National Aeronautics and Space Administration
www.nasa.gov
Collaborative Multi-Center Implementation of NPR 7123.1A
Phillip HallNASA MSFC
Nancy McNelisNASA GRC
1Used with Permission
National Aeronautics and Space Administration
www.nasa.gov
Can Centers Develop “Common” Processes?
• Common Goal is Compliance with NPRs– NASA Procedural Requirements Establish “What” NASA
HQ Expects of the Centers– Center Level Procedural Requirements Establish “How” it is
Done at that Given Center
• Centers Do Not Have Common Organizational Structure
• NPR 7120 Series is Project Focused, Not Organizational Focused
The Question Then Becomes …• Is the Project Structure from Center to Center Similar
Enough to Allow “Common” Processes?2
National Aeronautics and Space Administration
www.nasa.gov
Can Centers Develop “Common” Processes?G
RC T
ypic
al P
roje
ct S
tru
ctu
re
WBS01Project Manager
Deputy PM
Project Chief Engineer
WBS03Safety & Mission Assurance
Chief Safety Officer
WBS01Business Support Office
Project Support Staff
WBS02Systems Engineering
Lead Systems Eng
WBS04Element 4
Element Lead
WBS05Element 5
Element Lead
WBS (n)Element (n)
Element Lead
WBS (n)Element (n)
Element Lead
Matrix from Space Flight Directorate
Matrix from S&MA
Matrix from Engineering Directorate
Matrix from Other Directorates
3
National Aeronautics and Space Administration
www.nasa.gov
Can Centers Develop “Common” Processes?
4
MSF
C T
ypic
al P
roje
ct S
tru
ctu
re
NASA AdministratorDeputy Administrator
Associate AdministratorNASA Chief Engineer
MSFC Center Director
MSFC Eng Director
Mission Directorate AA
Program Manager
MSFC Eng Deputy Directors - Senior Eng Management PresenceProgram assigned
MSFC DeputyProgram Manager
Project Manager
MSFC Chief EngManager
MSFC EngDept/Lab Managers
MSFC EngDivision Chiefs
MSFC EngBranch Chiefs
MSFCInstitutional Eng
Cen
ter D
isci
plin
e Le
ads
Inde
pend
ent R
evie
ws
MSFC ProgramChief Eng*
MSFC ProjectChief Eng
MSFC Chief EngManager’s Staff
Independent Reviews
Direct Report
Program AuthorityTechnical Authority
Senior Eng Presence
National Aeronautics and Space Administration
www.nasa.gov
Common Goals
• Comply with NASA Procedural Requirements (“What”)– Requirements traceability from NPRs to Center Level Procedures
• Provide Sufficient Detail (“How”)– Outline a Step by Step Process of “How” for Project Execution– Define Roles and Responsibilities of the Project Teams– Incorporate Best Practices– Provide Commonality on How Projects Conduct Business within the
Organization
• Prevent Shelf-ware Mentality– Provide Forms/Templates for Project Use
• Templates which are Annotated Outlines of Project Documentation • Forms which are Available Electronically
5
Develop “Common” Processes for the Organizations Rather Than on a Program/Project Basis
National Aeronautics and Space Administration
www.nasa.gov
Achieving Common GoalsWhere We’ve Been?
• Minimal Confidence in Project Planning and Estimates because assumes LOE-based rather than Task-based
• Lack of “Standard Toolbox”– Inconsistencies in Deliverables and Products– Results in a lot of re-work
• Project-by-Project Approach Rather than Institutionalized
• Unclear Use of Best Practices and Lessons Learned
6
National Aeronautics and Space Administration
www.nasa.gov
Achieving Common GoalsWhere Are We?
• GRC– Organized Management Steering Group in 2007– Defined and Documented Development Approach– Obtained Executive Sponsorship and Organizational Buy-in– Began Collaborative Development with MSFC– Launched the Space Mission Excellence Program for Systems
Engineering in 2006
• MSFC– Organized Engineering Directorate Management Steering Group in
2008– Leveraging Work Defined at GRC– Gaining Executive Sponsorship and Organizational Buy-in– Working with Office of Strategic Analysis and Communications
(OSAC) to tie into Project Management– Introduction to the MSFC Systems Engineering Leadership
Development program7
National Aeronautics and Space Administration
www.nasa.gov
GRC Procedural Requirement DocumentsG
RC D
evel
op
men
t &
Imp
lem
enta
tion
GLPR7120.5.10GRC Space Flight Projects
Formulation & Implementation Requirements
- Text in Doc -Operations & Sustainment
SafetyGLPR 8700.4Safety & Mission
Assessment
Reliability & Maintainability
GLPR 1270.1Corrective & Preventative
Action
Quality Assurance
SM&A (NPD 8700.1)
GLPR 7120.5.30Safety & Assurance Requirements (SAR)
GLPD 1410.2GRC Doc
Management
-Text in Doc-Center Doc Training
GLPR 8730.5Quality System
Manual
GLPR7120.5.20 Deviations & Waiver
Center Mgmt (NPR 1400.1)GLPR 1410.1
GRC Directives Management
GLPR 1410.3Lower Level
Document Mgmt
Engineering Management (NPR 7123.1)
GLPR 7123.22Verification &
Validation
GLPR 7123.21Product Transition
GLPR 7123.23Implementation &
Integration
GLPR 7150.1Software
Engineering Requirements
-Text in Doc-6 Sections in
GLPR7120.5.10
GLPR 7123.37Decision Analysis
GLPR7120.0.4Risk Management
GLPR 7123.36Engineering
Review Board
GLPR 7120.5.40GRC Project and
Technical Planning
GLPR 7123.34Project Config Item
& Data Management
GLPR 7123.34Project Config Item
& Data Management
GLPR 7123.35Project Technical
Reviews
GLPR 7123.11Requirements Def
& Mgmt
GLPR 7123.12Design
Solutions
GLPR 7123.32Interface
Mgmt
Program/Project Management (NPR 7120.5)
GLPR 7123.34Project Config Item
& Data Management
GLPR7120.5.43Acquisition
GLPR7120.5.42Management
Reporting
GLHB-B-7120.1EVM System
Handbook
Text in Doc10 Sections in
GLPR7120.5.10
GLPR7120.5.41Project Review
Board
GLPR 7120.0.6Lessons Learned
GLPR7120.5.40GRC Project and
Technical Planning
GLPD7120.1EVM
https://knowledgeshare-in.grc.nasa.gov/eRoom/NASAc1f1/GRCProjectandSERequirementsWebContent
8
National Aeronautics and Space Administration
www.nasa.gov
Standard GLPR Architecture
Project Objective
Processes
Activities
Tasks
Project Requirement
Work Products
Process Deliverables
Project Deliverables
Components
Project Results
N PR’s Define “What”
GL PR’s Define “How”
at GRCConcepts
Techniques
Templates
Forms
Lessons Learned
Best Practices
GRC
Dev
elo
pm
ent
& Im
ple
men
tatio
n
9
National Aeronautics and Space Administration
www.nasa.gov
Standard GLPR Formatting
Activity (Sub-chapter level designee)Grouping of tasks that create a logical deliverable (or group of deliverables)
Flow chart WITH SWIMLANESGraphical illustration relationships of the tasks within an activity
Task (Sub-Sub-chapter level designee)Title of specific work to be performed necessary to build the deliverable. Should follow the Verb-Noun format
Task Descriptor (Letter designee)Specific description of work performed necessary to build the deliverable. • Should begin with the responsible roleWill contain Shall statements if applicable.
Additional Guidance (Not shown)Addition information provided to help the responsible person perform this task
GRC
Dev
elo
pm
ent
& Im
ple
men
tatio
n
10
National Aeronautics and Space Administration
www.nasa.gov
GLPR Development Procedure
• Identify New Processes or Revision
• Assign Resources
• Use Std Templates
• Leverage SMEs
• Draft Process Flow
• Draft GLPR Document
• Completed GLPR submitted to BMS
• Formal Inspection Process
• Feedback Provided to Inspectors
• Peer Review is Initiated
• Owner Reviews High Level Process
• GLPR Finalized
Identify and Document Procedure
3.1
Owner Review (CEO, M, Q, etc.)
3.2
Peer Review
3.3
MSGInspection
3.4
Executive Presentation
3.5
BMS Submittal
3.6
• Formally Manage Document
• MSG Will Determine Executive Review Readiness
• MSG Leads Will Determine MSG Inspection Readiness
• Owner Review and Concur
• Pre-MSG Inspection Readiness
• Present Completed document to Executives
• Pilot Approved Processes
• Executive Awareness
Success Criteria
GRC
Dev
elo
pm
ent
& Im
ple
men
tatio
n
11
National Aeronautics and Space Administration
www.nasa.gov
GLPR Development StatusG
RC D
evel
op
men
t &
Imp
lem
enta
tion GLPR # Document Name Owner
Review Peer Review MSG Inspection
Executive Review
BMS Status
Wave One
7123.36 Engineering Review Board (ERB) Complete Complete Complete Complete GLPR
7123.35 GRC Project Technical Reviews Complete Complete Complete Complete GLPR
7123.11 GRC Requirement Development and Management Process
Complete Complete Complete Complete GLID
7120.14 Waivers/Deviations Process Complete Complete Complete Complete Not Submitted
7120.5.40 Project and Technical Planning Complete Complete Complete Complete GLPR
7123.22 Product Verification and/or Validation Complete Complete Complete Complete GLID
7123.34 Data and Configuration Management Complete Pending TBD 1/19/10 Not Submitted
7120.5.10 Space Flight Project Requirements Complete Complete Complete Complete GLID
7123.37 Decision Analysis Complete Complete 10/20/09 11/20/09 Not Submitted
7120.5.41 Project Review Board (PRB) Complete Complete Not Applicable Complete GLPR
7120.5.42 Management Reporting Complete 10/30/09 11/16/09 1/14/10 Not Submitted
7123.33 Risk Management Complete Complete KO 12/7 TBD Not Submitted
7120.5.30 Space Assurance Requirements (SAR) Complete Complete Complete Complete GLPR
8700.5 Problem Reporting and Resolution Complete NA NA NA Not Submitted
7123.32 Interface Management TBD TBD TBD TBD Not Submitted7123.21 Product Transition Wave 3 Wave 3 Wave 3 Wave 3 Not Submitted7123.23 Product Imp and Integration Wave 3 Wave 3 Wave 3 Wave 3 Not Submitted7120.xx EVM Wave 3 Wave 3 Wave 3 Wave 3 Not Submitted7120.5.43 Project Acquisition Wave 3 Wave 3 Wave 3 Wave 3 Not Submitted7123.12 Design Solutions Wave 3 Wave 3 Wave 3 Wave 3 Not Submitted7123.41 Design and As-Built Wave 3 Wave 3 Wave 3 Wave 3 Not Submitted
Review Gates
12
National Aeronautics and Space Administration
www.nasa.gov
MSFC Doc Tree – BeforeNPR 7123.1
NASA Systems Engineering Processes and Requirements(Requirements [68] / Processes [17] / Best Practices [105] / Reviews [16])
MPR 7123.1 MPR 7123.2MSFC Systems Engineering Technical Reviews and Review Item Discrepancy (RID)
Processes and Requirements Processing, MSFC Programs and ProjectsRequirements [68] / Processes [17] / Best Practices [105] (Reviews [16]) + MSFC RID Process
AS42/Jeff Moore ED10/Phillip Hall PS01/Felecia Wilson ED10/Phillip Hall QD40/William Powell ED11/Amy Hemken ED11/Amy HemkenMWI 6410.1 MWI 8050.1 MPR 5000.1 MWI 7123.1 MWI 7120.6 MPR 8040.1 MWI 7120.2
Handling, Storage, Verification and Purchasing Reqts Development Prog/Proj Risk Configuration Data ReqtPackaging, Preserv., Validation of EM03/Patricia Johnson and Management Mangement Management Ident. / Def
and Delivery (HSPPD) Hardware, Software, MPR 1280.2 (5 of 17 Processes) DA01/Mary Demurray ED11/Eugena Goggansand Ground Support Process Control MPR 1280.1 MWI 7120.4Equipment for MSFC PS01/Felecia Wilson Management Doc. Prep.
MWI 5100.1 Review Prog/ProjInitiating Proc. Req.EI41/Ronie Akins
MWI 1280.1Mechanical Fab.
Request InstructionsSystem Design Processes
1 - Stakeholder Expectations Definition Process2 - Technical Requirements Definition Process3 - Logical Decomposition Process
*4 - Design Solution Definition Process
Product Realization Processes
5 - Product Integration Process
*6 - Product Implementation Process
7 - Product Verification Process8 - Product Validation Process
9 - Product Transition Process
Technical Management Processes
*10 - Technical Planning Process
11 - Technical Requirements Management Process* = 4 additional MWI's needed [4, 6, 10 & 17] 12 - Interface Management Process
13 - Technical Risk Management Process
Existing MWI's replacement [in future] 14 - Configuration Management Process
15 - Technical Data Management Process
16 - Technical Assessment Process
*17 - Decision Analysis Process
We developed 3 MSFC documents to fill in the gaps
shown by the initial compliance analysis
MSF
C D
evel
op
men
t &
Imp
lem
enta
tion
13
National Aeronautics and Space Administration
www.nasa.gov
MSFC Doc Tree - ProposedNPR 7123.1
NASA Systems Engineering Processes and Requirements( Requirements [68] / Processes [17] / Best Practices [105] / Reviews [16] )
MPR 7123.1MSFC Systems Engineering Processes and Requirements( Requirements [68] / Processes [17] / Best Practices [105] )
MPR 7123.2Technical Reviews and Review Item Discrepancy (RID)
Processing, MSFC Programs and Projects( Reviews [16] ) + MSFC RID Process
Specific Practice
Templates
Checklists
Forms
Roles & Responsibilities
Process Metrics
Technical Management Processes
Product Realization ProcessesSystem Design Processes
MWI 7123.1MSFC Systems Engineering Processes
MSE 7123.1Stakeholder Expectation Definition
MSE 7123.10Technical Planning
MSE 7123.2Technical Requirements Definition
MSE 7123.3Logical Decomposit’n
MSE 7123.4Design Solution Definitions
MSE 7123.11Requirement Management
MSE 7123.12Interface Management
MSE 7123.13Technical Risk Management
MSE 7123.14Technical ConfigManagement
MSE 7123.15Technical Data Management
MSE 7123.16Technical Assessment
MSE 7123.17Decision Analysis
MSE 7123.5Product Implementat’n
MSE 7123.6Product Integration
MSE 7123.7Product Verification
MSE 7123.8Product Validation
MSE 7123.9Product Transition
MSF
C D
evel
op
men
t &
Imp
lem
enta
tion
14
National Aeronautics and Space Administration
www.nasa.gov
Content Structure
15
MSF
C D
evel
op
men
t &
Imp
lem
enta
tion MWI 7123.1 MSE 7123.1
MSE Process
NASA SE Engine
1 MSE for each of the 17 SE Processes
MWI Groups the 17 SE Processes
MSE 7123.2
MSE Process
MSE Primary ContentProcess Overview
Process Objectives
Process Metrics
Points to ToolboxesSpecific Practice (steps) (including R&R)
Templates
Checklists
• MWI 7123.1 will contain information common to all MSEs
• MSEs set the standards for complying with NPR 7123.1 requirements
• Process metrics to allow for continuous improvement
• Specific Practices will contain recommended implementation guidance
• Augmented by toolbox containing templates & checklists
• Format allows for seamless import into SEG
National Aeronautics and Space Administration
www.nasa.gov
(1) Perform Literature Search
(2) Develop Process Flow
(3) Review Process Flow
(4) Review with Stakeholders
(5) Develop Document
Collect and outline industry and SE discipline best practices.
Develop top-level data flow for the MSE and IDEF0 for the Specific Practices.
Internal review of proposed process flow.
Coordinated effort to obtain stakeholder buy-in on how MSFC is going to proceed in doing business
Develop detailed content for the MSE and Specific Practices.
(6) Develop Toolbox
(7) Conduct Mgmt Inspection of Doc
(8) Finalize Document
(9) Implement into SEG
(10) Submit Doc for Formal Release
Develop the associated Templates and Checklists (artifacts)
Conduct internal review within ED10 and applicable stakeholders (e.g., a pre-established review team of SMEs to review and provide comments on each MSE before finalizing
Incorporate Review Team comments
Post and make content available to MSFC programs & projects
Update SEG, as required
MSFC Procedure
16
MSF
C D
evel
op
men
t &
Imp
lem
enta
tion
National Aeronautics and Space Administration
www.nasa.gov
MSFC Systems Engineering Framework
17
MSF
C D
evel
op
men
t &
Imp
lem
enta
tion Process Tools Training People Time
Agency NPR’sNID’s, etc.
NENMBSE
APPELNPR Training
Human CapitalStrategy &
Investments
National VisionMission NeedsAgency Goals
Mar
shal
l Inc
MSFC Enterprise
DCB, DGAProcesses
RID, ICEAPPEL
UAH, etc.CMS
Center StaffCenter Goals &
Missions Objectives
SMASafety/Reliability St
andardsQuality Standards
ARM/IRMA (Risk)Reliability & Other Analytical Tools
SMA Specialty Courses
Integrated Staff w/in
Programs/ProjectsProduct Life-Cycle
Programs/Projects
7120 ProcessesARM/IRMA (Risk)
ScheduleEVM
APPEL Project Offices Product Lifecycle
Engineering 712317 Processes
SEG, Cradle,DOORS
SE Leader Development
ProgramAPPEL
Engineering Directorate
System Lifecycle
DesignDomain Processes
(Bluebook)CAD/Pro-E, EMC,
MAT LabCDMS, Thermal
APPELLine EngineersLab Personnel
Major Milestones
Across Centers
National Aeronautics and Space Administration
www.nasa.gov
Achieving Common GoalsWhere Are We? (Continued)
• Establish MOU Between GRC and MSFC Focused at Developing “Common” Center Level Procedures
• Benefits of the Collaborative Effort Between GRC and MSFC– Establishing common terminology and definitions– Consistency in process steps leading to product and design
solutions with tighter integration – Consistency in templates and checklists leading to less time
to translate between common products – Better understanding of process interrelationships, leading to
more efficient analysis of inputs and outputs that support other teams
– Consistency in the quality of work products or artifacts– Better understanding of each centers’ governance processes
and associated roles & responsibilities
18
National Aeronautics and Space Administration
www.nasa.gov
Achieving Common GoalsWhere Are We? (Continued)
• Specific Goals and Objectives of the Collaboration:
– Review of current development processes – Share development processes and tools– Provide access to or make center procedural requirement
documents available– Create a common Project Asset Repository– Participate in each other’s peer reviews– Participate in each other’s procedural formal inspections– Co-develop (and delivery) training, communication,
continuous improvement and plans
19
National Aeronautics and Space Administration
www.nasa.gov
Achieving Common GoalsWhere Do We Want To Be?
• Institute a Holistic, Systems Approach to Develop Procedures and Processes within NASA– Gain Consensus Between Multiple Centers to Accomplish
Common Goals– Build Sponsorship from the Respective Engineering
Directorates– Leverage the Collective Intellect Across NASA– Common workforce development strategies for Systems
Engineering
• Define, Develop and Maintain Consistent Capabilities and Competencies Across NASA
• Provide Process to NASA Enterprise Architecture
20
Key to Fostering Future Collaborative Programs/Projects between NASA Centers
National Aeronautics and Space Administration
www.nasa.gov 21
Questions
National Aeronautics and Space Administration
www.nasa.gov 22
Back Up
National Aeronautics and Space Administration
www.nasa.gov 23
National Aeronautics and Space Administration
www.nasa.gov
Iterative Nature of MSFC System Design Process
24
MSE 7123.4
Design Solutions Definition
MSE 7123.3
Logical Decomposition
MSE 7123.1
Stakeholder Expectations
Definition
(1.2) Identify Later MSE 7123.3 Process Artifact (Output)
Technical Requirements
Definition
Allocated Reqs
Derived Reqs
MSE 7123.2
(2.2) Use insight from Later MSE 7123.3 Artifact (as Input) to Update Earlier Artifacts
Itera
te(3.1) Updated Earlier Artifacts Drives Updates to Later Artifacts
Typical Artifacts• Stakeholder
Expectations• MOEs• ConOps• Context Diagram• Design Reference
Mission• Mission Phase / Sub-
Phases• Operational Scenarios• States & Modes• Enabling Product
Support Strategies
Typical Artifacts• Physical Architecture
(top level showing Context Diagram)
• Functional Architecture (top level)
• Operational Architecture (complete)
• MOPs• TPMs• Technical Requirements
(top level)
Typical Artifacts• Physical Architecture
(decomposed-complete)• Functional Architecture
(decomposed-complete)• Derived Technical
Requirements (decomposed - lower levels)
Typical Artifacts• System-Specified
Requirements• End-Product-Specified
Requirements• Initial Subsystem
Specification• Enabling Product
Requirements• Product Verification Plan• Product Validation Plan• Logistics and Operate
To Procedures
(1.1) Identify Later MSE 7123.2 Process Artifact (Output)
(1.3) Identify Later MSE 7123.4 Process Artifact (Output)
(2.1) Use insight from Later MSE 7123.2 Artifact (as Input) to Update Earlier Artifacts
(2.3) Use insight from Later MSE 7123.4 Artifact (as Input) to Update Earlier Artifacts
(3.2a) Updated Earlier Artifacts Drives Updates to Later Artifacts
(3.2b) Updated Earlier Artifacts Drives Updates to Later Artifacts
Itera
te
Itera
te