The Greek Muon Chambers (BIS) The three Greek Laboratories: 112 (90 BIS30 +22 BIS36) chambers ALL CHAMBERS @CERN since Sept 04 University of Athens (UoA) Tube wiring/assembly (30,000 tubes finished Dec.2003) National Technical University of Athens(NTUA) Quality Assurance/Quality Control of tubes (30,000 tubes finished Mar.2004) University of Thessaloniki (AUTh) Chamber assembly (112 chambers finished April 2004)

The Greek Muon Chambers (BIS)

  • Upload
    amandla

  • View
    46

  • Download
    1

Embed Size (px)

DESCRIPTION

The Greek Muon Chambers (BIS). The three Greek Laboratories: 112 (90 BIS30 +22 BIS36 ) chambers ALL CHAMBERS @CERN since Sept 04. • University of Athens (UoA) Tube wiring/assembly (30,000 tubes finished Dec.2003 ) • National Technical University of Athens(NTUA) - PowerPoint PPT Presentation

Citation preview

Page 1: The Greek Muon Chambers (BIS)

The Greek Muon Chambers (BIS)

The three Greek Laboratories:

112 (90 BIS30 +22 BIS36) chambers

ALL CHAMBERS @CERN since Sept 04• University of Athens (UoA) Tube wiring/assembly (30,000 tubes finished Dec.2003)

• National Technical University of Athens(NTUA) Quality Assurance/Quality Control of tubes (30,000 tubes finished

Mar.2004)

• University of Thessaloniki (AUTh) Chamber assembly (112 chambers finished April 2004)

Page 2: The Greek Muon Chambers (BIS)

The Greek ATLAS Muon Collaborating institutes

UoA• C. Kourkoumelis• P. Ioannou• D. Fassouliotis• I. Hatziantonaki• K. Nikolopoulos• D. Pappas

NTUA• M. Dris• A. Filippas• E. Gazis• T. Alexopoulos• E. Katsoufis• T. Papadopoulou• E. Fokitis• Y. Tsipolitis • S. Maltezos• A. Tzamarioudaki• P. Savva

AUTh• Ch. Petridou• T. Liolios• M. Manolopoulou  • S. Dedousis• M. Chardalas• D. Sampsonidis• T. Lagouri• K. Ypsilantis   • A. Krepouri• C. Lamboudis• K. Economou • K. Filippousis  

Page 3: The Greek Muon Chambers (BIS)

…providing the servicesthe procedure

Preparation activities home(gas bars, cables +29 chambers at Thessaloniki) FINISHED summer 2004

Stage 1 (Blg 184 :equip with gas bars, FC’s, HH’s+MECCA test

78 chambers at CERN, test for gas leak OK)STARTED March 2004 - FINISHED Sept 2004 (but 7 chambers)

Stage 2 NOW HALF_FINISHED Electronic Noise test NOW

Cosmic Ray test NOW

Database NOW

Page 4: The Greek Muon Chambers (BIS)

Blg 283 (ALL 112 CHAMBERS) Test facilities shared with BIL team

Page 5: The Greek Muon Chambers (BIS)

Stage 2 (Bldg:283 started Oct 2004 after gas leak test)

Equip chambers with:

gas supply brass tubes, plugs, valves etcMezzanines boards +FC coversalignment platforms + cables + measure themHV and readout cables (stiff cables/support!!)B field platforms +cablesT sensor cablesProtective covers

A team of 2 technicians working on them since Oct Since Dec. 3 technicians + ½ physicist (since Jan.)

FINISHED 56 C

HAMBERS

RATE IS : 4 min to 5 max chambers/week Expect to fin

ish by

Easter

(Gre

ek)

Page 6: The Greek Muon Chambers (BIS)

…providing the servicesStage II-Blg 283 (ALL CHAMBERS)

Noise test/ Cosmic Ray Test (10 chambers before Xmas+restarted last week)

Data base

A team of 1 physicist –S.Vlachos (since Jan.) +½ physicist (Ph.D.student) (from March)

Leak test/certification

Page 7: The Greek Muon Chambers (BIS)

CONCLUSIONS …providing the services+commissioning the

chambers

Stage I- Blg 184 Finished 6 months ago

(but 7 chambers are still bare)Stage II-Blg 283 (ALL CHAMBERS)

Half are fully equipped, rest by May Integration has just restarted MAIN EFFORT NOW Expect to finish by July