1 H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G Werner Glatz. Member of the Executive Board Traffic Tunnelling. Investorenkonferenz Irak, München, November 7, 2009. HERRENKNECHT AG. DRILLING TOGETHER FOR PROGRESS. H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G GLOBAL TRENDS. Population growth and urbanization New high-capacity infrastructures to keep people, goods and resources on the move Longer and deep grounded tunnels in all kinds of geologies for every traffic and utility tunnel Huge diameter multi-purpose tunnels Large scale infrastructure schemes with many simultaneous sub-projects Tunnels for megacities High-speed trains, hydropower, irrigation, sewage

HERRENKNECHT AG. DRILLING TOGETHER FOR PROGRESS

  • Upload
    others

  • View
    21

  • Download
    0

Embed Size (px)

Citation preview

Page 1: HERRENKNECHT AG. DRILLING TOGETHER FOR PROGRESS

1

H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G

Werner Glatz. Member of the Executive Board Traffic Tunnelling.Investorenkonferenz Irak, München, November 7, 2009.

HERRENKNECHT AG.

DRILLING TOGETHER FOR PROGRESS.

H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G

GLOBAL TRENDS.

Population growth and urbanization

New high-capacity infrastructures to keep people, goods and resources on the move

Longer and deep grounded tunnels in all kinds of geologies for every traffic and utility tunnel

Huge diameter multi-purpose tunnels

Large scale infrastructure schemes with many simultaneous sub-projects

Tunnels for megacities

High-speed trains, hydropower, irrigation, sewage

Page 2: HERRENKNECHT AG. DRILLING TOGETHER FOR PROGRESS

2

H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G

PRODUCT RANGE.

H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G

HERRENKNECHT IN SCHWANAU.

Page 3: HERRENKNECHT AG. DRILLING TOGETHER FOR PROGRESS

3

H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G

USA

VENEZUELA

SPAINFRANCE

NETHERLANDSUK UKRAINE

RUSSIA

ITALY

THAILAND

CHINA

AUSTRALIA

MALAYSIASINGAPORE

SUBSIDIARIES

REPRESENTATIVES

INDIA

IRAN

DUBAI

GERMANYSWITZERLAND

CANADA

MEXICO

BRAZIL

SAUDI ARABIA

CHILE

HERRENKNECHT IN THE WORLD.

H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G

Page 4: HERRENKNECHT AG. DRILLING TOGETHER FOR PROGRESS

4

H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G

HERRENKNECHT GROUP.

459

594680

874

1013

0

200

400

600

800

1000

1200

2004 2005 2006 2007 2008

Total operatingperformance inMio. EUR

15181665

1849

2915

2345

0

500

1000

1500

2000

2500

3000

3500

2004 2005 2006 2007 2008

Employeesaverage peryear

112105 101

121

157

0

20

40

60

80

100

120

140

160

180

2004 2005 2006 2007 2008

Trainees average per year

H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G

UTILITY TUNNELLING.FOR ALL KINDS OF PIPE DIMENSIONS.

Page 5: HERRENKNECHT AG. DRILLING TOGETHER FOR PROGRESS

5

H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G

TOURING THE WORLD FOR UTILITY TUNNELLING.

Linden, USA Berlin Cairo Jeddah

Moscowand Bogota

Mumbai

New Zealand

H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G

LARGE DIAMETER TUNNELLING SYSTEMS.

Page 6: HERRENKNECHT AG. DRILLING TOGETHER FOR PROGRESS

6

H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G

4th RIVER ELBE TUNNEL.

H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G

Cutterhead power: 12,000 + 2,000kWTorque: 125,268kNmCustomer: Ferrovial Agromán, S.A.; NECSO Entrecanales Cubiertas, S.A.

EPB Shield

Diameter: 15,200mm

Tunnel length: 3,650m

S-300 | M-30 | Madrid | Spain

Page 7: HERRENKNECHT AG. DRILLING TOGETHER FOR PROGRESS

7

H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G

GROWTH MARKET NORTH AN SOUTH AMERICA.

Arrowhead

Atlanta

Los Angeles

New York

Portland

Caracas

Mexico City

Sao Paulo

H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G

2 Mixshields

Diameter: 15,430mm

Tunnel length: 7,470m

Customer: Shanghai ChangjiangTunnel & Bridge Construction Co.,Ltd.

S-317 and S-318 | Changjiang Under River

Tunnel | Shanghai | China

Page 8: HERRENKNECHT AG. DRILLING TOGETHER FOR PROGRESS

8

H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G

2 Gripper TBMDiameter: 8,830mm (9,430mm)Cutterhead power: 3,500kwTunnel length: 25,000mCustomer: Consorzio TAT (Implenia Bau AG; CSC Impresa Costruzioni SA; Impregilo S.p.A.; Alpine Mayreder Bau GmbH; Hochtief Construction AG)

S-210 and S-211 | Gotthard Base Tunnel | Switzerland

2 Gripper TBMDiameter: 9,580mmCutterhead power: 3,500kwTunnel length: 11,300mCustomer: AGN (Murer/Strabag AG; STRABAG AG)

S-229 and S-230 | Gotthard Base Tunnel | Switzerland

H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G

4 HERRENKNECHT GRIPPER TBM

FOR THE WORLD‘S LONGEST RAILWY TUNNEL.

Page 9: HERRENKNECHT AG. DRILLING TOGETHER FOR PROGRESS

9

H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G

HERRENKNECHT IN THE NEAR AND MIDDLE EAST.

ÄgyptenSaudi-Arabien

Iran

IndienVEA

Kuwait

Libanon

H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G

WATER AND SEWAGE TUNNELS IN BAGHDAD.

1982: 2 km of water tunnel

East Baghdad Sewage Main Trunk

Tunnelling since 2008

EPB2000TB

Page 10: HERRENKNECHT AG. DRILLING TOGETHER FOR PROGRESS

10

H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G

BAGHDAD METRO.

H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G

THANK YOU FOR YOUR ATTENTION.