53
LHS RHS LHS RHS Description Remarks S. No OBSRTUCTIONS LIST Jetpur–Somnath Project (NH – 8D) 4 - Laning of Jetpur-Somanth Section(Km 0.000 to 127.600) of NH 8D in the State of Gujarat to be executed as BOT(TOLL) Project on DBFO pattern under NHDP Phase III Nos of Obstruction Removed Nos of Obstruction Total From To Length 39 Trees 57000 58000 1000 32 118 32 118 40 Trees 58000 59000 1000 26 43 26 43 41 Trees 59000 60000 1000 16 13 16 13 42 Trees 60000 61000 1000 76 147 76 147 43 Trees 61000 62000 1000 99 126 99 126 44 Trees 62000 63000 1000 59 52 59 52 45 Trees 63000 63900 900 97 111 97 111 46 Trees 75900 76900 1000 47 61 47 61 47 Trees 76900 77900 1000 65 82 65 82 48 Trees 77900 78900 1000 46 67 46 67 49 Trees 78900 79900 1000 78 56 78 56 50 Trees 79900 80900 1000 51 73 51 73 51 Trees 80900 81900 1000 74 173 74 173 52 Trees 81900 82900 1000 133 151 133 151 53 Trees 82900 83900 1000 42 38 42 38 54 Trees 83900 84900 1000 8 34 8 34 55 Trees 84900 85900 1000 61 114 61 114 56 Trees 85900 86900 1000 13 96 13 96 57 Trees 86900 87900 1000 10 37 10 37 58 Trees 87900 88900 1000 54 40 54 40 59 Trees 88900 89900 1000 80 16 80 16 60 Trees 89900 90900 1000 116 84 116 84 61 Trees 90900 91900 1000 111 59 111 59 62 Trees 91900 92900 1000 67 72 67 72 63 Trees 92900 93900 1000 86 10 86 10 64 Trees 93000 94000 1000 15 25 15 25 65 Trees 93900 94900 1000 58 9 58 9 66 Trees 94000 95000 1000 18 20 18 20 67 Trees 95000 96000 1000 3 5 3 5 68 Trees 96000 97000 1000 - 10 - 10 69 Trees 97000 98000 1000 24 42 24 42 70 Trees 98000 99000 1000 29 40 29 40 71 Trees 99000 100000 1000 45 41 45 41 72 Trees 100000 101000 1000 116 148 116 148 73 Trees 101000 102000 1000 60 18 60 18 74 Trees 102000 103000 1000 50 69 50 69 75 Trees 103000 104000 1000 93 69 93 69 76 Trees 104000 105000 1000 92 100 92 100 77 Trees 105000 106000 1000 34 83 34 83 Page 194 of 246

Jetpur–Somnath Project (NH – 8D) - Online PIU ...nhai.org.in/spw/ConcessionaireDetails/MPR June-14 Part-6.pdf · Major Bridge construction, Highway works & protection ... GAD

  • Upload
    dotu

  • View
    232

  • Download
    2

Embed Size (px)

Citation preview

Page 1: Jetpur–Somnath Project (NH – 8D) - Online PIU ...nhai.org.in/spw/ConcessionaireDetails/MPR June-14 Part-6.pdf · Major Bridge construction, Highway works & protection ... GAD

LHS RHS LHS RHS

Description RemarksS.

No

OBSRTUCTIONS LIST

Jetpur–Somnath Project (NH – 8D)

4 - Laning of Jetpur-Somanth Section(Km 0.000 to 127.600) of NH 8D in the State of Gujarat to be executed as

BOT(TOLL) Project on DBFO pattern under NHDP Phase III

Nos of Obstruction

Removed

Nos of Obstruction

TotalFrom To Length

39 Trees 57000 58000 1000 32 118 32 118

40 Trees 58000 59000 1000 26 43 26 43

41 Trees 59000 60000 1000 16 13 16 13

42 Trees 60000 61000 1000 76 147 76 147

43 Trees 61000 62000 1000 99 126 99 126

44 Trees 62000 63000 1000 59 52 59 52

45 Trees 63000 63900 900 97 111 97 111

46 Trees 75900 76900 1000 47 61 47 61

47 Trees 76900 77900 1000 65 82 65 82

48 Trees 77900 78900 1000 46 67 46 67

49 Trees 78900 79900 1000 78 56 78 56

50 Trees 79900 80900 1000 51 73 51 73

51 Trees 80900 81900 1000 74 173 74 173

52 Trees 81900 82900 1000 133 151 133 151

53 Trees 82900 83900 1000 42 38 42 38

54 Trees 83900 84900 1000 8 34 8 34

55 Trees 84900 85900 1000 61 114 61 114

56 Trees 85900 86900 1000 13 96 13 96

57 Trees 86900 87900 1000 10 37 10 37

58 Trees 87900 88900 1000 54 40 54 40

59 Trees 88900 89900 1000 80 16 80 16

60 Trees 89900 90900 1000 116 84 116 84

61 Trees 90900 91900 1000 111 59 111 59

62 Trees 91900 92900 1000 67 72 67 72

63 Trees 92900 93900 1000 86 10 86 10

64 Trees 93000 94000 1000 15 25 15 25

65 Trees 93900 94900 1000 58 9 58 9

66 Trees 94000 95000 1000 18 20 18 20

67 Trees 95000 96000 1000 3 5 3 5

68 Trees 96000 97000 1000 - 10 - 10

69 Trees 97000 98000 1000 24 42 24 42

70 Trees 98000 99000 1000 29 40 29 40

71 Trees 99000 100000 1000 45 41 45 41

72 Trees 100000 101000 1000 116 148 116 148

73 Trees 101000 102000 1000 60 18 60 18

74 Trees 102000 103000 1000 50 69 50 69

75 Trees 103000 104000 1000 93 69 93 69

76 Trees 104000 105000 1000 92 100 92 100

77 Trees 105000 106000 1000 34 83 34 83

Page 194 of 246

Page 2: Jetpur–Somnath Project (NH – 8D) - Online PIU ...nhai.org.in/spw/ConcessionaireDetails/MPR June-14 Part-6.pdf · Major Bridge construction, Highway works & protection ... GAD

LHS RHS LHS RHS

Description RemarksS.

No

OBSRTUCTIONS LIST

Jetpur–Somnath Project (NH – 8D)

4 - Laning of Jetpur-Somanth Section(Km 0.000 to 127.600) of NH 8D in the State of Gujarat to be executed as

BOT(TOLL) Project on DBFO pattern under NHDP Phase III

Nos of Obstruction

Removed

Nos of Obstruction

TotalFrom To Length

78 Trees 106000 107000 1000 29 155 29 155

79 Trees 107000 108000 1000 36 180 36 180

80 Trees 108000 109000 1000 35 119 35 119

81 Trees 109000 110000 1000 50 32 50 32

82 Trees 110000 111000 1000 106 72 106 72

83 Trees 111000 112000 1000 19 197 19 197

84 Trees 112000 113000 1000 69 81 69 81

85 Trees 113000 114000 1000 32 57 32 57

86 Trees 114000 115000 1000 390 529 390 529

87 Trees 115000 116000 1000 335 294 335 294

88 Trees 116000 117000 1000 272 214 272 214

89 Trees 117000 118000 1000 53 134 53 134

90 Trees 118000 119000 1000 46 91 46 91

91 Trees 119000 120000 1000 3 9 3 9

92 Trees 120000 121000 1000 9 32 9 32

93 Trees 121000 122000 1000 15 2 15 2

94 Trees 122000 123000 1000 67 31 67 31

95 Trees 123000 123454 454 46 9 46 9

Total 7,324 8,232 7,324 8,232

Page 195 of 246

Page 3: Jetpur–Somnath Project (NH – 8D) - Online PIU ...nhai.org.in/spw/ConcessionaireDetails/MPR June-14 Part-6.pdf · Major Bridge construction, Highway works & protection ... GAD

MONTHLY PROGRESS REPORT – JUNE ’2014 Jetpur - Somnath Section of NH-8D

F. DETAILS OF HINDRANCES

AFFECEING THE WORK

4 Laning of Jetpur - Somnath Section (Km.0.000 to 127.600) of NH-8D in the State of Gujarat on DBFO Pattern under NHDP Phase III

Page 196 of 246

Page 4: Jetpur–Somnath Project (NH – 8D) - Online PIU ...nhai.org.in/spw/ConcessionaireDetails/MPR June-14 Part-6.pdf · Major Bridge construction, Highway works & protection ... GAD

Jetpur Somnath Tollways Pvt. Ltd [JSTPL]Jetpur Somnath Tollways Pvt. Ltd [JSTPL]Jetpur Somnath Tollways Pvt. Ltd [JSTPL]Jetpur Somnath Tollways Pvt. Ltd [JSTPL]

Details of hindrances / obstacles affecting four laning - Status as on 30 June 2014Details of hindrances / obstacles affecting four laning - Status as on 30 June 2014Details of hindrances / obstacles affecting four laning - Status as on 30 June 2014Details of hindrances / obstacles affecting four laning - Status as on 30 June 2014 Annexure-10FAnnexure-10FAnnexure-10FAnnexure-10F

FromFromFromFrom ToToToToLength in Length in Length in Length in

MtrsMtrsMtrsMtrsLHSLHSLHSLHS RHSRHSRHSRHS

BOTH BOTH BOTH BOTH

SIDESIDESIDESIDE

46200 46550 350 350 350.0Existing Major Bridge (Ozat river) @ 46+375 proposed for

re-construction (CoS)- In principle approval pending

Gap in 4 lane traffic and structure work along with

approaches of Highway on LHS Side

48450 48520 70 70 70.0 Service Road end & tapering portion at Kanza village Service road, tapering portion to MCW & lined drain

50900 51500 600 600 1,200.0 100m RoW land for Toll Plaza (1)Toll Plaza DLC, PQC, Admin Buildings, Toll Booth, all

Toll Plaza allied works, Bus Shelter after Toll Plaza

56700 57100 400 400 400.0 CoS - Re-construction of MJB @ 56+769 delayed approvalsMajor Bridge construction, Highway works & protection

works

63600 75000 11400 11,400 22,800.060m RoW not available (work carried out in available RoW

of 30 m @ Keshod Bypass with restricted EMB slope)

Service Road works (2.60 Km), Shoulder slopes, unlined

drain, Lined drain at Service Road, Major and Minor

Junction, Bus shelter, Embankment protection, Turfing

91300 91500 200 200 Underground electric line crossing issues at Service Road

Tapering portion (Somnath side)Service Road construction at MCW merging point

96700 96800 100 100 100.0 Land issues at Service Road Tapering portion Service Road construction at MCW merging point

110980 111110 130 130 Payment for property is pending (Universal Construction

Office)All highway works.

111840 111920 80 80 160.0 Matter for acquisition of land is in High Court (PIL 13477)All Highway works and also the connectivity in the

Veraval realignment (1.1 Km length).

108680 109280 600 600 1,200.0 100m RoW land for Toll Plaza (2)Toll Plaza DLC, PQC, Admin Buildings, Toll Booth, all

Toll Plaza allied works, Bus Shelter after Toll Plaza

26.326.326.326.3

13.113.113.113.1

Affected WorksAffected WorksAffected WorksAffected Works

Cumulative Two-lane length affected Cumulative Two-lane length affected Cumulative Two-lane length affected Cumulative Two-lane length affected

(in 2L-Kms):(in 2L-Kms):(in 2L-Kms):(in 2L-Kms):

Cumulative Four-lane length affected Cumulative Four-lane length affected Cumulative Four-lane length affected Cumulative Four-lane length affected

(in 4L-Kms):(in 4L-Kms):(in 4L-Kms):(in 4L-Kms):

ChainageChainageChainageChainage Hindrances inHindrances inHindrances inHindrances in

2 Lane Affected 2 Lane Affected 2 Lane Affected 2 Lane Affected

length in Mtrslength in Mtrslength in Mtrslength in MtrsDetail of HindrancesDetail of HindrancesDetail of HindrancesDetail of Hindrances

Page 197 of 246

Page 5: Jetpur–Somnath Project (NH – 8D) - Online PIU ...nhai.org.in/spw/ConcessionaireDetails/MPR June-14 Part-6.pdf · Major Bridge construction, Highway works & protection ... GAD

MONTHLY PROGRESS REPORT – JUNE ’2014 Jetpur - Somnath Section of NH-8D

ANNEXURE-11

APPROVAL OF GAD FOR ROB

4 Laning of Jetpur - Somnath Section (Km.0.000 to 127.600) of NH-8D in the State of Gujarat on DBFO Pattern under NHDP Phase III

Page 198 of 246

Page 6: Jetpur–Somnath Project (NH – 8D) - Online PIU ...nhai.org.in/spw/ConcessionaireDetails/MPR June-14 Part-6.pdf · Major Bridge construction, Highway works & protection ... GAD

MONTHLY PROGRESS REPORT – JUNE ’2014 Jetpur - Somnath Section of NH-8D

APPROVAL OF GAD’s FOR ROBs

4 Laning of Jetpur - Somnath Section (Km.0.000 to 127.600) of NH-8D in the State of Gujarat on DBFO Pattern under NHDP Phase III

Page 199 of 246

Page 7: Jetpur–Somnath Project (NH – 8D) - Online PIU ...nhai.org.in/spw/ConcessionaireDetails/MPR June-14 Part-6.pdf · Major Bridge construction, Highway works & protection ... GAD

Status as on : 30 June '14

R.O.B. No and

Ch.

Village detail, Land Acquisition and

Land Availability Status

GAD Status Detailed Design Status Excavation Commencement as per MIP Remarks

Detailed Design for Foundation & Substructure

approved from Western Railways.

Detailed Design for superstructure (RCC girder

spans P1-P2 and P2-P3) is under process for

Submission to ICT approval

Girder Launching Scheme approval by CRS is also

completed

29-Oct-12

RE WALL: Detailed Design approved by IE Work started on 12 Oct '13 but commencement

is delayed by 348 days with respect to MIP start

date (29 Oct '12)

Vadal Village 15-Mar-13

(On HOLD due to Land Acquisition

of Junagadh Bypass) ON HOLD

Delayed by 472 days as on 30 June '14

28-Dec-12

Work started on 28 June '13 but commencement

is delayed by 182 days with respect to MIP start

date (28 Dec '12)

28-Nov-12

Work started on 07 May '13 but commencement

is delayed by 160 days with respect to MIP start

date (28 Nov '12)

On hold due to Junagadh Bypass

STATUS UPDATE FOR R.O.B.'s

Four Laning of Jetpur Somnath-Section of NH-8D

R.O.B. No.1 @

Ch: 2.800

Approved 1. Substructure works (except P2) completed

on both sides of Jetpur & Somnath end.

2. RE wall works are in progress on both ends

3. Steel girder Assembling is under progress

for Span P3-A2 & Span A1-P1

R.O.B. No.2 @

Ch: 21.370

Approved Detailed Design for Foundation & Substructure will be

prepared after finalization of Junagadh Bypass

Land Possession Completed

1. Level Crossing shifting Completed

2. Substructure works completed

3. RCC Retaining wall work is completed on

LHS on both ends

4. RCC Retaining wall work is under progress

on RHS Somnath end

R.O.B. No.3 @

Ch: 112.938

Approved Plan for Shifting Level Crossing is approved by WR,

HQ and CRS approval also received from Railways.

Detailed Design for Foundation & Substructure

approved from Western Railways.

Detailed Design for superstructure is approved by IIT,

Mumbai

1. Level Crossing shifting Completed

2. foundation completed and Substructure

works are in progress with in railway

boundary

3. Substructure completed for A2 LHS and A1

RHS

4. RE wall work are in progress on Jetpur end

BHS

R.O.B. No.4 @

Ch: 118.374

Approved Plan for Shifting Level Crossing is approved by WR,

HQ and CRS approval also received from Railways.

Detailed Design for Foundation & Substructure

approved from Western Railways.

Detailed Design for superstructure (solid slab &

bearings) is approved by IIT, Mumbai and submitted to

IE & Western Railways. Approval from ICT is obtained

but Western Railways is awaited for Non Railway

spans (A1-P1 and P2-A2)

Land Possession Completed

Land Possession Completed

Page 200 of 246

Page 8: Jetpur–Somnath Project (NH – 8D) - Online PIU ...nhai.org.in/spw/ConcessionaireDetails/MPR June-14 Part-6.pdf · Major Bridge construction, Highway works & protection ... GAD

MONTHLY PROGRESS REPORT – JUNE ’2014 Jetpur - Somnath Section of NH-8D

ANNEXURE-12

LIST OF CHANGE OF SCOPE

4 Laning of Jetpur - Somnath Section (Km.0.000 to 127.600) of NH-8D in the State of Gujarat on DBFO Pattern under NHDP Phase III

Page 201 of 246

Page 9: Jetpur–Somnath Project (NH – 8D) - Online PIU ...nhai.org.in/spw/ConcessionaireDetails/MPR June-14 Part-6.pdf · Major Bridge construction, Highway works & protection ... GAD

MONTHLY PROGRESS REPORT – JUNE ‘2014 Jetpur - Somnath Section of NH-8D

4 L a n i n g o f J e t p u r - S o m n a t h S e c t i o n ( K m . 0 . 0 0 0 t o 1 2 7 . 6 0 0 ) o f N H - 8 D i n t h e S t a t e o f G u j a r a t o n D B F O P a t t e r n u n d e r N H D P P h a s e I I I

LIST OF VARIATIONS (CHANGE OF SCOPE) UNDER ARTICLE 16 OF

CONCESSION AGREEMENT

Status of Change of Scope as on date is appended in below table:

Sl.

No

Details of Proposal Estimate

(Apprx)

Approval status Construction

Status

1 CoS proposal for 14

Nos Additional

culverts

4.07 Cr In principal Approval

accorded by NHAI.

In progress / 50%

Completed

2 CoS Proposal for

Wider Median

11.93 Cr In principal Approval

accorded by NHAI.

In progress / 38%

Completed

3 CoS Proposal for

VUP at Jetalsar at ch.

5+900

5.26 Cr In principal Approval

accorded by NHAI.

In progress / 50%

Completed

4 CoS Proposal for

PUP at 3+800

1.00 Cr In principal Approval

accorded by NHAI.

In progress / 87%

Completed

5 CoS proposal for

Reconstruction of

Bridges (1 MNB + 4

MJB)

27.30 Cr In principal Approval

accorded by NHAI.

To be started

6 CoS Proposal for

Animal Under pass at

ch 46+180

2.30 Cr In principal Approval

accorded by NHAI.

In progress / 72%

Completed

7 Construction of the

Syphon at Km.

60.050 (Ch. 57+490)

of NH 8D.

0.39 Cr The Authority has

forwarded the proposal

to Irrigation department

to deposit the estimated

amount

Yet to be taken up /

Waiting for deposit by

Irrigation department

8 Proposal for Repair &

rehabilitation of

Existing Road

6.52 Cr Proposal recommended

by PD to RO,

Gandhinagar for further

necessary approval from

NHAI HQ

In progress / 100%

Completed

9 Proposal for PUP in

the approaches of

RoB-1

2.10 Cr In principal Approval

accorded by NHAI.

In progress

10 Proposal for Overlay

in Junagadh Bypass

18.00 Cr Proposal under review

with NHAI

In progress / 33%

Completed/ Waiting

for COS approval

from NHAI

11 Construction of PUP

113+306

0.855 Cr In principal Approval

accorded by NHAI.

In progress / 50%

Completed/

Page 202 of 246

Page 10: Jetpur–Somnath Project (NH – 8D) - Online PIU ...nhai.org.in/spw/ConcessionaireDetails/MPR June-14 Part-6.pdf · Major Bridge construction, Highway works & protection ... GAD

MONTHLY PROGRESS REPORT – JUNE ’2014 Jetpur - Somnath Section of NH-8D

4 L a n i n g o f J e t p u r - S o m n a t h S e c t i o n ( K m . 0 . 0 0 0 t o 1 2 7 . 6 0 0 ) o f N H - 8 D i n t h e S t a t e o f G u j a r a t o n D B F O P a t t e r n u n d e r N H D P P h a s e I I I

I) Addition of New structures in bypass stretches for balancing as required

based on codal provisions and addition of structures as already exist at site but

not included in contract scope (Missed during DPR).

While carrying out structural Inventory at site, additional structures have been found at

following locations. There will be change of scope for these structures, which are not

included in Schedule B of Concession Agreement. The estimates for these additional

structures have been forwarded to IE for verification and approval. IE has forwarded the

recommendation with cost of four (4) Box culverts and eight (8) Hume Pipe culverts to

NHAI (vide letter no. ICT: 655: NCS: 2099 dated 15.02.2013, ICT: 655: NCS::2519 dtd.

26.02.2013, and ICT: 655: NCS: 12017 dtd. 01.10.2013) for their further approval.

NHAI has accorded their In-principle Approval for Additional culverts Vide Letter No:

NHAI/PIU/RAJ/2014/D-683 Dt: 24/02/24 for An Amount of 4.07 Cr.

The detailed status of change of scope is tabulated as below for ready reference:

Page 203 of 246

Page 11: Jetpur–Somnath Project (NH – 8D) - Online PIU ...nhai.org.in/spw/ConcessionaireDetails/MPR June-14 Part-6.pdf · Major Bridge construction, Highway works & protection ... GAD

LIST OF ADDITIONAL CULVERTS AT FOUR LANING OF JETPUR - SOMNATH SECTION OF NH-8D

1 4+185.000 RCC Box New JSTL/2012/71 Dated 14-08-2012

Recommended for Approval(vide lr.

ICT:655:NCS::2099 dtd. 15.02.2013

ICT:655:NCS:12017 dtd. 01.10.2013)

NHAI/PIU/RAJ/2014/D-683

Dt: 24/02/14

2 4+420.000 RCC Box New JSTL/2012/71 Dated 14-08-2012

Recommended for Approval(vide lr.

ICT:655:NCS::2099 dtd. 15.02.2013

ICT:655:NCS:12017 dtd. 01.10.2013)

NHAI/PIU/RAJ/2014/D-683

Dt: 24/02/14

3 65+200.000 HPC New JSTL/IE/703/2013dated 31-08-2013Recommended for Approval(vide lr.

ICT:655:NCS:12017 dated 01.10.2013)

NHAI/PIU/RAJ/2014/D-683

Dt: 24/02/14

4 67+040.000 HPC New JSTL/2012/71 Dated 14-08-2012

Recommended for Approval(vide lr.

ICT:655:NCS::2099 dtd. 15.02.2013

ICT:655:NCS:12017 dtd. 01.10.2013)

NHAI/PIU/RAJ/2014/D-683

Dt: 24/02/14

5 67+934.000 HPC New JSTL/2012/71 Dated 14-08-2012

Recommended for Approval(vide lr.

ICT:655:NCS::2099 dtd. 15.02.2013

ICT:655:NCS:12017 dtd. 01.10.2013)

NHAI/PIU/RAJ/2014/D-683

Dt: 24/02/14

6 69+120.000 HPC New JSTL/2012/71 Dated 14-08-2012

Recommended for Approval(vide lr.

ICT:655:NCS::2099 dtd. 15.02.2013

ICT:655:NCS:12017 dtd. 01.10.2013)

NHAI/PIU/RAJ/2014/D-683

Dt: 24/02/14

7 70+620.000 HPC New JSTL/2012/71 Dated 14-08-2012

Recommended for Approval(vide lr.

ICT:655:NCS::2099 dtd. 15.02.2013

ICT:655:NCS:12017 dtd. 01.10.2013)

NHAI/PIU/RAJ/2014/D-683

Dt: 24/02/14

8 71+225.000 HPC New JSTL/2012/71 Dated 14-08-2012

Recommended for Approval(vide lr.

ICT:655:NCS::2099 dtd. 15.02.2013

ICT:655:NCS:12017 dtd. 01.10.2013)

NHAI/PIU/RAJ/2014/D-683

Dt: 24/02/14

9 71+700.000 HPC New JSTL/2012/71 Dated 14-08-2012

Recommended for Approval(vide lr.

ICT:655:NCS::2099 dtd. 15.02.2013

ICT:655:NCS:12017 dtd. 01.10.2013)

NHAI/PIU/RAJ/2014/D-683

Dt: 24/02/14

10 110+499.213RCC Box converted

to HPC

Reconstruction

(VUP Approach)JSTL/IE/703/2013dated 31-08-2013

Recommended for Approval(vide lr.

ICT:655:NCS::2519 dtd. 26.02.2013

ICT:655:NCS:12017 dtd. 01.10.2013)

NHAI/PIU/RAJ/2014/D-683

Dt: 24/02/14

11 110+812.230RCC Box converted

to HPCReconstruction JSTL/IE/703/2013dated 31-08-2013

Recommended for Approval(vide lr.

ICT:655:NCS:12017 dated 01.10.2013)

NHAI/PIU/RAJ/2014/D-683

Dt: 24/02/14

Treatment Notification from ConcessionaireProposed Type In principal Approval NHAI S.No. Design Chainage I.E. Recommendation

Page 204 of 246

Page 12: Jetpur–Somnath Project (NH – 8D) - Online PIU ...nhai.org.in/spw/ConcessionaireDetails/MPR June-14 Part-6.pdf · Major Bridge construction, Highway works & protection ... GAD

LIST OF ADDITIONAL CULVERTS AT FOUR LANING OF JETPUR - SOMNATH SECTION OF NH-8D

Treatment Notification from ConcessionaireProposed Type In principal Approval NHAI S.No. Design Chainage I.E. Recommendation

12 112+900.609HPC Converted to

Box

Reconstruction

(ROB Approach)JSTL/IE/703/2013dated 31-08-2013

Recommended for Approval(vide lr.

ICT:655:NCS::2519 dtd. 26.02.2013

ICT:655:NCS:12017 dtd. 01.10.2013)

NHAI/PIU/RAJ/2014/D-683

Dt: 24/02/14; but later NHAI conveyed to relocate the

existing box culvert from Ch. 3+800 to same size box

culvert in approaches to ROB-3 at Ch. 112+978 vide

letter No. NHAI/NHDP/COS/JET/RJK/2012/54 dt.

30.10.13

13 119+794.822 Pipe Reconstruction JSTL/IE/703/2013dated 31-08-2013

Recommended for Approval(vide lr.

ICT:655:NCS::2519 dtd. 26.02.2013

ICT:655:NCS:12017 dtd. 01.10.2013)

NHAI/PIU/RAJ/2014/D-683

Dt: 24/02/14

14 120+632.246 Pipe Reconstruction JSTL/IE/703/2013dated 31-08-2013

Recommended for Approval(vide lr.

ICT:655:NCS::2519 dtd. 26.02.2013

ICT:655:NCS:12017 dtd. 01.10.2013)

NHAI/PIU/RAJ/2014/D-683

Dt: 24/02/14

Page 205 of 246

Page 13: Jetpur–Somnath Project (NH – 8D) - Online PIU ...nhai.org.in/spw/ConcessionaireDetails/MPR June-14 Part-6.pdf · Major Bridge construction, Highway works & protection ... GAD

MONTHLY PROGRESS REPORT – JUNE ’2014 Jetpur - Somnath Section of NH-8D

4 L a n i n g o f J e t p u r - S o m n a t h S e c t i o n ( K m . 0 . 0 0 0 t o 1 2 7 . 6 0 0 ) o f N H - 8 D i n t h e S t a t e o f G u j a r a t o n D B F O P a t t e r n u n d e r N H D P P h a s e I I I

II) Change of scope due to provision of wider median section by NHAI over a

length of 13.40 Km. to save the trees (Protected & Ficus) to get the approval from

MOEF in respect of Diversion of forest land and permission for cutting of trees in

protected forest.

In pursuant to FAC-I conditions of MOEF, a proposal for diversion of protected forest

with specific condition of having a wider median to save maximum number of trees has

been prepared over an alignment of 13.4 km length as given below.

The revised drawings to accommodate the FAC-I proposal have been approved by the

Independent Engineer. Based on the approved TCS by the IE, cost estimate worked to

Rs.11.93 Cr. has been approved already.

S.

No

Existing Chainage

Notification from

Concessionaire

Action from IE Action from

Authority Date Reference No.

From To Length

(km)

1 53.00 53.50 0.50

20-Nov-12 JSTL/2012/113

Recommended for

approval to PD

NHAI Vide letter

No.

ICT/655/NSC/145

13 Dated 30.11.12

In Principle Approval

from NHAI Received

thru letter vide

NHAI/PIU/RJK/ICT/2

013/868 dt 22.03.13

2 54.10 56.00 1.90

3 62.00 66.00 4.00

4 103.00 110.00 7.00

Total 13.40

Page 206 of 246

Page 14: Jetpur–Somnath Project (NH – 8D) - Online PIU ...nhai.org.in/spw/ConcessionaireDetails/MPR June-14 Part-6.pdf · Major Bridge construction, Highway works & protection ... GAD

MONTHLY PROGRESS REPORT – JUNE ’2014 Jetpur - Somnath Section of NH-8D

4 L a n i n g o f J e t p u r - S o m n a t h S e c t i o n ( K m . 0 . 0 0 0 t o 1 2 7 . 6 0 0 ) o f N H - 8 D i n t h e S t a t e o f G u j a r a t o n D B F O P a t t e r n u n d e r N H D P P h a s e I I I

III) Change of scope Notice under Clause 16.1.2 of CA due to addition /deletion of

following items from the scope

a) With reference to the MOM and discussions had during the Project Review

Meeting held on 29th Sep „12 with NHAI, EPC Contractor and IE representatives,

wherein it was agreed for Deletion / Addition of items from the scope defined in

Schedule of CA at the following locations.

b) As per the local villagers demand vide Jetalsar Gram Panchyat, Jetalsar vide letter No. 5/13 dt

14.05.2013, for underpass for crossing of their tractors, bullock carts etc. during non rainy

season so that their vehicles can cross the 4-lane highway and during the rainy season it

caters for drainage from the adjoining areas. IE has visited the site on 08th June 2013, and felt

S.

No

Existing Chainage Notification from

Concessionaire

Action from IE Action from Authority

Date Reference

No.

1

Demand to replace

the PUP 6+100 with

VUP 5+920 by local

public

17-Nov-

12

JSTL/2012/

112

Recommended for

principal approval to

PD NHAI vide

Letter No.

ICT/655/NCS/15206

dated 12.12.12

In Principle Approval from

NHAI Received thru letter

vide

NHAI/PIU/RJK/ICT/2013/

868 dt 22.03.13

2 Demand for Deletion

of box culvert at Ch.

59+760 by local

public

NHAI has approved

relocation Of BC from Ch.

59+760 to Ch.69+950 thru

letter Vide

NHAI/IU/RJK/ICT/2013/868

dt 22.03.13

3 Demand to replace

Box Culvert with

PUP at Ch. 59+415

(Agatrai Re-

alignment) by local

public

NHAI has approved

relocation of PUP from

Ch. 64+882 to Ch.59+415

thru letter vide

NHAI/PIU/RJK/ICT/2013/

868 dt 22.03.13

4 Provision of Box

Culvert at Ch.

69+950

NHAI has approved

relocation of BC from

Ch.59+760 to ch.69+950

thru letter vide

NHAI/PIU/RJK/ICT/2013/868

dt 22.03.13

5 Deletion of box

culvert at Ch.

51+111

Recommended for

in principal approval

to PD NHAI by IE

vide Letter No.

ICT/655/NCS/10241

dated 13.08.13

NHAI has approved

relocation of BC from

Ch.59+760 to ch.69+950

thru letter vide

NHAI/PIU/RJK/ICT/2013/868

dt 22.03.13

Page 207 of 246

Page 15: Jetpur–Somnath Project (NH – 8D) - Online PIU ...nhai.org.in/spw/ConcessionaireDetails/MPR June-14 Part-6.pdf · Major Bridge construction, Highway works & protection ... GAD

MONTHLY PROGRESS REPORT – JUNE ’2014 Jetpur - Somnath Section of NH-8D

4 L a n i n g o f J e t p u r - S o m n a t h S e c t i o n ( K m . 0 . 0 0 0 t o 1 2 7 . 6 0 0 ) o f N H - 8 D i n t h e S t a t e o f G u j a r a t o n D B F O P a t t e r n u n d e r N H D P P h a s e I I I

that underpass may be provided at Ch. 3+825 with a minor skew angle to meet the demand

of local villagers. Thus recommended for a negative change of scope in deletion of 3x2.1m

RCC box culvert and introduction of an underpass (CUP/PUP) of size 5x3.50m to PD, NHAI

PIU Rajkot vide letter No. ICT/502/NCS/7539 (New dispatch No. 7623) dt 11.06.2013

NHAI has approved Provision of underpass at Ch.3+800 as a positive variation with an

indicative cost of Rs. 99,80273/- and to relocate the existing box culvert from Ch. 3+800 to

same size box culvert in approaches to ROB-3 at Ch. 112+978 vide letter No.

NHAI/NHDP/COS/JET/RJK/2012/54 dt. 30.10.13 and NHAI/PI/RJK/General/2013/D-3872 dt

07.11.13

IV) Change of scope Notice under Clause 16.1.2 of CA due to

Rehabilitation/Reconstruction of existing structures, which are in distress condition

& beyond the limits of economical repairs

As per the recommendation of IE and the joint site visit of committee on Dt. 13 – 15

September 2012 formed as per recommendation of Hon‟ble Member Finance, the

superstructure of all the below five bridges reviewed and observed that superstructure is in a

very dilapidated condition and major distresses were noticed in all the below mentioned

structures.

Concessionaire has submitted indicative cost of dismantling, repair & rehabilitation,

construction of return walls, wind wall and median wall, construction of approaches. IE has

approved the proposal and recommended to PIU Rajkot vide letter No. ICT/655/NCS/2044

dated 14.02.13. Further NHAI, PIU, Rajkot has requested CGM, NHAI to accord approval of

change of scope vide letter No. NHAI/PI/RJK/Jet-Som/2013/D-494 dt 22.02.13. NHAI has

S.

No

Existing Chainage Request from NHAI, PIU Rajkot Action from IE Action from

Authority

Date Reference No.

1

Demand to replace

the Box Culvert at

Ch.3+800 with PUP

at Ch. 3+825 by

local villagers

16 May „13

NHAI/PIU/RJK/ICT/

2013/D-1691

Recommended for

principal approval to

PD NHAI vide

Letter No.

ICT/502/NCS/7539

(New dispatch No.

7623) dt 11.06.2013

NHAI has approved

thru vide letter No.

NHAI/NHDP/COS/J

ET/RJK/2012/54 dt.

30.10.13 and

NHAI/PI/RJK/Genera

l/2013/D-3872 dt

07.11.13

Page 208 of 246

Page 16: Jetpur–Somnath Project (NH – 8D) - Online PIU ...nhai.org.in/spw/ConcessionaireDetails/MPR June-14 Part-6.pdf · Major Bridge construction, Highway works & protection ... GAD

MONTHLY PROGRESS REPORT – JUNE ’2014 Jetpur - Somnath Section of NH-8D

4 L a n i n g o f J e t p u r - S o m n a t h S e c t i o n ( K m . 0 . 0 0 0 t o 1 2 7 . 6 0 0 ) o f N H - 8 D i n t h e S t a t e o f G u j a r a t o n D B F O P a t t e r n u n d e r N H D P P h a s e I I I

approved thru vide letter No. NHAI/11012/I/ Jetpur-Somnath/NH-8D/2013/178 dt 21.04.2014

and NHAI/PIU/RAJ/2014/D-1291 dt 21.04.2014

S. No Existing

Chainage

Notification from

Concessionaire Action from IE

Action from

Authority Date

Reference

No.

1 Minor Bridge at

Ch. 45+130

01.12.12

JSTL/2012/

121

Recommended for

principal approval

NHAI vide Letter No.

ICT/655/NCS/2044

dated 14.02.13 and

IE/JSTPL/196 dtd.

19.03.2013

NHAI has

approved thru

vide letter No.

NHAI/11012/I/J

etpur-

Somnath/NH-

8D/2013/178 dt

21.04.2014 and

NHAI/PIU/RAJ/

2014/D-1291 dt

21.04.2014

2 Major Bridge at

Ch. 46+375

3 Major Bridge at

Ch. 56+780

4 Major Bridge at

Ch. 99+150

5 Major Bridge at

Ch. 99+500

V) Change of scope Notice under Clause 16.1.2 of CA for construction of

Underpass for Wild life animal crossing.

While giving stage II approval for protected forest on 28.12.12, MoEF has proposed to

construct an underpass between Ch.48+000 to Ch.49+000 for wildlife crossing.

Location of proposed CUP has been finalized at Ch.46+180 jointly by Forest Department,

IE, and Concessionaire‟s representatives during site visit.

Authority has given “ In-Principle” approval for construction of structure of span 10m X

6m for crossing of animals in compliance to the Forest & Environment advisory Committee

GOI, thru letter vide NHA/PIU/RJK/ICT/2013/868 dt.22.03.13 for an amount of 2.30Cr.

VI) Change of scope Notice under Clause 16.1.2 of CA for construction of the

Syphon at Km. 60.050 (Ch. 57+490) of NH 8D.

As requested by Executive Engineer, Junagadh Irrigation project division for construction of

the Shyphon at Km. 60.050 (Ch. 57+490) of NH 8D for canal crossing vide letter No. PB-

A/Sabli/Canal/NH.Xing/5358 Dt. 9.11.2012, the matter has been evaluated by the

Concessionaire and the project Independent Engineer.

Based on the requirement by Irrigation department, concessionaire has prepared the

design and drawing for the proposed structure along with the cost estimate and it was duly

reviewed and recommended by the project Independent Engineer.

The Authority has forwarded the proposal to Irrigation department to deposit the

estimated amount of Rs. 39,26,656/-. Upon receipt of the said amount from Irrigation

department, construction of the structure can be taken up by Concessionaire to match

Page 209 of 246

Page 17: Jetpur–Somnath Project (NH – 8D) - Online PIU ...nhai.org.in/spw/ConcessionaireDetails/MPR June-14 Part-6.pdf · Major Bridge construction, Highway works & protection ... GAD

MONTHLY PROGRESS REPORT – JUNE ’2014 Jetpur - Somnath Section of NH-8D

4 L a n i n g o f J e t p u r - S o m n a t h S e c t i o n ( K m . 0 . 0 0 0 t o 1 2 7 . 6 0 0 ) o f N H - 8 D i n t h e S t a t e o f G u j a r a t o n D B F O P a t t e r n u n d e r N H D P P h a s e I I I

with the schedule of project. Authority has pursued the matter with Irrigation department

to deposit the amount to proceed further.

VI) Urgent Repair and Maintenance needs for existing Junagadh Bypass due to

non-availability / further delays in land possession for Proposed Junagadh

Bypass

JSTPL has submitted the proposal for major maintenance / strengthening of existing

Junagadh Bypass through letter No. JSTPL/2014/365 dated 10.03.14 and requested

the Authority to accord approval, under change of scope, for carrying out major

maintenance prior to monsoon period, so that excessive deterioration during

monsoon can be avoided and the existing bypass can be maintained in traffic worthy

condition for the benefit of road users.

VII) Provision of underpass (PUP) in both sides of ROB approaches at RoB-I

near Jetalsar Village as per demand of Villagers

As submitted the demand for provision of underpass by villagers of Jetalsar through

Hon‟ble Member of Parliament, vide letter dated 22.02.14, JSTPL was instructed to submit

the proposal for provision in both sides of ROB-1, through Independent Engineer.

JSTPL has submitted the proposal through letter No. JSTPL/IE/885/2014 dated 03 March

‟14, along with the concept plan. IE has reviewed the same and recommend to PIU, Rajkot

through Letter no. ICT:655:NCS:2866 dated 12 March ‟14.

PIU, Rajkot has sent the request for approval to CGM, Gandhinagar through letter No.

NHAI/PIU/RJK/Jet-Som/2013/D-1020 dated 27.03.2014

Manager (T) for CGM (T) & RO-Gujarat has sent recommendation to NHAI, HQ for In

principle approval of the competent authority through Letter no. NHAI/12013/2/2010-RO-

GNR/Tech./Jet-Som/490 dt 23.05.2014.

NHAI has approved thru vide letter No. NHAI/11012/I/ Jetpur-Somnath/NH-8D/2013/190

dt 16.06.2014.

VIII) Provision of additional underpass (PUP) at design Chainage 113+306

under Change of Scope (Size 5 m x 3.5m)

Various applications had been received from local bodies and leaders for considering a

provision of PUP between Km 113-114 near village Dabhor for smooth connectivity for the

nearby villagers as the stretch falls under high embankment zone due to ROB-3 and Major

Bridge 113+160 and there exist access roads on both sides of the highway. The work has

been stopped by the representatives of local villagers for want of an Underpass.

Independent Engineer after conducting a detailed study of the area and 24 hr traffic survey

has submitted a proposal for necessity of an PUP at Ch. 113+306 vide its letter

ICT/IC/IND/NH-8D/NHAI-PD/933 dt 31.03.2014

Page 210 of 246

Page 18: Jetpur–Somnath Project (NH – 8D) - Online PIU ...nhai.org.in/spw/ConcessionaireDetails/MPR June-14 Part-6.pdf · Major Bridge construction, Highway works & protection ... GAD

MONTHLY PROGRESS REPORT – JUNE ’2014 Jetpur - Somnath Section of NH-8D

4 L a n i n g o f J e t p u r - S o m n a t h S e c t i o n ( K m . 0 . 0 0 0 t o 1 2 7 . 6 0 0 ) o f N H - 8 D i n t h e S t a t e o f G u j a r a t o n D B F O P a t t e r n u n d e r N H D P P h a s e I I I

Preliminary Cost estimate submitted by Concessionaire was reviewed by Independent

Engineer and the recommendation was submitted through letter no. ICT:655:NCS:4817 dt

02 May 14 with an indicative financial implication of Rs. 87.26 Lakhs.

Manager (T) for CGM (T) & RO-Gujarat has sent recommendation to NHAI, HQ for In

principle approval of the competent authority through Letter no. NHAI/12013/2/2010-RO-

GNR/Tech./Jet-Som/490 dt 23.05.2014.

NHAI has approved thru vide letter No. NHAI/11012/I/ Jetpur-Somnath/NH-8D/2013/190

dt 16.06.2014.

Page 211 of 246

Page 19: Jetpur–Somnath Project (NH – 8D) - Online PIU ...nhai.org.in/spw/ConcessionaireDetails/MPR June-14 Part-6.pdf · Major Bridge construction, Highway works & protection ... GAD

Type of

Construction

Side

Excavation

& PCC

Pipe

Laying

Head

WallMisc

A. Pipe Culvert

65.200 65+200 1 X 1.2 2 Lane LHS 23-Jan-14 27-Jan-14 31-Jan-14

65.200 65+200 1 X 1.2 2 Lane RHS 17-Dec-13 21-Dec-13 31-Dec-13

67.040 67+350 1 X 1.2 2 Lane LHS 1-Sep-13 4-Sep-13 9-Sep-13

67.040 67+350 1 X 1.2 2 Lane RHS 6-Jun-13 25-Jun-13 9-Sep-13

67.934 67+934 1 X 1.2 2 Lane LHS 18-Jul-13 10-Aug-13 19-Aug-13

67.934 67+934 1 X 1.2 2 Lane RHS 14-Sep-13 18-Sep-13 8-Oct-13

69.120 69+120 1 X 1.2 2 Lane LHS

69.120 69+120 1 X 1.2 2 Lane RHS

70.620 70+620 1 X 1.2 2 Lane LHS

70.620 70+620 1 X 1.2 2 Lane RHS

71.225 71+325 1 X 1.2 2 Lane LHS 20-Jul-13 30-Jul-13 25-Oct-13

71.225 71+325 1 X 1.2 2 Lane RHS 4-Jun-13 5-Jul-13 11-Jul-13

71.700 71+748 1 X 1.2 2 Lane LHS 1-Jun-13 6-Jun-13 19-Jul-13

71.700 71+748 1 X 1.2 2 Lane RHS 16-Jun-13 19-Jul-13 26-Jul-13

Available

1 Available

Up to Date Work

S NoDesign

Chainage

Drawing

ChainageGFC status

Span

Arrangement

2 Available

Change of Scope - Strip Chart of Pipe Culverts

3 Available

4 Available

5 Available

6 Available

7

Page 212 of 246

Page 20: Jetpur–Somnath Project (NH – 8D) - Online PIU ...nhai.org.in/spw/ConcessionaireDetails/MPR June-14 Part-6.pdf · Major Bridge construction, Highway works & protection ... GAD

Type of

Construction

Side

Excavation

& PCC

Pipe

Laying

Head

WallMisc

Up to Date Work

S NoDesign

Chainage

Drawing

ChainageGFC status

Span

Arrangement

Change of Scope - Strip Chart of Pipe Culverts

LHS 7-Mar-14 14-Mar-14 29-Mar-14

RHS 9-May-14 31-Mar-14 16-May-14

110+812 110+812 3 X 1.2 2 Lane LHS 2-Dec-13 7-Dec-13 31-Dec-13

110+812 110+812 3 X 1.2 2 Lane RHS 5-Dec-13 8-Jan-14 17-Jan-14

10 119.794 119+794 Available 2 X 0.9 4 Lane+SR BHS 15-Jun-14

LHS 19-Feb-14 21-Jun 8-Mar-14

RHS 26-Feb-14 21-Jun-14 30-Jun-14

4 Lane+SR110.499 110+501 Available 2 X 1.2

4 LaneAvailable120+640120.63211 3 X 1.2

9 Available

8

Page 213 of 246

Page 21: Jetpur–Somnath Project (NH – 8D) - Online PIU ...nhai.org.in/spw/ConcessionaireDetails/MPR June-14 Part-6.pdf · Major Bridge construction, Highway works & protection ... GAD

Type of

Constructio

n

Element SideExcavation

& Foundation

Wall /

abutmentSuper Str Misc.

1 Additional Available 04+185 1x2 4 lane 2 2 2 -

LHS 20-Sep-13 30-Sep-13 7-Oct-13 -

RHS 12-Oct-13 16-Oct-13 23-Oct-13 -

2 Additional Available 04+420 1x4 4 lane 2 4 2 -

LHS 16-Mar-13 5-Apr-13 5-Jun-13 -

RHS 20-Mar-13 17-Apr-13 27-Jul-13 -

TOTAL 4 6 4 0

Change of Scope - Strip Chart of Box Culverts

S NoDesign

ChainageDrawing

Drawing

Chainage

Span

Arrange

ment

Total Scope (Quantity)

Page 214 of 246

Page 22: Jetpur–Somnath Project (NH – 8D) - Online PIU ...nhai.org.in/spw/ConcessionaireDetails/MPR June-14 Part-6.pdf · Major Bridge construction, Highway works & protection ... GAD

Type of

ConstructionSide

Excavation

& Foundation

Wall /

abutmentSuper Str Misc.

1 3+800 1 x 5 x 3.5 4 lane 2 2 2 0

LHS 25-Nov-13 17-Dec-13 24-Dec-13

RHS 30-Nov-13 3-Jan-14 15-Jan-14

2 113+305 1 x 5.8 x 3.5 4 lane 2 2 0 0

LHS 23/Jun/14 30-Jun-14

RHS 28-Apr-14 11-Jun-14

Change of Scope - Strip Chart for PUP

S NoDrawing

Chainage

Span

Arrangement

Total Scope (Quantity)

Page 215 of 246

Page 23: Jetpur–Somnath Project (NH – 8D) - Online PIU ...nhai.org.in/spw/ConcessionaireDetails/MPR June-14 Part-6.pdf · Major Bridge construction, Highway works & protection ... GAD

Type of

Constructi

on

SideExcavation

& Foundation

Wall /

abutmentSuper Str Misc.

1 5+920 1x10x6.0 4 lane 2 2 2 0

LHS 3-Oct-13 8-Nov-13 12-Nov-13

RHS 14-Feb-14 14-Mar-14 24-Mar-14

2 46+180 1x10x10.0 4 lane 2 2 2 0

LHS 22-Oct-13 9-Nov-13 12-Nov-13

RHS 28-Apr-14 21-May-14 26-May-14

TOTAL #REF! #REF! #REF! #REF!

Change of Scope - Strip Chart of VUP

S NoDrawing

Chainage

Span

Arrangement

Total Scope (Quantity)

Page 216 of 246

Page 24: Jetpur–Somnath Project (NH – 8D) - Online PIU ...nhai.org.in/spw/ConcessionaireDetails/MPR June-14 Part-6.pdf · Major Bridge construction, Highway works & protection ... GAD

MONTHLY PROGRESS REPORT – JUNE ’2014 Jetpur - Somnath Section of NH-8D

ANNEXURE-13

EXTENSION OF TIME

4 Laning of Jetpur - Somnath Section (Km.0.000 to 127.600) of NH-8D in the State of Gujarat on DBFO Pattern under NHDP Phase III

Page 217 of 246

Page 25: Jetpur–Somnath Project (NH – 8D) - Online PIU ...nhai.org.in/spw/ConcessionaireDetails/MPR June-14 Part-6.pdf · Major Bridge construction, Highway works & protection ... GAD

MONTHLY PROGRESS REPORT – JUNE ’ 2014 Jetpur - Somnath Section of NH-8D

4 L a n i n g o f J e t p u r - S o m n a t h S e c t i o n ( K m . 0 . 0 0 0 t o 1 2 7 . 6 0 0 ) o f N H -8 D i n t h e S t a t e o f G u j a r a t o n D B F O P a t t e r n u n d e r N H D P P h a s e I I I

Notice for Extension of Time

1. Entitlement of Concessionaire to Extension of Time ("EoT-I'') due to delays in the scheduled four-laning date caused by delayed delivery of land (as of 28 Feb ‘13 -Clause I 0.3.4, I 0.3.5, 12.4.1, 12.4.2, 35.2, 35.3 and 35. 6 and Schedule-G of CA

The appointed date for the project was delayed considerably due to delays in fulfilling CP's

by NHAI in terms of delays in land acquisition. MoEF clearances and other clearances and

the appointed date for the Project was finally declared as 31 March 2012 vide NHAI Letter

No. NHAI/BOT/DBF0/11019/02/07/27425 dt 12 April 2012. The appointed date declaration

thus happened almost 14 months after signing of the CA (and almost 19 months after bid

submission) against the stipulated period of 180 days (approximately 6 months) specified in

CA.

Clause 1 2.4.1 of the CA mandates that 910th day from the appointed date shall be the

"Scheduled Four-Laning Date''. During the meeting on 27 Mar ‘12 with NHAI for

discussions on 'Appointed Date', it was informed to Concessionaire that Land

Acquisition was in a fairly advance stage and FAC clearance for diversion of protected

forest had already been obtained on 24 Feb ‘12. Thus it was reasonably expected that

balance land shall be made available to us within 90 days of appointed date in compliance

with the provisions of clause I0.3.4 of CA.

Concessionaire have been regularly apprising NHAI and IE about this alarming position of

land availability through various communications including the key Issues requiring urgent

actions from NHAI to mitigate the delays in terms of clause 35.6 of CA. However

concessionaire has been severely constrained in his efforts for project execution due

to non-availability of RoW for the land required for the project due to various

factors and has caused irreparable damages to the project schedule.

In view of above, Concessionaire has submitted application for extension of time in terms

of clause 10.3.5 of CA for the delays occurred in the Project till 28 Feb 13 thru letter No.

JSTPL/ IE/ EOT-I/2013 dt 08 March 13 and requested to approve an interim extension of

project completion Schedule in terms of Schedule G, as above for a minimum period of

180 days (Six months).

Further these delays to the Project Completion Schedule and four-laning date will

also affect the COD for the project in terms of clause 15.1 of CA and since these

delays have happened due to breaches on the part of NHAI to provide adequate

RoW for project land as foreseen in the CA, hence also requeste d to grant an

equivalent extension of Concession period in terms of clause 35.3 of CA. IE has

reviewed the application and forwarded the recommendation to NHAI for further

approval. Now, Action from Authority is awaited.

Page 218 of 246

Page 26: Jetpur–Somnath Project (NH – 8D) - Online PIU ...nhai.org.in/spw/ConcessionaireDetails/MPR June-14 Part-6.pdf · Major Bridge construction, Highway works & protection ... GAD

MONTHLY PROGRESS REPORT – JUNE ’2014 Jetpur - Somnath Section of NH-8D

4 L a n i n g o f J e t p u r - S o m n a t h S e c t i o n ( K m . 0 . 0 0 0 t o 1 2 7 . 6 0 0 ) o f N H -8 D i n t h e S t a t e o f G u j a r a t o n D B F O P a t t e r n u n d e r N H D P P h a s e I I I

2. Entitlement of Concessionaire to Extension of Time ("EoT'') due to affected by the Force Majeure Event (as of 14 Sep I 3 -Clause 12.4.1, 12.4.2, 34.2, 34.5 and 34. 6 and Schedule-G of CA)

As the project has been witnessed by heavy rainfalls during the on-going monsoon season,

which shall be considered as extremely adverse weather conditions under clause 34.2 of

CA. This heavy rainfall is severely impaired all the works at site including borrow areas

operation, over moist of already laid earth layers, stacked materials of aggregate, stone

dust and sand, which was led to non-execution of any kind of pavement works including

Asphalt works.

Therefore, Concessionaire has requested thru letter no. JSTPL/2013/284 dt 14 Sep ’13 to

consider a minimum entitlement of extension of time by 2.25 months as on 14 Sep ’13, in

terms of Clause 34.6.2 (a) of CA.

3. Entitlement of Concessionaire to Extension of Time ("EoT-II'') due to

delays occurred (till 31 Dec ’13) in handing over ROW for the project at

various stretches due to delay in Land Acquisition and possession thru letter

No. JSTPL/IE/EOT dt 15 Feb ’14.

Delays occurred in the project till Feb’13 due to various reasons as follows:

a. Delays in handing over RoW for the land required for the Project at various

stretches due to delays in Land Acquisition and possession

b. Delays in handing over RoW for the land required for four (4) Villages of Choki,

Bhiyal, Kathrota & Tantivela in a length of 9.6 km due to delays in Land Acquisition

c. Inordinate delays in handing over land at Pedla Village, which has severely affected

the Project works in the stretch of Jetpur Bypass and the surrounding areas

starting from Km 0.000 to km. 11.150 (villages of Navagadh, Pedla, Jetalsar, Navi

Sakli and June Sakli)

d. Delays in the stretch from Km. 99+580 to Km 110+500 due to Special Civil

Application No. 9269 of 2012 against Land Acquisition by NHAI in Six (6) Villages

of Simar, Shukpur, Dari, Supasi, Sidokar, & Kindarwa.

e. Delays in land acquisition and availability of RoW for Junagadh bypass land as per

the alignment proposed in CA.

f. Delays due to change in proposed alignment and delayed approval of revised

alignment for Keshod bypass (due to local representation) leading to revision in LA

requirements and delays in handing over RoW for the land in Keshod Bypass.

g. Delays in land Acquisition due to missing 3D for 27 Villages (missing survey

numbers from earlier published 3D) causing non-availability of RoW for the land

stretches in the affected areas.

h. Delays due to non-availability of RoW for the Toll Plazas (including Traffic Aid Post

& Medical Aid Posts) due to delays in Land Acquisition for the same

i. Delay in start of work for construction of ROB due to non-availability of RoW for

ROB land

j. Delays in handing over RoW for the lane in the stretch from Km. 9+000 to Km.

35+000 due to notice received from DCF for the consent of NBWL

k. Delays in cutting of trees in the non-notified protected forest in the stretch from

Km. 11+120 to Km 20+850 and Km 112+600 t Km 122+130 due to the PIL’s (Writ

Page 219 of 246

Page 27: Jetpur–Somnath Project (NH – 8D) - Online PIU ...nhai.org.in/spw/ConcessionaireDetails/MPR June-14 Part-6.pdf · Major Bridge construction, Highway works & protection ... GAD

MONTHLY PROGRESS REPORT – JUNE ’2014 Jetpur - Somnath Section of NH-8D

4 L a n i n g o f J e t p u r - S o m n a t h S e c t i o n ( K m . 0 . 0 0 0 t o 1 2 7 . 6 0 0 ) o f N H -8 D i n t h e S t a t e o f G u j a r a t o n D B F O P a t t e r n u n d e r N H D P P h a s e I I I

Petition No. 99 of 2012 and Writ Petition No. 117 of 2012) causing delay in the

said process and affecting handing over of RoW for those stretches.

l. Delay in procurement of the approval from MoEF for diversion of 129.971 ha of

protected forest land causing delay in handing over of RoW for those land

stretches of the Project.

m. Delays in availability of RoW for the land affected by Utility Shifting of GETCO

n. Delays in availability of RoW for the land affected by Utility of PGVCL

o. Delays in availability of RoW for the land affected by Utility Shifting of GWSSB

The delays occurred due to land acquisition & possession as mentioned above, to the

project completion Schedule and four-laning date, will also affect the COD for the

project in terms of clause 15.1 of CA, and since these delays have happened due to

breaches on the part of NHAI to provide adequate RoW for project land as foreseen

in the CA, concessionaire requested Authority to grant an equivalent extension of time

of Concession Period in terms of clause 35.3 of CA.

PD-NHAI has recommended 96 days EOT (addition to EOT-I recommendation) i.e. shifting of Milestone –IV up to 30th June ’15 to the Authority through letter no. NHAI/PIU/RJK/Jet-Som/2013/D-038 dt 27.03.2014. As RO, NHAI has raised certain observations on this, JSTPL has JSTPL submitted the clarifications to the observations raised by NHAI RO through letter no. JSTPL/IE/991/2014 dt 21 May 2014. Approval from NHAI is awaited for revision of Milestones and extension of Project Completion Schedule.

Page 220 of 246

Page 28: Jetpur–Somnath Project (NH – 8D) - Online PIU ...nhai.org.in/spw/ConcessionaireDetails/MPR June-14 Part-6.pdf · Major Bridge construction, Highway works & protection ... GAD

MONTHLY PROGRESS REPORT – JUNE ’2014 Jetpur - Somnath Section of NH-8D

ANNEXURE-14

WEATHER REPORT

4 Laning of Jetpur - Somnath Section (Km.0.000 to 127.600) of NH-8D in the State of Gujarat on DBFO Pattern under NHDP Phase III

Page 221 of 246

Page 29: Jetpur–Somnath Project (NH – 8D) - Online PIU ...nhai.org.in/spw/ConcessionaireDetails/MPR June-14 Part-6.pdf · Major Bridge construction, Highway works & protection ... GAD

DateMinimum

TempratureMaximum

TempratureHumidity Minimum

Humidity Maximum

Weather Clear/Cloudy

Rainfall in mm

Cum. Rainfall in mm

Remarks

1-June'14 39.0 39.0 25.0 51.0 Clear - -

2-June'14 41.2 41.2 23.0 49.0 Clear - -

3-June'14 41.5 41.5 26.0 53.0 Clear - -

4-June'14 42.0 42.0 26.0 52.0 Clear - -

5-June'14 40.6 40.6 27.0 54.0 Clear - -

6-June'14 41.7 41.7 29.0 57.0 Clear - -

7-June'14 40.2 40.2 27.0 55.0 Clear - -

8-June'14 39.6 39.6 25.0 52.0 Clear - -

09-June'14 38.9 38.9 24.0 49.0 Clear - -

10-June'14 38.2 38.2 23.0 44.0 Clear - -

11-June'14 38.6 38.6 25.0 47.0 Clear - -

12-June'14 36.9 36.9 25.0 49.0 Clear - -

13-June'14 36.2 36.2 23.0 53.0 Clowdy - -

14-June'14 36.8 36.8 23.0 54.0 Rainy 2 2

15-June'14 36.1 36.1 26.0 63.0 Rainy 18 20

16-June'14 33.6 33.6 24.0 68.0 Clowdy - 20

17-June'14 34.7 34.7 23.0 60.0 Clear - 20

18-June'14 33.5 33.5 23.0 59.0 Clear - 20

19-June'14 35.5 35.5 23.0 59.0 Clear - 20

20-June'14 35.8 35.8 24.0 57.0 Clear - 20

21-June'14 35.2 35.2 24.0 61.0 Clear - 20

22-June'14 35.1 35.1 23.0 58.0 Clear - 20

23-June'14 35.1 35.1 26.0 61.0 Clear - 20

24-June'14 34.6 34.6 24.0 55.0 Clear - 20

25-June'14 35.2 35.2 23.0 57.0 Clear - 20

26-June'14 35.1 35.1 28.0 53.0 Clear - 20

27-June'14 36.2 36.2 25.0 52.0 Clear - 20

28-June'14 35.8 35.8 26.0 53.0 Clear - 20

29-June'14 35.1 35.1 24.0 51.0 Clowdy - 20

30-June'14 35.6 35.6 28.0 52.0 Clear - 20

20.0 mm

2201.3 mm

2221.3 mm

Upto Previous Month Cumulative Rail Faill

Cumulative Rainfall till date

Project :- Four Laning of Jetpur-Somnath Section of NH 8D from Km 0.000 to 127.600 (Design Length 123.454) in the State) of

Gujarat under NHDP Phase III on BOT (Toll) Basis under DBFOT Pattern.

WEATHER REPORTMonth of June-2014 Package No.-1 (Chowki Camp)

This month total Rain fall

JETPUR SOMNATH TOLLWAYS PVT. LTD.

Page 222 of 246

Page 30: Jetpur–Somnath Project (NH – 8D) - Online PIU ...nhai.org.in/spw/ConcessionaireDetails/MPR June-14 Part-6.pdf · Major Bridge construction, Highway works & protection ... GAD

DateMinimum

TempratureMaximum

TempratureHumidity Minimum

Humidity Maximum

Weather Clear/Cloudy

Rainfall in mm

Cum. Rainfall in mm

Remarks

1-June'14 31.0 37.7 38.0 59.0 Sunny - -

2-June'14 30.9 40.4 37.0 60.0 Sunny - -

3-June'14 31.1 39.6 32.0 57.0 Suny - -

4-June'14 31.6 44.2 30.0 56.0 Sunny - -

5-June'14 30.4 42.9 35.0 59.0 Clear - -

6-June'14 29.1 39.6 32.0 65.0 Clear - -

7-June'14 30.9 38.4 34.0 60.0 Clear - -

8-June'14 30.4 39.2 35.0 58.0 Clear - -

09-June'14 31.6 38.5 21.0 55.0 Clear - -

10-June'14 32.2 41.0 25.0 57.0 Clear - -

11-June'14 31.7 42.6 29.0 64.0 Clear 1.00 1.00

12-June'14 30.5 40.4 27.0 59.0 Clear 2.00 3.00

13-June'14 31.1 38.9 24.0 60.0 Clear 19.50 22.50

14-June'14 30.6 34.0 43.0 73.0 Rainy 270.00 292.50

15-June'14 28.4 33.5 65.0 83.0 Rainy 30.00 322.50

16-June'14 29.6 34.2 73.0 80.0 Rainy - 322.50

17-June'14 30.1 34.7 70.0 84.0 Cloudy - 322.50

18-June'14 29.5 33.8 52.0 79.0 Cloudy - 322.50

19-June'14 29.7 33.4 50.0 74.0 Cloudy - 322.50

20-June'14 29.9 34.3 69.0 81.0 Cloudy - 322.50

21-June'14 30.5 33.9 66.0 73.0 Cloudy - 322.50

22-June'14 29.2 32.1 62.0 78.0 Cloudy - 322.50

23-June'14 29.8 33.3 49.0 82.0 Clear - 322.50

24-June'14 29.6 33.8 47.0 68.0 Clear - 322.50

25-June'14 29.5 33.6 49.0 67.0 Cloudy - 322.50

26-June'14 28.4 34.1 41.0 72.0 Clear - 322.50

27-June'14 30.5 35.4 44.0 77.0 Clear - 322.50

28-June'14 29.3 35.1 40.0 73.0 Clear - 322.50

29-June'14 29.7 35.6 34.0 68.0 Clear - 322.50

30-June'14 29.5 35.7 39.0 71.0 Clear - 322.50

322.50 mm

2959.60 mm

3282.10 mm

Upto Previous Month Cumulative Rail Faill

Cumulative Rainfall till date

Project :- Four Laning of Jetpur-Somnath Section of NH 8D from Km 0.000 to 127.600 (Design Length 123.454) in the State)

of Gujarat under NHDP Phase III on BOT (Toll) Basis under DBFOT Pattern.

WEATHER REPORTMonth of June-2014 Package No.-2 (Shapur Camp)

This month total Rain fall

JETPUR SOMNATH TOLLWAYS PVT. LTD.

Page 223 of 246

Page 31: Jetpur–Somnath Project (NH – 8D) - Online PIU ...nhai.org.in/spw/ConcessionaireDetails/MPR June-14 Part-6.pdf · Major Bridge construction, Highway works & protection ... GAD

DateMinimum

Temprature

Maximum

Temprature

Humidity

Minimum

Humidity

Maximum

Weather

Clear/Cloudy

Rainfall

in mm

Cum.

Rainfall

in mm

Remarks

1-June'14 22.00 39.00 54.00 71.00 Clear 0 0

2-June'14 21.50 38.50 53.00 72.00 Clear 0 0

3-June'14 22.50 39.50 55.00 78.00 Clear 0 0

4-June'14 22.00 37.20 52.00 77.00 Clear 0 0

5-June'14 23.00 37.20 55.00 71.00 Clear 0 0

6-June'14 25.00 35.90 51.00 71.00 Clear 0 0

7-June'14 26.00 37.00 56.00 76.00 Clear 0 0

8-June'14 25.00 36.00 55.00 78.00 Clear 0 0

09-June'14 28.00 36.00 56.00 79.00 Clear 0 0

10-June'14 29.00 36.00 40.00 68.00 Clear 0 0

11-June'14 29.80 35.90 35.00 56.00 Clear 0 0

12-June'14 29.70 34.70 42.00 67.00 CLOUDY 0 0

13-June'14 29.40 35.00 42.00 70.00 CLOUDY 0 0

14-June'14 28.30 32.30 42.00 77.00 RAINY 12 12

15-June'14 27.70 31.60 42.00 84.00 RAINY 130 142

16-June'14 28.30 31.60 58.00 86.00 RAINY 2.4 144.4

17-June'14 28.50 31.60 52.00 76.00 CLOUDY 0 144.4

18-June'14 29.10 32.60 51.00 76.00 RAINY 1.5 145.9

19-June'14 29.50 33.00 48.00 73.00 CLOUDY 0 145.9

20-June'14 29.40 33.30 51.00 73.00 CLOUDY 0 145.9

21-June'14 29.10 32.60 49.00 66.00 Clear 0 145.9

22-June'14 29.70 33.00 48.00 66.00 Clear 0 145.9

23-June'14 29.40 32.90 47.00 67.00 Clear 0 145.9

24-June'14 29.10 33.50 46.00 66.00 Clear 0 145.9

25-June'14 28.50 33.20 44.00 71.00 Clear 0 145.9

26-June'14 29.40 32.90 44.00 69.00 Clear 0 145.9

27-June'14 29.40 33.90 42.00 64.00 Clear 0 145.9

28-June'14 29.70 33.20 41.00 62.00 Clear 0 145.9

29-June'14 29.20 33.60 42.00 64.00 Clear 0 145.9

30-June'14 29.30 33.10 41.00 64.00 Clear 0 145.9

145.9 mm

2520.4 mm

2666.3 mm

Upto Previous Month Cumulative Rail Faill

Cumulative Rainfall till date

Project :- Four Laning of Jetpur-Somnath Section of NH 8D from Km 0.000 to 127.600 (Design Length 123.454) in the State)

of Gujarat under NHDP Phase III on BOT (Toll) Basis under DBFOT Pattern.

WEATHER REPORT

Month of June-2014 Package No.-3 (Juthal Camp)

This month total Rain fall

JETPUR SOMNATH TOLLWAYS PVT. LTD.

Page 224 of 246

Page 32: Jetpur–Somnath Project (NH – 8D) - Online PIU ...nhai.org.in/spw/ConcessionaireDetails/MPR June-14 Part-6.pdf · Major Bridge construction, Highway works & protection ... GAD

DateMinimum

Temprature

Maximum

Temprature

Humidity

Minimum

Humidity

Maximum

Weather

Clear/Cloudy

Rainfall

in mm

Cum.

Rainfall

in mm

Remarks

1-June'14 29.10 35.10 64.00 88.00 Clear 0 0

2-June'14 29.20 35.50 61.00 89.00 Clear 0 0

3-June'14 29.00 35.40 60.00 89.00 Clear 0 0

4-June'14 28.90 34.40 71.00 94.00 Clear 0 0

5-June'14 28.90 35.10 64.00 94.00 Clear 0 0

6-June'14 29.20 34.90 64.00 92.00 Clear 0 0

7-June'14 28.90 35.30 61.00 92.00 Clear 0 0

8-June'14 29.10 35.10 63.00 84.00 Clear 0 0

9-June'14 29.60 35.20 61.00 93.00 Clear 0 0

10-June'14 29.90 35.40 55.00 94.00 Clear 0 0

11-June'14 29.20 34.60 62.00 87.00 Clear 0 0

12-June'14 29.00 34.40 65.00 86.00 Cloudy+ Drizzling 0 0

13-June'14 29.10 33.30 70.00 87.00 Cloudy+ Drizzling 0 0

14-June'14 28.70 32.50 74.00 96.00 Cloudy+ Drizzling 0 0

15-June'14 28.00 31.50 88.00 99.00 Rainy 175 175

16-June'14 28.30 32.50 81.00 99.00 Cloudy+ Drizzling 0 175

17-June'14 28.00 32.60 73.00 99.00 Rainy 4 179

18-June'14 28.10 32.40 81.00 99.00 Rainy 2 181

19-June'14 29.10 33.10 74.00 96.00 Clear 0 181

20-June'14 29.40 32.80 78.00 94.00 Clear 0 181

21-June'14 29.30 37.50 66.00 99.00 Clear 0 181

22-June'14 29.70 33.80 69.00 87.00 Clear 0 181

23-June'14 29.10 33.60 70.00 89.00 Clear 0 181

24-June'14 28.70 33.80 69.00 86.00 Clear 0 181

25-June'14 29.50 33.70 66.00 83.00 Clear 0 181

26-June'14 29.20 33.90 66.00 84.00 Clear 0 181

27-June'14 29.30 34.50 62.00 85.00 Clear 0 181

28-June'14 29.40 34.10 64.00 83.00 Clear 0 181

29-June'14 29.30 34.10 63.00 81.00 Clear 0 181

30-June'14 29.20 34.00 63.00 82.00 Clear 0 181

181.0 mm

2592.0 mm

2773.0 mm

Upto Previous Month Cumulative Rail Faill

Cumulative Rainfall till date

Project :- Four Laning of Jetpur-Somnath Section of NH 8D from Km 0.000 to 127.600 (Design Length 123.454) in the State) of

Gujarat under NHDP Phase III on BOT (Toll) Basis under DBFOT Pattern.

WEATHER REPORT

Month of June-2014 Package No.-4 (Shantipura Camp)

This month total Rain fall

JETPUR SOMNATH TOLLWAYS PVT. LTD.

Page 225 of 246

Page 33: Jetpur–Somnath Project (NH – 8D) - Online PIU ...nhai.org.in/spw/ConcessionaireDetails/MPR June-14 Part-6.pdf · Major Bridge construction, Highway works & protection ... GAD

MONTHLY PROGRESS REPORT – JUNE ’2014 Jetpur - Somnath Section of NH-8D

ANNEXURE-15

CORRESPONDANCE

4 Laning of Jetpur - Somnath Section (Km.0.000 to 127.600) of NH-8D in the State of Gujarat on DBFO Pattern under NHDP Phase III

Page 226 of 246

Page 34: Jetpur–Somnath Project (NH – 8D) - Online PIU ...nhai.org.in/spw/ConcessionaireDetails/MPR June-14 Part-6.pdf · Major Bridge construction, Highway works & protection ... GAD

MONTHLY PROGRESS REPORT – JUNE ’2014 Jetpur - Somnath Section of NH-8D

ICT - INWARD

LETTERS

4 Laning of Jetpur - Somnath Section (Km.0.000 to 127.600) of NH-8D in the State of Gujarat on DBFO Pattern under NHDP Phase III

Page 227 of 246

Page 35: Jetpur–Somnath Project (NH – 8D) - Online PIU ...nhai.org.in/spw/ConcessionaireDetails/MPR June-14 Part-6.pdf · Major Bridge construction, Highway works & protection ... GAD

SR

NO.LETTER NO. SUBJECT

INWARD FROM,

ADDRESSED TO JSTPLREMARKS

1ICT/655/NCS/5865

Dt: 02/06/14

Regarding submission of design and drawings of

ROB-4 at ch. 118+938

President, ICT Pvt. Ltd., New

DelhiDrawing Approval

2

ICT/IC/NHAI/IND/NH-

8D/JSTPL/1049

Dt: 05/06/14

New Approval for Borrow Material ATL, ICT Pvt. Ltd., Junagadh Filed for Record

3

ICT/IC/NHAI/IND/NH-

8D/JSTPL/1050

Dt: 05/06/14

Regarding Borrow material ATL, ICT Pvt. Ltd., JunagadhReplied vide Letter No.

JSTPL/IE/1001/2014 Dt: 05/06/14

4

ICT/IC/NHAI/IND/NH-

8D/JSTPL/1053

Dt: 11/06/14

Submission of Financial proposals TL, ICT Pvt. Ltd., Junagadh In Process

5

ICT/IC/NHAI/IND/NH-

8D/JSTPL/1054

Dt: 12/06/14

Schedule of joint site inspection as per the

concession agreementTL, ICT Pvt. Ltd., Junagadh Filed for Record

6

ICT/IC/NHAI/IND/NH-

8D/JSTPL/1055

Dt: 11/06/14

Deficiencies observed in construction TL, ICT Pvt. Ltd., Junagadh In Process

7

ICT/IC/NHAI/IND/NH-

8D/JSTPL/1059

Dt: 13/06/14

Routine Inspection by this office TL, ICT Pvt. Ltd., Junagadh In Process

8ICT/655/NCS/6410

Dt: 13/06/14

Regarding submission Detailed Design and Drawings

of ROB-4 @ ch. 118+938

President, ICT Pvt. Ltd., New

DelhiDrawing Approval

IE - INWARD

Page 228 of 246

Page 36: Jetpur–Somnath Project (NH – 8D) - Online PIU ...nhai.org.in/spw/ConcessionaireDetails/MPR June-14 Part-6.pdf · Major Bridge construction, Highway works & protection ... GAD

SR

NO.LETTER NO. SUBJECT

INWARD FROM,

ADDRESSED TO JSTPLREMARKS

IE - INWARD

9ICT/655/NCS/6413

Dt; 13/06/14

Reg. Submission of Bus Bay Drawing and Truck Lay

with pavement composition for approval

President, ICT Pvt. Ltd., New

DelhiDrawing Approval

10

ICT/IC/NHAI/IND/NH-

8D/JSTPL/1061

Dt: 14/06/14

Independent Tests by the Independent consultant TL, ICT Pvt. Ltd., Junagadh Filed for Record

11ICT/655/NCS/6591

Dt: 16/06/14

Reg. submission of detail design of minor junctions

(3 nos.) for approval

President, ICT Pvt. Ltd., New

DelhiDrawing Approval

12

ICT/IC/NHAI/IND/NH-

8D/JSTPL/1064

Dt: 18/06/14

Scheduled service road from ch. 55+650 to ch.

55+900 LHSTL, ICT Pvt. Ltd., Junagadh In Process

13

ICT/IC/NHAI/IND/NH-

8D/JSTPL/1067

Dt: 21/06/14

Proposed pre casting of Kerb at outer edge of

service roadTL, ICT Pvt. Ltd., Junagadh Drawing Approval

14

ICT/IC/NHAI/IND/NH-

8D/JSTPL/1071

Dt: 21/06/14

Drainage design in the vicinity of Flyover at zero

pointTL, ICT Pvt. Ltd., Junagadh Design Submission

15

ICT/IC/NHAI/IND/NH-

8D/JSTPL/1072

Dt: 23/06/14

Maintenance of existing road TL, ICT Pvt. Ltd., Junagadh In Process

16

ICT/IC/NHAI/IND/NH-

8D/JSTPL/1073

Dt: 23/06/14

Disposal of water in Village Bhanduri TL, ICT Pvt. Ltd., Junagadh

Replied by IE vide Letter no.

ICT/IC/NHAI/IND/NH-8D/NHAI-

PD/1076 Dt: 23/06/14

Page 229 of 246

Page 37: Jetpur–Somnath Project (NH – 8D) - Online PIU ...nhai.org.in/spw/ConcessionaireDetails/MPR June-14 Part-6.pdf · Major Bridge construction, Highway works & protection ... GAD

SR

NO.LETTER NO. SUBJECT

INWARD FROM,

ADDRESSED TO JSTPLREMARKS

IE - INWARD

17

ICT/IC/NHAI/IND/NH-

8D/JSTPL/1074

Dt: 23/06/14

Yellowish lime material at earthen shoulder TL, ICT Pvt. Ltd., Junagadh In Process

18

ICT/IC/NHAI/IND/NH-

8D/JSTPL/1077

Dt: 24/06/14

Regarding dispose the water at R. S. No. 10/P, Vllage

: Navi Sakli, Tal: Jetpur, Dist: RajkotTL, ICT Pvt. Ltd., Junagadh In Process

19

ICT/IC/NHAI/IND/NH-

8D/JSTPL/1083

Dt: 26/06/14

Electrical Utility Shifting - First (1st) RA bill of

Prabhas Patan subdivisionTL, ICT Pvt. Ltd., Junagadh In Process

20

ICT/IC/NHAI/IND/NH-

8D/JSTPL/1084

Dt: 26/06/14

Electrical Utility Shifting - First (1st) RA bill of

Junagadh Rural subdivisionTL, ICT Pvt. Ltd., Junagadh In Process

21

ICT/IC/NHAI/IND/NH-

8D/JSTPL/1086

Dt: 25/06/14

Regarding points discussed during the site visit of

the IETL, ICT Pvt. Ltd., Junagadh In Process

22

ICT/IC/NHAI/IND/NH-

8D/JSTPL/1087

Dt: 28/06/14

Removal of religious structure with right of way TL, ICT Pvt. Ltd., Junagadh In Process

23

ICT/IC/NHAI/IND/NH-

8D/JSTPL/1088

Dt: 30/06/14

Submission of Test Results of Trial stretch for

Construction of Embankment using Fly Ash at ch.

118+450 to 118+500 LHS

TL, ICT Pvt. Ltd., Junagadh Filed for Record

Page 230 of 246

Page 38: Jetpur–Somnath Project (NH – 8D) - Online PIU ...nhai.org.in/spw/ConcessionaireDetails/MPR June-14 Part-6.pdf · Major Bridge construction, Highway works & protection ... GAD

MONTHLY PROGRESS REPORT – JUNE ’2014 Jetpur - Somnath Section of NH-8D

NHAI - INWARD

LETTERS

4 Laning of Jetpur - Somnath Section (Km.0.000 to 127.600) of NH-8D in the State of Gujarat on DBFO Pattern under NHDP Phase III

Page 231 of 246

Page 39: Jetpur–Somnath Project (NH – 8D) - Online PIU ...nhai.org.in/spw/ConcessionaireDetails/MPR June-14 Part-6.pdf · Major Bridge construction, Highway works & protection ... GAD

SR

NO.LETTER NO. SUBJECT

INWARD FROM,

ADDRESSED TO JSTPLREMARKS

1

NHAI/PIU/RJK/Jet-

Som/2013/D-1685

Dt: 02/06/14

Compliance report reg. DGM cum PD, NHAI, PIU, RajkotReplied vide Letter No.

JSTPL/2014/417 Dt: 30/06/14

2

NHAI/PIU/RJK/Jet-

Som/2013/D-1709

Dt: 03/06/14

Reg. site inspection of PD, NHAI dated on 04th

April 2014DGM cum PD, NHAI, PIU, Rajkot

Replied vide Letter No.

JSTPL/2014/404 Dt: 04/06/14

3

NHAI/PIU/RJK/F&A/2014/D-

1727

Dt: 04/06/14

Reimbursement of 50% Remuneration, costs &

Expenses to Independent ConsultantDGM cum PD, NHAI, PIU, Rajkot

Replied vide Letter No.

JSTPL/2014/413 Dt: 16/06/14

4

NHAI/PIU/RJK/NH

8D/2014/D-1732

Dt: 04/06/14

Regarding repair the existing bridge at R. S. No.

354, Village:Jetalsar, Tal: Jetpur, Dist: RajkotDGM cum PD, NHAI, PIU, Rajkot

Replied by IE vide letter

no.ICT/IC/NHAI/IND/NH-8D/ NHAI-

PD/1056 Dt: 10/06/14

5

NHAI/PIU/RJK/NH

8D/2014/D-1742

Dt: 05/06/14

Revised estimate for various crossing of pipeline

at various locationDGM cum PD, NHAI, PIU, Rajkot In Process

6

NHAI/PIU/RJK/NH

8D/2014/D-1743

Dt: 05/06/14

Revised estimate for damages occurred in Vadal

V.W. S. Scheme (Tal. Junagadh)DGM cum PD, NHAI, PIU, Rajkot In Process

7

NHAI/PIU/RJK/VTS/2014/D-

1764

Dt: 05/06/14

Vehicle Tracking system (VTS) with facility of

global Positioning System (GPS) to track

ambulance / cranes/route patrol vehicles

DGM cum PD, NHAI, PIU, Rajkot For information & compliance

NHAI - INWARD

Page 232 of 246

Page 40: Jetpur–Somnath Project (NH – 8D) - Online PIU ...nhai.org.in/spw/ConcessionaireDetails/MPR June-14 Part-6.pdf · Major Bridge construction, Highway works & protection ... GAD

SR

NO.LETTER NO. SUBJECT

INWARD FROM,

ADDRESSED TO JSTPLREMARKS

NHAI - INWARD

8

NHAI/PIU/RJK/NH-

8D/2014/D-1783

Dt: 11/06/14

Reg. to provide cirle at mulji bapa market ,

vanthali for solve the Traffic issue for public

safety

DGM cum PD, NHAI, PIU, Rajkot

Replied by IE vide letter

no.ICT/IC/NHAI/IND/NH-8D/ NHAI-

PD/1092 Dt: 30/06/14

9

NHAI/PIU/RJK/NH

8D/2014/D-1809

Dt: 12/06/14

Regarding fortnightly action taken report

regarding according to review meeting held by

Member (Admn.) , NHAI at Gandhidham,

Gujarat on 12.04.2014

DGM cum PD, NHAI, PIU, RajkotReplied vide Letter No.

JSTPL/2014/414 Dt: 17/06/14

10

NHAI/PIU/RJK/ROGNR/201

4/D-1810

Dt: 12/06/14

Advance prepared for proper maintenance

during monsoonDGM cum PD, NHAI, PIU, Rajkot In Process

11

NHAI/PIU/RJK/NH

8D/2014/D-1817

Dt: 13/06/14

Regarding revised proposal for grant of

permission for crossing pipeline under NH-8D

from Jetpur to Maliya in pkg (NC-42) based on

Narmada Canal water pipeline

DGM cum PD, NHAI, PIU, Rajkot In Process

12

NHAI/PIU/RJK/NH

8D/2014/D-1818

Dt: 13/06/14

Regarding revised proposal for grant of

permission for crossing pipeline under NH-8D

from Jetpur to Maliya in pkg (NC-42) based on

Narmada Canal water pipeline

DGM cum PD, NHAI, PIU, Rajkot In Process

13

NHAI/PIU/RJK/NH

8D/2014/D-1819

Dt: 13/06/14

Regarding revised proposal for grant of

permission for crossing pipeline under NH-8D

from Jetpur to Maliya in pkg (NC-42) based on

Narmada Canal water pipeline

DGM cum PD, NHAI, PIU, Rajkot

Replied by IE vide letter

no.ICT/IC/NHAI/IND/NH-8D/ NHAI-

PD/1089 Dt: 30/06/14

Page 233 of 246

Page 41: Jetpur–Somnath Project (NH – 8D) - Online PIU ...nhai.org.in/spw/ConcessionaireDetails/MPR June-14 Part-6.pdf · Major Bridge construction, Highway works & protection ... GAD

SR

NO.LETTER NO. SUBJECT

INWARD FROM,

ADDRESSED TO JSTPLREMARKS

NHAI - INWARD

14

NHAI/PIU/RJK/NH

8D/2014/D-1820

Dt: 13/06/14

Access permission and approval for terail outlet

abutting on NH-8D at km. 101.725 (Between

km. 101.700), LHS at R. S. No 36/P1/P1, Village :

Shantipura, Tal: Maliya, Dist: Junagadh in the

State of Gujarat

DGM cum PD, NHAI, PIU, Rajkot Addressed to IE for Action

15

NHAI/PIU/RJK/NH

8D/2014/D-1825

Dt: 14/06/14

Regarding to provide profile map and meter

chainage of R. s. No. 491/P2 & 491/P3 on keshod

Bypass

DGM cum PD, NHAI, PIU, Rajkot In Process

16

NHAI/PIU/RJK/NH

8D/2014/D-1832

Dt: 14/06/14

Regarding access application for new retail outlet

abutting on NH-8D at m. 48.622 (Between km.

48.600 to km 48.645), RHS at R. S. No. 20/4 at

Village : Kanja, Tal: Vanthali, Dist: Junagadh in the

state of Gujarat

DGM cum PD, NHAI, PIU, Rajkot

Replied by IE vide letter no.

ICT/IC/NHAI/IND/NH-8D/NHAI-

PD/1070 Dt: 21/06/14

17

NHAI/PIU/RJK/F&A/2014/D-

1854

Dt: 17/06/14

Reimbursement of 50% Remuneration, costs &

Expenses to Independent ConsultantDGM cum PD, NHAI, PIU, Rajkot

Replied vide Letter No.

JSTPL/2014/416 Dt: 27/06/14

18

NHAI/PIU/RJK/NH

8D/2014/D-1869

Dt: 21/06/14

Regardingresurvey at R. S. No. 1667/4, Village:

Prabhas-patanDGM cum PD, NHAI, PIU, Rajkot In Process

19

NHAI/PIU/RJK/Policy

Circular/2014/D-1884

Dt: 24/06/14

Guidelines for movement of over dimension /

over weight consignment (OD/ODC) on

National Highways

DGM cum PD, NHAI, PIU, Rajkot Filed for Record. Policy Matters

Page 234 of 246

Page 42: Jetpur–Somnath Project (NH – 8D) - Online PIU ...nhai.org.in/spw/ConcessionaireDetails/MPR June-14 Part-6.pdf · Major Bridge construction, Highway works & protection ... GAD

MONTHLY PROGRESS REPORT – JUNE ’2014 Jetpur - Somnath Section of NH-8D

ICT - OUTWARD

LETTERS

4 Laning of Jetpur - Somnath Section (Km.0.000 to 127.600) of NH-8D in the State of Gujarat on DBFO

Pattern under NHDP Phase III

Page 235 of 246

Page 43: Jetpur–Somnath Project (NH – 8D) - Online PIU ...nhai.org.in/spw/ConcessionaireDetails/MPR June-14 Part-6.pdf · Major Bridge construction, Highway works & protection ... GAD

SR

NO.LETTER NO. SUBJECT Addressed to REMARKS

1JSTPL/IE/999/2014

Dt: 02/06/14

Submission of Test Results of Trial Stretch

for Construction of Embankment using Fly

Ash at ch. 115+450 to ch. 118+500 LHS

ATL, ICT Pvt. Ltd.,

Junagadh

In Response to Letter No.

ICT/655/NCS/5676 Dt: 28/05/2014

ICT/655/NCS/…. Dt: 17/05/14

2JSTPL/IE/1000/2014

Dt: 04/06/14Maintenance of Existing Road

ATL, ICT Pvt. Ltd.,

Junagadh

In Response to Letter No.

ICT/IC/NHAI/IND/NH-8D/NHAI-PD/1000 Dt: 08/05/14

NHAI/PIU/RJK/Jet-Som/2013/D-1461 Dt: 07/05/14

NHAI/PIU/RJK/Jet-Som/2013/D-1367 Dt: 29/04/14

3JSTPL/IE/1001/2014

Dt: 05/06/14

Resubmission of Approval of additional

locations for Borrow Area - 2nos. (BA-16/P2

and BA-38/P3)

ATL, ICT Pvt. Ltd.,

Junagadh

In Response to Letter No.

ICT/IC/NHAI/IND/NH-8D/JSTPL/1050 Dt: 05/06/14

4JSTPL/IE/1002/2014

Dt: 05/06/14

Approval of additional quantity for aproved

borrow areas - 3 nos. (BA-40/P3, BA-32/P4

amd BA-25/p4

ATL, ICT Pvt. Ltd.,

JunagadhIntimation regarding Source Approval

5JSTPL/IE/1003/2014

Dt: 06/06/14

Submission of Monthly progress Report for

May 2014

ATL, ICT Pvt. Ltd.,

JunagadhMonthly Report as per CA

6JSTPL/IE/1004/2014

Dt: 06/06/14

Reg. Submission of revised drawing for crash

barrier with friction slab at RE wall locations

for approval

President, ICT Pvt.

Ltd., New Delhi

In Response to Letter No.

ICT/655/NCS/3459 Dt: 27/03/14

7JSTPL/IE/1005/2014

Dt: 11/06/14

Proposed new Pre-cast 60mm thick CC block

(M20) size 257 mm x 257mm)

TL, ICT Pvt. Ltd.,

Junagadh

IE - OUTWARD

Page 236 of 246

Page 44: Jetpur–Somnath Project (NH – 8D) - Online PIU ...nhai.org.in/spw/ConcessionaireDetails/MPR June-14 Part-6.pdf · Major Bridge construction, Highway works & protection ... GAD

SR

NO.LETTER NO. SUBJECT Addressed to REMARKS

IE - OUTWARD

8JSTPL/IE/1006/2014

Dt: 12/06/14

Reg. submission of Design and drawings of

ROB-4 at ch. 118+938

President, ICT Pvt.

Ltd., New Delhi

In Response to Letter No.

ICT/655/NCS/5865 Dt: 02/06/14

9JSTPL/IE/1007/2014

Dt: 12/06/14

Reg. submission of detail design of minor

junctions (3 nos.) for approval

President, ICT Pvt.

Ltd., New DelhiDrawing Submission

10JSTPL/IE/1008/2014

Dt: 14/06/14

Reg. casting of kilometer stones, Boundary

stones etc.

TL, ICT Pvt. Ltd.,

Junagadh

In Response to Letter No.

ICT/IC/NHAI/IND/NH-8D/JSTPL/928 Dt: 28/03/14

11JSTPL/IE/1009/2014

Dt: 17/06/14

Approval of Borrow Area 1 nos. for RE wall

Backfilling (BA-44/P1)

TL, ICT Pvt. Ltd.,

JunagadhIntimation regarding Source Approval

12JSTPL/IE/1010/2014

Dt: 19/06/14

Repair/Rehabilitation/widening of existing

bridges, regarding widening of foundation of

existing pier

TL, ICT Pvt. Ltd.,

Junagadh

In Response to Letter No.

ICT/IC/NHAI/IND/NH-8D/JSTPL/935 Dt: 03/04/14

13JSTPL/IE/1011/2014

Dt: 19/06/14

Compliance of observations by NHAI PD for

report on Joint site inspection

TL, ICT Pvt. Ltd.,

Junagadh

In Response to Letter No.

ICT/IC/NHAI/IND/NH-8D/NHAI-PD/1041 Dt: 29/05/14

ICT/IC/NHAI/IND/NH-8D/JSTPL/1043 Dt: 30/05/14

NHAI/PIU/RJK/NH 8D/2014/D-1664 Dt: 31/05/14

14JSTPL/IE/1012/2014

Dt: 19/06/14Pre-monsoon activities

TL, ICT Pvt. Ltd.,

Junagadh

In Response to Letter No.

ICT/IC/NHAI/IND/NH-8D/JSTPL/1030 Dt: 23/05/14

NHAI/PIU/RJK/GENERAL/2014/D-1625 Dt: 30/05/147

NHAI/PIU/RJK/Pre Mon/2014/D-1478 Dt: 09/05/14

15JSTPL/IE/1013/2014

Dt: 23/06/14

Approval of New and additional Quantity for

Borrow Areas 1 nos. additional Quantity (BA-

11/P2) and 1 nos. New (BA-18/P2)

TL, ICT Pvt. Ltd.,

JunagadhIntimation regarding Source Approval

Page 237 of 246

Page 45: Jetpur–Somnath Project (NH – 8D) - Online PIU ...nhai.org.in/spw/ConcessionaireDetails/MPR June-14 Part-6.pdf · Major Bridge construction, Highway works & protection ... GAD

SR

NO.LETTER NO. SUBJECT Addressed to REMARKS

IE - OUTWARD

16JSTPL/IE/1014/2014

Dt: 24/06/14

Road safety measures as was discussed during

the fourth IRF regional conference

recommendation "Accident prevention"

TL, ICT Pvt. Ltd.,

Junagadh

In Response to Letter No.

ICT/IC//NHAI/IND/NH-8D/JSTPL/1014 Dt: 20/05/14

IE/JSTPL/167 Dt: 26/02/13

17JSTPL/IE/1015/2014

Dt: 27/06/14

Regarding submission of RE wall arrangement

at ROB at ch. 112+938 for Somnath

approach from ch. 113+200 to ch. 113+264

President, ICT Pvt.

Ltd., New DelhiDrawing Submission

18JSTPL/IE/1016/2014

Dt: 28/06/14

Submission of revision in bys bays locations

between ch. 0+0010 to ch. 20+000 for

approval

TL, ICT Pvt. Ltd.,

Junagadh

19JSTPL/IE/1017/2014

Dt: 28/06/14

Regarding submission of revised median width

from ch. 49+080 to 49+420 for approval

TL, ICT Pvt. Ltd.,

Junagadh

In Response to Letter No.

ICT/IC/NHAI/IND/NH-8D/JSTPL/960 Dt: 21/04/14

20JSTPL/IE/1018/2014

Dt: 28/06/14

Revision in alignment between ch. 56+194 to

ch. 56+332 LHS to match with existing minor

bridge at ch. 56+259

TL, ICT Pvt. Ltd.,

Junagadh

In Response to Letter No.

ICT/IC/NHAI/IND/NH-8D/JSTPL/1012 Dt: 19/05/14

21JSTPL/IE/1019/2014

Dt: 30/06/14

Review submission of IE's monthly progress

Report for the month of May 2014 - reg.

TL, ICT Pvt. Ltd.,

Junagadh

In Response to Letter No.

ICT/IC/NHAI/IND/NH-8D/NHAI-PD/1075 Dt: 23/06/14

Page 238 of 246

Page 46: Jetpur–Somnath Project (NH – 8D) - Online PIU ...nhai.org.in/spw/ConcessionaireDetails/MPR June-14 Part-6.pdf · Major Bridge construction, Highway works & protection ... GAD

MONTHLY PROGRESS REPORT – JUNE ’2014 Jetpur - Somnath Section of NH-8D

N.H.A.I. - OUTWARD

LETTERS

4 Laning of Jetpur - Somnath Section (Km.0.000 to 127.600) of NH-8D in the State of Gujarat on DBFO Pattern under NHDP Phase III

Page 239 of 246

Page 47: Jetpur–Somnath Project (NH – 8D) - Online PIU ...nhai.org.in/spw/ConcessionaireDetails/MPR June-14 Part-6.pdf · Major Bridge construction, Highway works & protection ... GAD

SR

NO.LETTER NO. SUBJECT Addressed to REMARKS

1JSTPL/2014/403

Dt: 02/06/14

Regarding repair the road of Rajkot-Veraval

bypass which passes through Junagadh

DGM cum PD, NHAI,

PIU, Rajkot

In Response to Letter No.

NHAI/PIU/RJK/NH 8D/2014/D-1574 Dt: 22/05/14

NHAI/PIU/RJK/NH 8D/2014/D- Dt: 30/05/14

NHAI/PIU/RJK/NH 8D/2014/D-1196 Dt: 10/04/14

2JSTPL/2014/404

Dt: 04/06/14

Compliance Report on Joint Site inpsection caried

out by PD-NHAI on 04 Apr 2014

DGM cum PD, NHAI,

PIU, Rajkot

In Response to Letter No.

NHAI/PIU/RJK/Jet-Som/2013/D-1709 Dt: 03/06/14

ICT/IC/NHAI/IND/NH-8D/NHAI-PD/1035 Dt:06/05/14

ICT/655/NCS/5677 Dt: 28/05/14

3JSTPL/2014/405

Dt: 12/06/14Submission of Concession Fee

GM (Guj.), NHAI,

Dwarka, New Delhi

4JSTPL/2014/406

Dt: 12/06/14

Underground crossing of Existing overhead

Electrical lines - 1st RA bill of prabhas patan

subdivision

DGM cum PD, NHAI,

PIU, Rajkot

In Response to Letter No.

NHAI/PIU/RJK/PGVCL/2012/D-4359 Dt: 26/12/13

5JSTPL/2014/407

Dt: 12/06/14

Permission to lay OFC from km. 26.300 to km.

37.350route length 11.050+4 road crossing

(30x4=120 mrt) = 11.170 km. in Junagadh town

on NH-8D in the State of Gujarat

DGM cum PD, NHAI,

PIU, Rajkot

In Response to Letter No.

NHAI/PIU/RJK/NH-8D/2014/D-1506 Dt: 14/05/14

ICT/IC/NHAI/IND/NH-8D/NHAI-PD/1038 Dt: 28/05/14

6JSTPL/2014/408

Dt: 12/06/14

Request for an urgent meeting to finalize various

financial proposals related to COS items and

existing road maintenance works

Sh. Narendra Kumar,

IAS, Member (Admin),

Dwarka, New Delhi

NHAI - OUTWARD

Page 240 of 246

Page 48: Jetpur–Somnath Project (NH – 8D) - Online PIU ...nhai.org.in/spw/ConcessionaireDetails/MPR June-14 Part-6.pdf · Major Bridge construction, Highway works & protection ... GAD

SR

NO.LETTER NO. SUBJECT Addressed to REMARKS

NHAI - OUTWARD

7JSTPL/2014/409

Dt: 12/06/14

Regarding usage charges of plant and machinery

for cost estimation purpose

CGM (T), RO(Guj),

NHAI, Gandhinagar

In Response to Letter No.

NHAI/PIU/RJK/Jet-Som/2014/D-1597 Dt: 30/05/14

NHAI/PIU/RJK/Jet-Som/2014/D-1598 Dt: 30/05/14

NHAI/PIU/RJK/Jet-Som/2014/D-1660 Dt: 30/05/14

8JSTPL/2014/410

Dt: 12/06/14

Update on pre-construction activities and urgent

actions required from Authority

DGM cum PD, NHAI,

PIU, Rajkot

9JSTPL/2014/411

Dt: 13/06/14

Underground crossing of Existing overhead

Electrical lines - 2nd RA bill of Jetpur Rural

subdivision

DGM cum PD, NHAI,

PIU, Rajkot

In Response to Letter No.

NHAI/PIU/RJK/PGVCL/2012/D-4363 Dt: 26/12/13

10JSTPL/2014/412

Dt: 13/06/14

Underground crossing of Existing overhead

Electrical lines - 1st RA bill of Junagadh

subdivision

DGM cum PD, NHAI,

PIU, Rajkot

In Response to Letter No.

NHAI/PIU/RJK/PGVCL/2012/D-4360 Dt: 26/12/13

11JSTPL/2014/413

Dt: 16/06/14

Reimbursement of 50% remuneration, cost &

Expenses of the Independent Engineer

DGM cum PD, NHAI,

PIU, Rajkot

In Response to Letter No.

NHAI/PIU/RJK/F&A/2014/D-1727 Dt: 04/06/14

12JSTPL/2014/414

Dt: 18/06/14

Regarding fortnightly action taken report

regarding according to review meeting held by

Member (Admn.) , NHAI at Gandhidham, Gujarat

on 12.04.2014

DGM cum PD, NHAI,

PIU, Rajkot

In Response to Letter No.

NHAI/PIU/RJK/NH 8D/2014/D-1809 Dt: 12/06/14

13JSTPL/2014/415

Dt: 23/06/14

Updates on pre-construction activities and urgent

action required form Authority - Atricles 5.1.4 ©,

10.3.4, 10.4, 11.2 & 11.4 of CA

DGM cum PD, NHAI,

PIU, Rajkot

In Response to Letter No.

NHAI/PIU/RJK/Jet-Som/2013/D-1370 Dt: 29/04/14

NHAI/PIU/RJK/Jet-Som/2014/D-1638 Dt: 30/05/14

Page 241 of 246

Page 49: Jetpur–Somnath Project (NH – 8D) - Online PIU ...nhai.org.in/spw/ConcessionaireDetails/MPR June-14 Part-6.pdf · Major Bridge construction, Highway works & protection ... GAD

SR

NO.LETTER NO. SUBJECT Addressed to REMARKS

NHAI - OUTWARD

14JSTPL/2014/416

Dt: 27/06/14

Reimbursement of 50% remuneration, cost &

Expenses of the Independent Engineer

DGM cum PD, NHAI,

PIU, Rajkot

In Response to Letter No.

NHAI/PIU/RJK/F&A/2014/D-1854 Dt: 17/06/14

15JSTPL/2014/417

Dt: 30/06/14Payment for Utility Shifting bills

DGM cum PD, NHAI,

PIU, Rajkot

In Response to Letter No.

NHAI/PIU/RJK/Jet-Som/2013/D-1685 Dt: 02/06/14

16JSTPL/2014/418

Dt: 30/06/14Regarding Wayside amenities

DGM cum PD, NHAI,

PIU, Rajkot

In Response to Letter No.

NHAI/PIU/RJK/2013/D-3786 Dt: 30/10/13

NHAI/PIU/RJK/Jet-Som/2013/D-1240 Dt: 15/04/14

NHAI/PIU/RJK/NH 8D/2014/D-1281 Dt: 21/04/14

ICT/IC/NHAI/IND/NH-8D/NHAI-PD/954 Dt: 16/04/14

17JSTPL/2014/419

Dt: 30/06/14

Request for Block time slots from Railway

authority for Launching of steel Girder at Rly km

76.45 (BG) and km 129.500 (MG) between

Navagadh and Teralsar Station near Jetalsar

Junction

DGM cum PD, NHAI,

PIU, Rajkot

Page 242 of 246

Page 50: Jetpur–Somnath Project (NH – 8D) - Online PIU ...nhai.org.in/spw/ConcessionaireDetails/MPR June-14 Part-6.pdf · Major Bridge construction, Highway works & protection ... GAD

MONTHLY PROGRESS REPORT – JUNE ’2014 Jetpur - Somnath Section of NH-8D

ANNEXURE-16

PROGRESS PHOTOGRAPHS

4 Laning of Jetpur - Somnath Section (Km.0.000 to 127.600) of NH-8D in the State of Gujarat on DBFO

Pattern under NHDP Phase III Page 243 of 246

Page 51: Jetpur–Somnath Project (NH – 8D) - Online PIU ...nhai.org.in/spw/ConcessionaireDetails/MPR June-14 Part-6.pdf · Major Bridge construction, Highway works & protection ... GAD

SITE PHOTOGRAPHS

Visit of Mr. B S Kapoor, Technical Advisor at Site

Visit of Mr. B S Kapoor, Technical Advisor at Site

Page 244 of 246

Page 52: Jetpur–Somnath Project (NH – 8D) - Online PIU ...nhai.org.in/spw/ConcessionaireDetails/MPR June-14 Part-6.pdf · Major Bridge construction, Highway works & protection ... GAD

SITE PHOTOGRAPHS

Celebration of World Environment Day

Celebration of World Environment Day

Page 245 of 246

Page 53: Jetpur–Somnath Project (NH – 8D) - Online PIU ...nhai.org.in/spw/ConcessionaireDetails/MPR June-14 Part-6.pdf · Major Bridge construction, Highway works & protection ... GAD

SITE PHOTOGRAPHS

Steel Girder for RoB 1 at Site Steel Girder for RoB 1 at Site

Fixing of RE Panel for RE Wall (Near FO at Ch. 0+780) Subgrade bed preparation in progress

Page 246 of 246