THE NEW FLOW
2
SQP FLOWS – 8D VERSUS KAIZEN
Containment
Action (by 36h)
Containment
Action accepted
Corrective
Action (8D Filled)
Corrective
Action accepted
Bill Closure
8D
KA
IZE
N
CNHI
2
3
4
5
6
Cluster creation
Bill Closure
Containment
Action (by 36h)
Transversalization
(FMEA,Control Plan)
Action plan proposal
8 stage proposal
PLAN
5W1H 4M ISHIK 5WHY
DO
ACT
Bill Opening and
Issue Description
with 5W1H
Robustness/Effectiveness
Evaluation
CHECK
PDCA REPORT
CNHI SUPPLIER
1
2
4
5
7
9
8
Action Plan
Validation
Cluster creation 0
SUPPLIER
0
ACT
8
CHECK 6
Bill Opening and
Issue Description
1
Containment
Action accepted
3
Final approval on
improved parts
3
CLUSTER CREATION
4
SQP FLOW – WHAT IS A CLUSTER ?
CLUSTER BILL
BILL
Weight
20
BILL
Weight
50
BILL
Weight
40
5
Cluster is a “folder”created previously to the bill
It contains the main information about Supplier and part number
Only after the Cluster opening, a bill will be created and linked to it
SQP FLOW – 0) CLUSTER CREATION
Cluster is a “folder”created previously to the bill
It contains the main information about Supplier and part number
Only after the Cluster opening, a bill will be created and linked to it
NOTE : Customer plant can choose the problem resolution process considered more suitable to the issue under investigation,
selecti g 8D or KAIZEN ode
6
BILL OPENING
7
SQP FLOW – 1) BILL OPENING
Bills having the same characteristics (same supplier, same part number or same
supplier production batch) must be linked to the same cluster.
This is valid for a period of 15 days from the cluster opening.
The Cluster Weight will be the highest weight assigned to the linked bills
A pop-up will help Customer Plant for a proper bill attribution redirecting to the right cluster.
CLUSTER BILL
BILL
Weight
20
BILL
Weight
50
BILL
Weight
40
CLUSTER BILL
WEIGHT 50
8
SQP FLOW – 1) BILL OPENING
After the cluster is opened, a bill can be created.
Clusters and bills will maintain a link, and the bill number will be constituted by
the cluster number + progressive number.
For example, if the cluster number is 2017000052724, the bill that will added will
have 2017000052724/0001.
9
SQP FLOW – 1) BILL OPENING AND ISSUE DESCRIPTION
In case of Kaizen mode is selected, Customer Plant has to insert the
mandatory 5W1H and, in addition, some specific attachments as photos
or other documents to support the analysis:
10
CONTAINMENT
ACTION
11
SQP FLOW – 2) CONTAINMENT ACTION
Supplier has provide a containment action by 36h for the Quality Bill and 24h
for the Logistics Bills.
Note: At the expiration of the allowed time, missing this communication, SQP will
issue an automatic Collaboration Bill - Item 19C.
12
SQP FLOW – 3) CONTAINMENT ACTION ACCEPTANCE
Customer will accept or reject the Containment action provided by Supplier.
In case no answer (acceptance or rejection of containment actions) is given by
Customer within 36 hours from the sending of the communication of containment
actions, the latter will be accepted implicitly and their acceptance will be
highlighted automatically in the SQP information system.
13
CORRECTIVE ACTION
(KAIZEN)
14
SQP FLOW – 4) KAIZEN PLAN - 5W1H
Supplier has to propose the 5W1H incident description from his side, in order
to clear up the factors influencing the non conformity.
15
SQP FLOW – 4) KAIZEN PLAN - 4M+5WHY’S
Once 5W1H study is completed, supplier must develop a 4M analisys
(including the application of 5 Why’s tool) through the usage of an SQP
integrated system, identifying primary and secondary causes.
16
Man
Method
Material
Machine
Op.std
compliance
Welding
Training
Mixing of
parts
Operation.
Sequence
Correct
labeling
Inadequate
labels
Conformity
to specs.
Torque
control Machine
Why 3 Why 4 Why 5
Man
Method
Material
Why 3 Why 4 Why 5
Identified root causes will fill
automatically an ISHIKAWA model
17
SQP FLOW – 4) KAIZEN PLAN - 4M+5WHY’S
SQP FLOW – 5) KAIZEN DO
The identified root causes (type and description) will be automatically
replicated into the first section of DO template. For each root cause the
supplier has to define a % weight and insert corrective action description and
break point in the second section of the DO template.
Supplier has to declare at which WCM stage he will go to set his process.
18
SQP FLOW – 6) KAIZEN CHECK (Customer)
Customer Plant CHECKS the proposed DO table filled by Supplier and :
accept or reject the action plan and the stage proposed by the supplier.
decides whether to request the ACT step
Note : when SQE validation is required, the SQE has the role to verify the
consistency of the implemented solution at supplier site 19
SQP FLOW – 7) KAIZEN CHECK (Supplier)
Once the solution is implemented (break point date reached), supplier shall
declare (third section of the template):
Effectiveness (Y/N) and Robustness (based on 5Qx0D analysis, to be
applied and attached)
20
SQP FLOW – 8) KAIZEN ACT (Customer)
If required by Plant (during the check phase), the workflow moves to the status
ACT. The system reproduces the fields already filled in by the supplier before. The
arrival date is related to the last break point filled in by supplier in the «DO» step.
The plant, checking the parts, inserts the ACT acceptance or rejection
21
22
5W1H Description of the phenomenon
WHAT Some wrong dimensions on the hub
WHEN Problem appears to occur in the
continuous running
WHO Problem affects all the shifts
WHERE Problem is found in the hub assembly
operation
WHICH No particular trend in the appereance of
the phenomena
HOW Equipment does not show any particular
deviation
Root Causes identified
Inadeguate labels
Mixing of parts
Description of the solution
Type Root Cause Weight Break point Corrective Action
Method1 Inadequate
labels
30% 03/07/2017 Visual management:
coloured labels and
versioning code
Men1 Mixing of parts 70% 29/06/2017 Dedicated welding
gigs for every lever
version
Target Stage 7
VERIFY RESULTS COMMENTS
Action Plan
Rejection Description Y
SQE Validation Request
Act Requested
Stage Validation Y
Rejection Description
COMMENTS
FMEA Reviewd Y
Control Plan reviewd Y
Action Transversalized Y
Pieces arrived Y
ACT acceptance Y
Reject reasons
Project leader Starting Date: Implementation team: Completion Date: Costs: Benefits Results: Benefit/Cost Verification:
STANDARD KAIZEN / PDCA
REVISION REQUEST
23
REVISION REQUEST
Foreword (08018 norm – Chapter 5.5)
Supplier assuming not to be responsible for the non-conformity can ask for :
- the Bill Cancelation through specific template available in the SQP system
- Non Conforming Quantity Review, proposing a different value in the
specific template available in the SQP system (for example, after sorting
activity at supplier site)
Warning - Lexical change !
Bill total cross out Bill cancelation
Bill partial cross out Quantity Review
!
24
Bill cancelation can be asked by supplier trough specific SQP template going
through
Then the «cancelation» mode has to be flagged.
Plant Manager Accepts or Refuses the proposal
– –
REVISION REQUEST – BILL CANCELATION
25
QUANTITY REVIEW REQUEST FROM SUPPLIER SIDE
• Supplier proposes the quantities to decrease from the total on the Cluster (with
impact on the PIQ).
• Plant Manager handles the revision request at bill level:
• Plant Manager Accepts or Refuses the proposal
REVISION REQUEST – QUANTITY MANAGEMENT REVIEW
26
QUANTITY REVIEW REQUEST FROM SUPPLIER SIDE
• Plant Manager, in case of acceptance, can modify the supplier proposal
• Accepted quantities feed the «Manage Quantity» template with specific
item, with specific item in order to remark that they are consequence of a
review
• In «NC QTY REVIEW» mode the bill flow proceeds normally (status is not
CANCELED and – if the bill is the heaviest in the cluster – can have
impact on the PIQ)
REVISION REQUEST – QUANTITY MANAGEMENT REVIEW
27
Quantity management template follows an ascending time line going from
the oldest (down) to the latest event (up).
REVISION REQUEST – QUANTITY MANAGEMENT
28
Special features:
• Additional or decreasing quantities can be inserted from plant at any time;
• It is not possible to decrease quantities bigger than the last NC showed on the
top left of the template
• It is mandatory to insert one item for every line. In case of quantity
adjustement accepted by plant, the item description appears automatically.
• The list of the items is shown here:
01. Initial NC quantity
02. Plant adjustment after sorting
03. Bill related to new defect
04. Cross out requested by supplier
05. Bill cancellation request by supplier
06. Batch quantity reviewed
REVISION REQUEST – QUANTITY MANAGEMENT
29
Time line: from the latest event
(up) to the oldest (down)
NC for PPM
In qty insertion the item is
mandatory
Additional or decreasing quantities can be inserted;
it is not possible to decrease quantities bigger than
the last NC showed on the top left of the template. Compulsory notes
REVISION REQUEST – QUANTITY MANAGEMENT
30
REVISION REQUEST – QUANTITY MANAGEMENT
Quantities shown in the CLUSTER are :
• Nc (for PPM)
• Accepted reviewed qty
• Returned qty
as in the first line of the «Manage
Quantity» template
31
SQP Revision – automatic checks
• NC Quantities are inserted only from Quantity Management module in SQP
• CANCELED Quantities, once accepted by Plant, come automatically from the
Revision Request form into the Quantity Management module and are not editable
• RETURNED Quantites are inserted into the Quantity Management module
AUTOMATIC CHECKS INTO THE QUANTITY MANAGEMENTS MODULE
1. Quantity review si referred to the Cluster
2. Supplier proposed quantities can never exceed the quantities in the cluster at
that moment
3. Plant accepted quantities can be different from what proposed by Supplier
REVISION REQUEST – QUANTITY MANAGEMENT
32
REVISION REQUEST FORM (ex Cross-Out)
33