The Juran Trilogy

Preview:

DESCRIPTION

Powerpoint Presentation- The Juran Trilogy

Citation preview

THE JURAN TRILOGY

JOSEPH M. JURAN

"It is most important that

top management

be quality-minded. In the

absence of sincere

manifestation of interest at the top, little will happen

below."

“Fitness for intended use.“

-J.M.Juran

The Juran Trilogy

• Quality Planning

• Quality Control

• Quality Improvement

1) Quality Planninga) Identify the customers

Use: Pareto Diagram-Vilfredo Pareto-”vital few” and “useful many”

b) Determine the customers’ needs.

REAL NEEDS VS STATED NEEDS

i) Being a user of the product or service

ii) Communicating with customers through product or service satisfaction and dissatisfaction information and ;

iii) Simulation in the laboratory

c) Develop a product whose features align with the customers’ needs.

i) Quality function deployment ( QFD)

• Planning tool used to fulfill customers satisfaction

ii) Taguchi's quality engineering (TQE)

• An approach to engineering that emphasizes the roles of research and development, product design and product development in reducing the occurrence of defects and failures in products.

iii) Concurrent engineering (CE)

• also known as simultaneous engineering, is a method of designing and developing products, in which the different stages run simultaneously, rather than consecutively

d) Develop processes that are capable of producing such products

f) Transfer these plans to the operating forces

e) Establish quality controls.

2) Quality Control

(1)Evaluate actual operating performance

(2)Compare actual performance to goal

(3) Act on Difference

Statistical Process Control (SPC)•Histograms

Control charts

Scatter diagrams

Flow Charts

Cause and Effect , Fishbone, Ishikawa Diagram

Check Sheets

3) Quality Improvementi) Establish the infrastructure needed to

facilitate the continuous quality improvement.

ii) Identifies the project improvement.

iii) For each project, establish the team that is clearly in charge with the responsibility of bringing a successful resolution to the project.

Recommended