Upload
vohanh
View
213
Download
0
Embed Size (px)
Citation preview
The upgrade program of the LHCb experiment at the Large Hadron
Collider Rudolf Oldeman
INFN Sezione di Cagliari and Università di Cagliari
On behalf of the LHCb collaboraCon
27/9/2013 XCIX Congresso Nazionale della SIF -‐ Trieste 1
The Large Hadron Collider
27/9/2013 XCIX Congresso Nazionale della SIF -‐ Trieste 2
Collides protons on protons head-‐on with Ecm=8 TeV every 50ns (13 TeV, 25ns in 2015)
The LHCb experiment
27/9/2013 XCIX Congresso Nazionale della SIF -‐ Trieste 3
~1/100 pp collisions produces b hadron decays in few ps (~few mm)
Cherenkov detectors
Tracking
calorimeters
~600 physicists from ~20 countries
muon detector
performance parameters: * 2<η<5 * σPV,xy~10μm * Δp/p 0.4%-‐0.6% * P(h→μ)~1%
LHCb trigger and readout • Maximum readout rate: 1MHz • Hardware trigger requires high-‐E µ or h
• ~90% eff for B→µ+µ-(X) • ~30% eff for B→hadrons • ~10% eff for charm
• full reconstrucCon @1MHz in 30k CPU ‘farm’ • pp bunch crossing every 50 ns (25ns in 2015) • with ~2 collisions each
– kept constant though luminosity levelling – achieved by displacing beams at coll. point
• ‘opCmum’ L=4x1032cm-‐2s-‐1 – rise in trigger threshold would overshadow gains
27/9/2013 XCIX Congresso Nazionale della SIF -‐ Trieste 4
LHCb highlights from 2011-‐2012 data
27/9/2013 XCIX Congresso Nazionale della SIF -‐ Trieste
5
• Strong evidence for Bs→µ+µ- decays arXiv:1307.5024
• CP-‐violaCng phase
LHCb-‐CONF-‐2013-‐006
• ObservaCon of D0 mixing PRL 110, 101802(2013)
• and 135 other published results... – See talks of S Perazzini, L. Anderlini, A.A.Alves Jr., M Zangoli and S. Amerio at this conference
Timeline
• 2011: 1p-‐1 at Ecm=7TeV, 50ns b-‐b • 2012: 2p-‐1 at Ecm=8TeV, 50ns b-‐b • 2013-‐2014: LS1 (first long shutdown) • 2015-‐2017: 5p-‐1 at Ecm=13TeV 25ns b-‐b • 2018: LS2 INSTALL LHCb UPGRADE • 2019-‐2021: 15p-‐1 • 2022-‐2023: LS3 (third long shutdown) • 2024-‐??: 10p-‐1 per year
27/9/2013 XCIX Congresso Nazionale della SIF -‐ Trieste 6
LHCb upgrade requirements
• instantaneous luminosity (1-‐2)x1033cm-‐2s-‐1 – on average 5 collisions per bunch crossing – integrated luminosity 50p-‐1
• full detector readout at every bunch crossing – to cope with higher luminosity – doubles B-‐>hadron efficiency
27/9/2013 XCIX Congresso Nazionale della SIF -‐ Trieste 7
Challenges • Fine segmentaCon
– to cope with <n>=5 • RadiaCon hardness
– 50p-‐1 • Low mass
– equal to or less then current • Fast readout
– 40MHz • Tremendous dataflow
– 40Tb/s • Complex networking for event building
– 12k fibers to 50k CPU • CompuCng power
– full event reconstrucCon @ 1-‐40MHz
27/9/2013 XCIX Congresso Nazionale della SIF -‐ Trieste 8
The LHCb upgrade
27/9/2013 XCIX Congresso Nazionale della SIF -‐ Trieste 9
kept parCally kept replaced removed
VELO upgrade: strips -‐> pixels 55x55µm, 40Mpixel Thin (200µm) sensor, ASIC 26 layers, 0.8%X0 each micro-‐channel CO2 cooling -‐20oC RF foil thinner: 300-‐>150µm, Si closer to beam: 8-‐>5.2mm
27/9/2013 XCIX Congresso Nazionale della SIF -‐ Trieste 10
The upstream tracker (UT)
• To replace the present TT – large-‐area tracking upstream of dipole magnet
– long lever arm improves dp/p – Crucial for Ks→π+π-‐, Λ→pπ-‐
• Keep 4 layers (0o,+5o,-‐5o,0o) • Thin (250µm) sensors, -‐5oC • Challenge for material budget <5%X0 • smaller pitch, length near center • Inner sensors circular cut
27/9/2013 XCIX Congresso Nazionale della SIF -‐ Trieste 11
Downstream tracking
• 3x4 planes 5x6m2
• present: IT(Si)+OT 4mm tubes (50ns dri{ Cme) • Too high mulCplicity for upgrade condiCons • Two opCons under consideraCon: – more silicon, shorter tubes – parCal or complete replacement with fiber tracker
27/9/2013 XCIX Congresso Nazionale della SIF -‐ Trieste 12
larger IT opCon
27/9/2013 XCIX Congresso Nazionale della SIF -‐ Trieste 13
• Increase fracCon of surface covered by Silicon • remake part of OT with shorter straws
ultra light-‐weight support structure
present half IT
half IT in upgrade
ScinCllaCng fiber opCon now baseline op<on
• 5-‐layer 250µm fibers. – 2.5m long, mirrored ends – 8000km to cover 12x (5x6m2)
• SiPM (1100x250µm) readout @ -‐50oC
27/9/2013 XCIX Congresso Nazionale della SIF -‐ Trieste 14
Ring Imaging Cherenkov detectors RICH1 aerogel+C4F10 RICH2 CF4
• Present: Hybrid photodetectors – silicon pixel inside image intensifier – pixel readout <=1MHz – need replacement
• New choice: ‘classic’ 8x8 MulC-‐Anode PMTs – square shape-‐>be|er surface packing than
cylindrical hybrids
• Remove aerogel from RICH1 • Increase radius of mirrors 2.7→3.8m
– both reduce occupancy • In LS3: TOF (TORCH) system behind RICH2 to
recover low-‐p PID?
27/9/2013 XCIX Congresso Nazionale della SIF -‐ Trieste 15
Calorimeter
• remove two ‘thin’ detectors in front of ECAL – ScinCllaCng pad detector, SPD – preshower, PRS
• not needed in 40MHz readout • reduce PMT HV to reduce ageing – 5x gain reducCon
• New low-‐noise high-‐gain frontend with 40MHz readout
• replace some inner modules in LS3
27/9/2013 XCIX Congresso Nazionale della SIF -‐ Trieste 16
Muon system
• Remove pre-‐CALO staCon M1 – was only used for trigger
• New off-‐detector electronics for 40HMz readout
• Replace some inner modules at LS3
27/9/2013 XCIX Congresso Nazionale della SIF -‐ Trieste 17
Readout&trigger
• ~12k opCcal fibers with 3.2Gb/s each • Straight to the surface – present LHCb has most electronics in cavern
• Common readout board • Full event reconstrucCon in farm • IniCally, farm won’t be able to handle 40MHz • Use exisCng hardware trigger (L0) as rate limiter (LLT) 10-‐40MHz
• Allow 20kHz to ‘tape’
27/9/2013 XCIX Congresso Nazionale della SIF -‐ Trieste 18
Physics prospects
27/9/2013 XCIX Congresso Nazionale della SIF -‐ Trieste 19
Many key measurements have small SM theory uncertainCes
Conclusion
• LHCb is preparing for major upgrade for 2019 • ‘Triggerless’ readout and higher granularity • Aim to run at 5xluminosity, 2xefficiency (for h) • AcCve R&D to make final technology choices • ImperaCve to reach full sensiCvity to new physics in the flavour sector at the LHC
27/9/2013 XCIX Congresso Nazionale della SIF -‐ Trieste 20