Upload
maximillian-benson
View
219
Download
2
Embed Size (px)
Citation preview
ETAEnvironmental Health and Safety Monthly Metrics
September, 2015
ETA Accidents- 9/15
Type Date Div Description Severity Status
Repetitive Motion- wrist/arm
9/4/15 EAEI Bilateral hand and forearm pain
OSHA Recordable- Work Restriction
Health Services monitoring. Ergonomic evaluation completed.
Repetitive Motion- wrist/arm
9/23/15 ESDR Progressively worsening pain in left thumb, wrist and arm
First Aid (TBD) Health Services monitoring. Ergonomic Evaluation pending.
ETA Accidents- By Type
Sep '14 Oct '14 Nov '14 Dec '14 Jan '15 Feb '15 Mar '15 Apr '15 May '15 Jun '15 Jul '15 Aug '15 Sep '15
Strain-Arm/Hand NaN NaN NaN NaN NaN NaN 1 NaN NaN NaN NaN NaN NaN
Strain-Back/Leg NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN
Repetitive NaN 1 NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN 2
Fracture/Break NaN NaN NaN NaN NaN NaN 1 NaN NaN NaN NaN NaN NaN
Chem Contact NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN 1 NaN NaN
Burn NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN
Contusion NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN
Cut/Abrasion NaN 1 NaN NaN NaN 1 NaN NaN NaN NaN NaN NaN NaN
Eye NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN
Respiratory 1 NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN
Other NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN
0.5
1.5
2.5
Respiratory Repetitive
Repetitive
Cut/Abrasion
Cut/AbrasionStrain-Arm/Hand; 1
Fracture/Break
Chem Contact
ETA Accidents- Severity
Sep
'14
Oct
'14
Nov
'14
Dec
'14
Jan
'15
Feb
'15
Mar
'15
Apr
'15
May
'15
Jun
'15
July
'15
Aug
'15
Sep
'150
1
2
3
First Aid Recordable Lost Work
ETA Emergency Incidents- 9/15
Date Incident Area Status
There were no ETA-related incidents in September
ETA Ergonomic Assessments- By Month
Aug '14 Sep '14 Oct '14 Nov '14 Dec '14 Jan '15 Feb '15 Mar '15 Apr '15 May '15 Jun '15 Jul '15 Aug '15 Sep '15
Completed 6 3 4 6 3 3 4 2 2 2 0 4 2 0
Open 0 0 0 0 0 0 0 0 0 0 0 0 2 4
0.5
1.5
2.5
3.5
4.5
5.5
6.5
7.5
8.5
9.5
Ass
essm
ents
Open ETA Ergonomic Assessments
Date Requested
Dept. Type Status
9/24/15 ESDR Discomfort Assigned
9/11/15 BTUS Office Move Actions Pending
9/10/15 EAEI Discomfort Actions Pending
9/3/15 EAEI Discomfort Actions Pending
8/17/15 EAEI Discomfort Actions Pending
8/17/15 BTUS Discomfort Actions Pending
3
2
1
Open Assessments by Div.
EAEIBTUSESDRETA
ETA Incomplete Training Assignments
Sep '13
Oct '13
Nov '13
Dec '13
Jan '14
Feb '14
Mar '14
Apr '14
May '14
Jun '14 Jul
'14Aug
'14Sep
'14Oct '1
4Nov
'14Dec '
14Jan
'15Feb
'15Mar '
15Apr '
15
May '15
Jun '15 Jul
'15Aug
'15Sep
'150
50
100
150
64
92
73
48
89 88
78
52
93
81
65
9297
69
84
75
91
73
4236
79
66
89
105
83
Incomplete Assignments
Training % Completion Status
Sep '14 Oct '14 Nov '14 Dec '14 Jan '15 Feb '15 Mar '15 Apr '15 May '15 Jun '15 Jul '15 Aug '15 Sep '1580
82
84
86
88
90
92
94
96
98
10098.5
9998.5
9998.5
9999.5 99.5
99 9998.5
9898.5
9594
93 93 9394 94 94 94
93 93 93 93
ETA % LBNL %
%
Incomplete Training by Course Type(Total Incomplete Assignments = 83 )
Fire Extinguisher; 17
Ergonomics; 15
Cyber Security; 11
Electrical/LOTO; 10
GERT; 5
UC C of I; 4
First Aid/CPR; 4
Ladder/Lift; 3
Hosting Foreign; 3
Trafficking; 3
Supervisor; 2
ISM Principles; 2Pressure; 2 Respirator; 1 Confined Space; 1
Training Assignments Due (Total = 83)
Open Assignments by Division Open Assignments by Hire Date
< 1 Month 2 to 6 Months > 6 Month0
10
20
30
40
50
60
22
10
51
Assignments
BTUS; 32
EAEI; 25
ESDR; 18
ETA; 8
ETA Training Assignments Due
Career
Affiliate
Student A
sst.
Term Appt.
Limite
d
Facu
lty
Reh RetireGSR
A
Post Doc.
Visit R
esearch
Contracto
r0
5
10
15
20
25
30
35
31
22
10
5 4 4 3 2 20 0
Assignments due by Job Type
<1 Month
1-2 Months
>2 Months
0 2 4 6 8 10 12 14 16 18
16
8
3
Renewal Training Assignments- 27 Total
ETA “Activity Manager” Set-up Status(106 Total Work Activities)
Developing EHS Collaboration Approvals Active0
20
40
60
80
100
120
6
43
1
23
33
Risk 3Risk 2Risk 1
ETA “Activity Manager” AssignmentsETA Total Personnel- 671
Assigned Not Accepted101%
Opt Out11317%
Assigned Accepted54782%
Electrical Equipment Inspection Failure Status (Red Dot)
Nov '14 Dec '14 Jan '15 Feb '15 Mar '15 Apr '15 May '15 Jun '15 July '15 Aug '15 Sep '150
2
4
6
8
10
12
14
16
18
16 17 1715 15 16 16
1311 11
9
# Failed Items
# Failed Items
Equipment listed in the EEIP database as “failed” and requires repair prior to use.
ETA Failed Electrical Equipment Status (9/30/15)
Barcode Building Room Equipment Name Responsible Person DIV
41961 70 289 Pump Destaillats, Hugo EAEI
45082 71 210 Emitters Iain Walker BTUS
39288 70 278 Power Source Maddalena, Randy EAEI
39289 70 278 AC Line Conditioner Maddalena, Randy EAEI
39304 70 278 Transistorized Power Supply Maddalena, Randy EAEI
28735 70 278 AC Power Source 400-5D Maddalena, Randy EAEI
38777 70 289 Blower Maddalena, Randy EAEI
2444 51F 101 Aethalometer Singer, Brett EAEI
2892 70 173 Power Supply Therkelsen, Peter BTUS
Corrective Action Reports (CATS)- 9/15
CAT # Date Description Lead Status
9819 4/17/15 Transfer of ownership for existing radiation authorization when PI retires
M. Foure/R. Scholtz
Determining if HR exit checkout sheet can be modified to account for change in ownership.
9881 8/31/15 Ensure all glove boxes are NRTL approved or EEIP inspected.
R. Scholtz Self-assessment action item
9882 8/31/15 Ensure all glove boxes have hazard and e-power information affixed.
R. Scholtz Self-assessment action item
Audits and Inspection Status- 9/15
Type Date Lead Status
Quarterly SAA Inspections
TBD R. Scholtz Will be scheduled for the end of October 2015.
Fire Marshal Inspection- Building 51F
10/8/15 S. Synarski Inspection scheduled. Areas being organized.
Significant Safety Achievements- 9/15• Two new Work Activities were developed in Activity Manager:
– EE-0152 (Level 2)- Pretreatment of Nafion Membranes in 62-316– EE-0154 (Level 3)- MOS Laser in 70-143
• The old chemical clean-out in 70-264 has been completed.• The Glove Box Self Assessment project has been completed and the final
report submitted. Two CATS requests were issued to address findings.• The 2016 Self Assessment Plan has been prepared and is being reviewed
prior to approvals.• The Chemical Spill Preparedness Self Assessment project report has been
prepared and is being reviewed prior to approvals.• The door hazard placards were updated for all ETA technical areas in all
buildings. The updates reflect changes in divisions, Work Activity information, changes in Area Safety Leads, and standardization in format.
• A “Lessons Learned” was submitted and approved regarding the misidentified container discovered during a hood clean-out.
• An old chemical clean-out was completed in B51F-102.
Short Term Safety Outlook 10/15
• Complete the final 5 Work Activities pending in EHS collaboration. These are for B33 JCESR.
• Submit the Lab Area Chemical Spill Preparedness Self-Assessment project final report.
• Submit the ETA Self Assessment Plan for FY2016.• Continue to address ETA equipment on the electrical equipment
“fail” list• Complete the set-up for new lab areas B33 JCESR, and B60 air
conditioning test chambers.• Complete CATS items identified from glove box self-assessment
project.• Develop standardized spill clean-up kits for ETA lab areas.• Conduct the quarterly SAA hazardous waste inspections of ETA
lab areas.