Real Time DSS for Crocodile East River System A Real Time Operating Decision Support System for the Crocodile (East) River System Presentation Prepared for the first Crocodile River Operations Committee (CROC) at ICMA 6 October 2009 Water Resource Planning Systems DWA, Pretoria

A Real Time Operating Dss For The Crocodile East River System, Rc, 06 10 2009

Embed Size (px)

DESCRIPTION

 

Citation preview

Page 1: A Real Time Operating Dss For The Crocodile East River System, Rc, 06 10 2009

Rea

l T

ime

DS

S f

or

Cro

cod

ile

Eas

t R

iver

Sys

tem

A Real Time Operating Decision Support System for the Crocodile

(East) River System

Presentation

Prepared for the first Crocodile River Operations Committee (CROC)

at ICMA

6 October 2009

Water Resource Planning Systems DWA, Pretoria

Page 2: A Real Time Operating Dss For The Crocodile East River System, Rc, 06 10 2009

Rea

l T

ime

DS

S f

or

Cro

cod

ile

Eas

t R

iver

Sys

tem

History of the Study

• During 2003 drought

Knight Piesold was appointed by WRPS

in May 2004 to develop operating rules

for the Crocodile East River System.

Page 3: A Real Time Operating Dss For The Crocodile East River System, Rc, 06 10 2009

Rea

l T

ime

DS

S f

or

Cro

cod

ile

Eas

t R

iver

Sys

tem

Specific Features for the Crocodiles East System

• Allocation of water from Kwena Dam would be to supplement run-of-river supply to users;

• Travel time for releases from Kwena Dam to the border

Page 4: A Real Time Operating Dss For The Crocodile East River System, Rc, 06 10 2009

Rea

l T

ime

DS

S f

or

Cro

cod

ile

Eas

t R

iver

Sys

tem

Deliverables

• ROM model developed (long term )

• Mike 11 concept model (distribution model) to determine the release lag time.

However this two models not linked!

Page 5: A Real Time Operating Dss For The Crocodile East River System, Rc, 06 10 2009

Rea

l T

ime

DS

S f

or

Cro

cod

ile

Eas

t R

iver

Sys

tem

Motivation for the Real Time study

• Previous study by KP shows that planning tool can’t address the Crocodile operational issues

• Storage only control 10% of MAR and upper part of the catchment

• Strong co-relation flow, predicted flows to be related to historic flows

• Run of river supply dominated system• Progressive implementation of the

Reserve • Mozambique (2m3/s)• Institutional issues

Page 6: A Real Time Operating Dss For The Crocodile East River System, Rc, 06 10 2009

Rea

l T

ime

DS

S f

or

Cro

cod

ile

Eas

t R

iver

Sys

tem

We need a Real Time DSS:

– To Integrate Short‐term water distribution model and Long‐term Planning and operational Models into the system

Page 7: A Real Time Operating Dss For The Crocodile East River System, Rc, 06 10 2009

Rea

l T

ime

DS

S f

or

Cro

cod

ile

Eas

t R

iver

Sys

tem

DSS will …– Assist water managers for the decision

making – Provide stakeholders with information – Latest available data and water use

information to make simulation– Combination of Long Term Water

Resources Operational Planning Decisions with Short Term condition and requirements.

Page 8: A Real Time Operating Dss For The Crocodile East River System, Rc, 06 10 2009

Rea

l T

ime

DS

S f

or

Cro

cod

ile

Eas

t R

iver

Sys

tem

DSS will …

• Determine release required/ allowed

• Determine the restrictions where necessary

• Dissemination the information

Page 9: A Real Time Operating Dss For The Crocodile East River System, Rc, 06 10 2009

Rea

l T

ime

DS

S f

or

Cro

cod

ile

Eas

t R

iver

Sys

tem

Established DSS

• With the most advanced Real Time framework in the world !

• Many ideas (restriction model and long term stochastic model) applied first time in this study!

• Metered system in the catchment

• First ICMA in SA as implementing Agent of DSS

Page 10: A Real Time Operating Dss For The Crocodile East River System, Rc, 06 10 2009

Rea

l T

ime

DS

S f

or

Cro

cod

ile

Eas

t R

iver

Sys

tem

Future Challenge

– Coordination among Role Players, linkage with other studies and Stakeholder Buy-in

– New concept models first applied for the catchment and need prove works

– Maintenance and upgrade of Real time gauge stations

– Maintenance and upgrade rainfall and water order data

– Hydrological model (NAM) need fine calibration work

– Regional level parameter and research findings

– Tracking of model predictions and fine tune DSS

– Reserve issues

– Jointly operation with Komati System to meet IO

Page 11: A Real Time Operating Dss For The Crocodile East River System, Rc, 06 10 2009

Rea

l T

ime

DS

S f

or

Cro

cod

ile

Eas

t R

iver

Sys

tem

Important notes!

• DSS is a Dynamic Tool requiring continuous effort for the Improvement.

• Stakeholder interaction and support is very critical!