |
Spain
EPB Shield
Shield diameter: 12,060mm
Cutterhead power: 4 000kW
BARCELONA, SPAIN.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Cutterhead power: 4,000kW
Tunnel length: 8,500m
Geology: Granodiorite, Sand,
Clay, Gravel
Customer: Dragados, Necso,
ACS, Comsa, Sorigue
Tunnel profile for a double-deck metro tunnel (with platform in the station area)
Sensible structure with density f b ildi
BARCELONA: RISK CONTROL WITH LARGE DIAMETER TBMs, DENSITY OF
DEVELOPMENT, VARIABLE SOILS.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
of buildings
Variable, geological conditions: Soft and hard rock, boulders, groundwater
High abrasivity due to variable geology
Doc
umen
ts p
édag
ogiq
ues
inte
rnes
au
Mas
tère
TO
S
05.09.2011
21
MIXED TUNNEL FACE CONDITIONS. SOFT AND HARD ROCK AT TUNNEL
FACE IN BARCELONA.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
60 METERS / 40 RINGS PER DAY.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
S-300 | Road Tunnel M30 | Madrid | Spain
EBP ShieldDiameter: 15,200mmTunnel length: 3,600mCutterhead power:
ONE OF THE WORLD‘S LARGEST EPB SHIELD.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Cutterhead power: 12,000kW + 2,000kWGeology: Clay, gypsumCustomer: FerrovialAgroman, S.A., AccionaInfrastructuras
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Required cutting wheel drive torque of 125,000,000Nm
Limitation of the shield roll due to the high installed torque
Agitating of the excavated
REQUIRED MACHINE CHARACTERISTICS.
material in order to prevent clogging in the centre area
Excavation and conditioning of 363m³ for an advance of 2m at a maximum speed of 65mm/min
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Two independent drive units allowing counter clockwise rotation
32 foam generators with a max capacity of 700m³/h
Three screw conveyors with a
THE MACHINE DESIGN.
Three screw conveyors with a capacity of 2x900m³/h and 1x250m³/h
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Doc
umen
ts p
édag
ogiq
ues
inte
rnes
au
Mas
tère
TO
S
05.09.2011
22
MUCK CONTOL. BELT WEIGHING SYSTEM.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
LASER SCANNER FOR MUCK CONTROL.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
3 vessels on the Rhine River to Rotterdam
1 vessel Rotterdam – Alicante
1 vessel Rotterdam - Bilbao
102 t k di tl G
FROM SCHWANAU TO MADRID IN 3 MONTHS.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
102 trucks directly Germany -Madrid
Reassembly of equipment on jobsite 24h/7 days within 12 weeks
Completion of the advance in 8.5 months, 3.5 months
Cycle times for excavation of 2m length incl. ring erection
SPEED TUNNELLING IN MADRID.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
0
100
200
300
400
500
50 100
150
200
250
300
350
400
450
500
550
600
650
700
750
800
850
900
950
1000
1050
1100
1150
1200
1250Ring
Zeit
Feb. 2, 2005Beginning of w
orkshop assembly
March 23, 2007
Inauguration
June 2, 2004M
achine ordered at H
errenknecht
June 6, 2005W
orkshop acceptance
Nov. 5, 2005
Start of Tunnelling
July 17, 2006Breakthrough
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
2005 2006 2007
EUROPE. ITALY. GALERIA SPARVO.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
2 parallel road tunnels, each with 3 lanes
Extending the highway between Bologna and Florence
Challenge: Large diameter and geological conditions
Doc
umen
ts p
édag
ogiq
ues
inte
rnes
au
Mas
tère
TO
S
05.09.2011
23
Galeria Sparvo | Italy
EPB Shield Ø:Cutterhead power: Tunnel length:
d
15,550mm
12,000kW 2 x 2,500m
THE WORLD‘S LARGEST TUNNEL BORING MACHINE.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
End user: Joint venture of Toto CostruzioniGenerali, Vianini Lavoriand Profacta
S-441 | Escalator Shaft | St. Petersburg | Russia
EPB ShieldDiameter: 10,690mmCutterhead power: 1,200kW
Tunnel length: 120mGeology: Soft and hard clayCustomer: OAO Metrostroy
S‐441 |ESCALATOR SHAFT | ST. PETERSBURG | RUSSIA.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
30°
S‐441 |ESCALATOR SHAFT | ST. PETERSBURG | RUSSIA.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
S‐512 AND S‐514 | BRISBANE AIRPORT LINK | BRISBANE | AUSTRALIA.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
S-512 and S-514 | Brisbane Airport Link | Brisbane | Australia
2 EPB ShieldsDiameter: 12,450mmTunnel length: 2,422m each
Geology: Brisbane tuff, weathered zonesCustomer: Thiess Pty. Ltd., John Holland Engineering Pty. Ltd.
Double Gripper-TBM:S-96 TBM 3000, ∅ 3.00m
Single Gripper-TBM:S-155 Tscharner, ∅ 9.53m
HARD ROCK TBMs.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Double Shield-TBM:S-153 La Réunion, ∅ 3.80m
Shielded-TBM with articulation joint:S-163 Sörenberg, ∅ 4.56m
CUTTERHEAD. EXCAVATION AND MUCKING.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Doc
umen
ts p
édag
ogiq
ues
inte
rnes
au
Mas
tère
TO
S
05.09.2011
24
HARD ROCK CUTTING PROCESS.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
HARD ROCK TBM. DISC CUTTERS.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
center disc cutter
single ring disc cutters
double ring disc cutters
DiscSteel structure cutterhead
Bearing housing
HARD ROCK TBM. CUTTERHEAD DESIGN. HOUSING.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Spacing
HARD ROCK TBM. CUTTING PROCESS. CHIPPING.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Spacing
Spacing influences:
• Number of disc cutters
• Chip size
• Loads on cutters
Loads on cutterhead
HARD ROCK TBM. CUTTING PROCESS. CHIPPING.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
• Loads on cutterhead
• Penetration
• Wear behavior disc cutter
HARD ROCK TBM. CUTTERHEAD DESIGN.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
The cutterhead fulfills following functions:• Carrier of disc cutters
• Pick up of material at the tunnel face
• Supporting the tunnel face in case of falling rock
Doc
umen
ts p
édag
ogiq
ues
inte
rnes
au
Mas
tère
TO
S
05.09.2011
25
Backloading cutters
Higher Cutterloads
Larger Diameters
HARD ROCK EXCAVATION.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Cutterhousing & Structure
Buckets
Cutter Handling
A1B1
D1C1
A1A2
B1
B2
C1
CUTTER GROUP ARRANGEMENT.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
C2D2
A2 B2
C2
D1
D2
CUTTER HANDLING.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
CUTTERHEAD DETAILS.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
CUTTERHEAD ACCESS.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
CUTTER HANDLING.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Doc
umen
ts p
édag
ogiq
ues
inte
rnes
au
Mas
tère
TO
S
05.09.2011
26
BACKLOADING CUTTERHEAD. CUTTER EXCHANGE.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
SINGLE SHIELDED HARD ROCK TBM.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
SINGLE SHIELDED HARD ROCK TBMs.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Perschling, Austria. ∅12.98m
Wienerwald, Austria.∅10.695m
Islisberg, Switzerland. ∅11.805m
“Swiss system”: double lining
SINGLE SHIELD TBM. THRUST RING.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Double-shell Single-shell
TUNNEL LINING SYSTEM FOR TBM USE.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
[Girmscheid 2000]
High quality of the precast segmentsHigh load capacity shortly after ring erectionEasy detection of leakages and easy repair work
ADVANTAGES OF THE SINGLE SHELL SEGMENT LINING.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Lower costs than for a double shell lining (no inner lining)Real loads on inner lining are not clear
Doc
umen
ts p
édag
ogiq
ues
inte
rnes
au
Mas
tère
TO
S
05.09.2011
27
Necessary for:
Water tunnels (fresh water, headrace tunnels and sewers) with high requirements for water tightness
Water tunnels with high water pressure
DOUBLE SHELL LINING WITH SEGMENTS AND IN SITU CAST INNER LINING.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Water tunnels with high water pressure
Tunnels for the transport of dangerous materials (f.i. nuclear fluids) to protect the sealing
Special loads
Swing support roller
SINGLE SHIELD TBM. THRUST RING.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Thrust ring
Withdrawal of the thrust ring and placing of the bottom segments.
Placing of the left and right tunnel
Spreading of the bottom segments and placing of the key stone.
Pushing forward
SINGLE SHIELD TBM. THRUST RING.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
and right tunnel side wall segments.
Placing of the crown segment
Pushing forward of the thrust ring and pea gravel injection in the annular gap.
S-56 | N 3 Bözberg, Aarau | Switzerland
Single Shield Hard Rock TBM
Diameter: 11,800mm
FIRST LARGE DIAMETER IN HARD ROCK.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Tunnel length: 2x 3,200m
S-60 Single Shield Hard Rock TBM
Diameter 11,740mm
Tunnel length: 3,550m
Road Tunnel
SWITZERLAND: TUNNEL DU MONT RUSSELIN.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
S-287 Single Shield Hard Rock TBM
Diameter 9,900mm
Tunnel length 7,650+ 2,750m
PAJARES.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
S-281 Double Shield
Diameter 10,160mm
Tunnel length 10,700+ 3,700m
Doc
umen
ts p
édag
ogiq
ues
inte
rnes
au
Mas
tère
TO
S
05.09.2011
28
DOUBLE SHIELD TECHNOLOGY FOR HARD ROCK TUNNELLING.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
S-201/202 Double Shield TBM
Diameter 9,510mm
Tunnel length 14,292 + 14,428m
GUADARRAMA.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
S-373 | Cabrera | Spain
Double Shield TBM
Diameter: 9,690mm
Tunnel length: 2 x 6,200m
Geology: Limestone
S‐373 | CABRERA| SPAIN.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Geology: Limestone
Client: FCC Construcción S.A.; ConstruccionesSanchez Dominguez-Sando S.A.
Daily best performance: 105.6m / 66 rings
Weekly best performance: 435m / 290 rings
HIGH SPEED TUNNELLING IN SPAIN. S‐373 CABRERA.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Monthly best performance: 1688m / 1055 rings
NORTH‐SOUTH BYPASS TUNNEL. BRISBANE.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
S-375 and S-376 | North-South Bypass Tunnel | Brisbane | Australia
2 Double Shield TBMsDiameter: 12,340mmTunnel length: 3,997m + 3,932m
Geology: Welded tuff, Arenites, Phyllites with quartz veins, faulted rockCustomer: Baulderstone Hornibrook; Bilfinger Berger AG; Leighton Contractors
NORTH‐SOUTH BYPASS TUNNEL. BRISBANE.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Doc
umen
ts p
édag
ogiq
ues
inte
rnes
au
Mas
tère
TO
S
05.09.2011
29
APRIL 16, 2009.
BREAKTHROUGH S-376 FLORENCE IN WOOLLOONGABBA.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
GRIPPER TECHNOLOGY FOR HARD ROCK TUNNELLING.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
GRIPPER TBM. TUNNEL SUPPORT IN WORKING AREA L1.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Anchoring and steel arching
GRIPPER TBM. TUNNEL SUPPORT IN WORKING AREA L1.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
GRIPPER TBM. TUNNEL SUPPORT IN WORKING AREA L1.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Fix installed probe drilling unit Pivot anchor / injection drilling unit
AnchoringExploratory drilling
GRIPPER TBM. TUNNEL SUPPORT IN WORKING AREA L1.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Doc
umen
ts p
édag
ogiq
ues
inte
rnes
au
Mas
tère
TO
S
05.09.2011
30
GRIPPER TBM. TUNNEL SUPPORT IN WORKING AREA L1.
WIRE MESH ERECTOR.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
WIRE MESH ERECTOR.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
AUTOMATIC SHOTCRETE ROBOT L2.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
ROCK SAFETY CONCEPT.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
2000: S-167 Steg and S-174 Raron
9,430mm diameter, 18,850m tunnel in total
In operation since 2007
LÖTSCHBERG BASE TUNNEL.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
85km of mechanized tunnelling in total
Up to approx. 2,500m overburden
Tectonically active massif (alps folding)
GOTTHARD BASE TUNNEL.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Doc
umen
ts p
édag
ogiq
ues
inte
rnes
au
Mas
tère
TO
S
05.09.2011
31
Bodio – Faido / Faido – Sedrun
2 Gripper TBMDiameter: 8,830mm (9,430mm)Cutterhead power: 3,500kWTunnel length: 49,839mCostomer: Consorzio TAT (Implenia Industrial Construction, Alpine Bau GmbH, CSC ImpresaCostruzioni SA Hochtief AG Impregilo SpA)
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Costruzioni SA, Hochtief AG, Impregilo SpA)
Amsteg – Sedrun / Erstfeld - Amsteg
2 Gripper TBMDiameter: 9,580 mmCutterhead power: 3,500kWTunnel length: 35,687mCustomer: AGN (STRABAG AG TunnelbauSchweiz (CH)/ STRABAG AG (A) )
The difference between the geologic prediction and the findings is great.The rock conditions have proven to be less favorable than expected.The relevance in terms of construction can change very quickly.
GOTTHARD BASE TUNNEL. CHALLENGES.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Strain redistributions can occur over 3x the excavation diameter in fault zones and zones with low rock strength.The tunnelling systems used are capable of mastering significantly more difficult situations than originally thought.
Enlargement of cutterhead (incl. diameter relevant parts) from 8.8m to 9.4m in respect of expected convergences and more intensive support measures.
Shifting of cutters to enlarge the cutterhead diameter to 9.5m.
Spiral arrangement of cutters.
MODIFICATIONS DUE TO EXPERIENCES MADE DURING
EXCAVATION OF SECTION BODIO.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
p g
Increase number of cutters and buckets
Reinforcement of cutterhead shield and dust shield
Replacement main drive
Revision of motors, gear, hydraulic cylinders
Increasing the back-up by three wagons
S-575 | Linth Limmern | Switzerland
Gripper-TBMDiameter: 5,200mmTunnel length: 2 x 1,000m
40° INCLINE TUNNEL FOR HYDROELECTRIC POWER.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Cutterhead power: 2,205kWGeology: limestoneIncline: 85% 40°Customer: Marti Tunnelbau
S‐575 LINTH LIMMERN, SWITZERLAND.
40° INCLINE FOR HYDROELECTRIC POWER.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
More complex challenges in terms of construction ground and logistics
Gotthard Base Tunnel (high rock overburden, fault zones, squeezing rock conditions), M30 Madrid (inner city tunnelling with Ø15.20m)
TENDENCIES IN MECHANIZED TUNNELLING.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
Long tunnel drives with larger diameters under high groundwater pressure
Gotthard Base Tunnel (2x57km), Shanghai (Ø15.43m), Lake Mead (17bar)
Demand for well-engineered technology to produce high-capacity infrastructure systems.
Doc
umen
ts p
édag
ogiq
ues
inte
rnes
au
Mas
tère
TO
S
05.09.2011
32
Escalators shafts
Tunnel renovation:
- Road Tunnels
- Railway tunnels
PERSPECTIVES. INNOVATIVE DIRECTIONS.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
VSM – Vertical Shaft Sinking
- Offshore
- U-Park
SBS – Shaft Boring System
Now and in the future: Demand for high-efficient infrastructure
Push for innovations:
- Safety, cost effectiveness, efficiency, integrated package solutions
T h i l l ti f h ll
PERSPECTIVES.
INSA Lyon ‐ ENTPE MS TUNNELS ET OUVRAGES SOUTERRAINS 2011‐2012
- Technical solutions for every challenge
Large scale infrastructure schemes to benefit from economic stimulus plans
Teamwork Tunnelling to guarantee best possible project success: project owners, planers/ consultants, constructors, machine suppliers)
THANK YOU FOR YOUR ATTENTION.