Upload
trandien
View
214
Download
0
Embed Size (px)
Citation preview
ONE STOP SHOPPalle Samagra Seva Kendram
Digital Telangana
• One stop providing a vide variety of services at the GP level– MeeSeva about 60 services– e-Panchayat Services- property tax, UBD etc,– Financial Services – Banking and Insurance– Pensions, EGS and other DBT payments
• Many other citizen services can be offered• Immense scope for expanding activities• Grievance Redressal Mechanism for the government• Could be used as WIFI hot spots making intenet
available in the villages
OSS – Service
Existing BC of Banks
• Driven by RBI – financial inclusion
• Very low Cash credit limit ranging from Rs. 5000/ to 10,000 per day
• More than often the BC is made to sit at the branch level as an additional staff to cope up with bank related work
• Objectives not fully realized
• Limitations on cash credit limit
4
OSS KIOSK
MeeSeva Services Gateway
SECR
INTERNET
Revenue
Registration
Civil Supplies
Agriculture
UBD …..
Citizen Service Delivery
Existing Scenario Mee Seva
5
Operator
Panchayat Raj & Rural Development Departments
INTERNET
NREGA
Pensions
Property tax
UBD …..
Existing Scenario ( PR & RD)
Citizen Service Delivery
6
Banking Correspondent
Stree Nidhi
INTERNET
Banking
Existing Scenario ( Stree Nidhi)
OSS
7
OSS KIOSK
MeeSeva Services Gateway
INTERNET
Revenue
Registration
Civil Supplies
Agriculture
UBD …..
Citizen Service Delivery
Panchayat Raj Department
Rural Development Department
Stree Nidhi
Functional Architecture of OSS – integration of
services
APOnlineSCA
INTERNET
OSS Integration with Service Providers
H/W INFRASTRUCTURE for OSS
9
OSS Infrastructure Servers Requirement Details
S.No. Servers Assigned Hardware Configuration Software
1Application Server –
Production
8 Core CPU, 16 GB RAM, 300 GB
HDD
Windows Server 2008 R2,
Visual Studio 2010
Professional
2Database Server –
Production
12 Core CPU, 64 GB RAM, 600
GB HDD
Windows Server 2008 R2.
SQL Server Std.
3Application & DB Server -
Testing
8 Core CPU, 32 GB RAM, 600 GB
HDD
Windows Server 2008 R2,
SQL Server Std., Visual
Studio 2010 Professional
4Backup Management
Server
8 Core CPU, 12 GB RAM, 1TB
HDD, Windows
Windows Server 2008 R2
OS
What is envisaged as OSS
To bring the three departmental services under oneportal with a single sign in Development of new portal for OSS with content Integration of OSS with the three existing
applications of Mee Seva, PR&RD and Stree Nidhi New Hardware for OSS, wherever required will be
financed by Stree Nidhi A new pre paid wallet mechanism is developed.
OSS - VLE
• Village Level Entrepreneur selected from amongst the educated self help group women
• Capex and Opex to be borne through a loan to be paid by the VO
• The loan is released to the Village organization as the business in the OSS is a prepaid cash business
• Disbursement and loan payments/ transfers • Average cash requirement per day will be the
basis for loan transfer• Average earning 5000- 10,000 net per month
OSS –ROAD MAP
Stree Nidhi an apex cooperative federationpromoted by Govt. and federations of SHG isfunctioning as BC to banks in 274 GPs.IT infrastructure will be funded by Stree NidhiOpened OSS centers in 104 GPs on 2nd October 2015integrating banking, Meeseva and e-Panchayatservices To open OSS Centres in 1000 GPs across the statewhere Broadband connectivity is available.Net connectivity is being addressed with
Wi-max technologyVSATsInternet through MSOs
CAPEX.
Particulars Amount (in Rs.)
Laptop 30000
Printer & Scanner 10000
Biometric 4000
IRIS 10000
Inverter 25000
PoS 20000
PIN pad – Card Swiping 6000
Accessories 1000
Furniture 5000
Display board 3000
Token Key (MeeSeva) 600
Internet Connection 35400
Total 150000
Particular Per Month Per Annum
Internet 1000 12000
Electricity Bill 300 3600
Stationary 300 3600
Office Rent 300 3600
Digital Signature 65 800
Miscellaneous 250 3000
Total 2215 26600
OPEX.
VLE has to maintain settlement A/c, and Stree Nidhi will provide settlement amount as loan
VLE Identification and Criteria• OSS are operated by VLE who is a SHG member
identified based on the following criteria.
– SHG woman member-SC/ST preferable
– Above 21 years age
– Minimum 12th qualification i.e. passed
– Permanent resident of the village
– Credit history
– Bank does the background verification by due
diligence
• VLEs are trained in a four day module
Cash Management
• VLE opens a settlement account with link branch-loan from Stree Nidhi wherever required
• Cash Management is Outsourced- Transit and fidelity insurance
• Transactions up to the amount in settlement account
• Transactions by VLE
– Amount deposited with VLE is debited from her settlement account
– Amount Paid by VLE is credited to her settlement account
• MeeSeva- Fee amount received by VLE isdebited from VLE A/c
VLE Login to BC Application
VLE biometric authentication at banks FI or
AADHAR server
Transaction selection
CIF No / AADHAR
authentication
A/c details display
Transaction particulars entry
Transaction authentication using Biometric
Money received by VLE
VLE A/c is debited
Customer A/c is credited
Receipt is printed
BC Transaction process – CASH Deposit
MeeSeva / e-Panchayat - Transaction Process
Access to MeeSeva portal
Service request is raised on behalf of Customer
Customer pay money at OSS
VLE transfers the money to ESD
ESD will share the remuneration between VLE and Stree Nidhi
• Electronic wallet for certain amount is created
•The transactions of Meesevacan be done upto wallet limit
• The settlement structure is decided
•Utility payments can also be made
Finance module
• VLE at OSS will be collecting the amounts from thecitizens towards services for MeeSeva, PR&RD, StreeNidhi.
• These amounts have to be shared between theparticipant departments along with reconciliation ofevery transaction.
• OSS portal will push the collections of PR&RD and StreeNidhi bank for the services rendered through theirapplications into two bank accounts to be opened bythem.
• Transaction commission will be paid to VLEs in specific intervals by banks
• Commission depends on type of transaction
• Earns service charges from Meeseva, e-Panchayat and NREGS works
• VLE earns net income of about Rs. 5000 per month to Rs. 10,000
• The OSS is a self sustainable enterprise
Viability of OSS
Role of Panchayat and VOs
• Ensure transparency by collaborating with Panchayat and VO
• Role
– Monitoring functioning of VLE
– Addressing grievances, if any
– Verification of books maintained by VLE
– Safeguarding the Infrastructure
Monitoring and MIS
• Sourcing data from different modules for analytics purpose
• Need based MIS for monitoring banking, Meeseva and other transactions
• One staff for 50 OSS centers are palced
BRANDING of OSS
• Display Board
• Interior
• Furniture
• Display material inside OSS
• Logo and tag line
• Location within the Gram Panchayat
Challenges
• Connectivity is the biggest challenge!
• Currently OSS is in places with Broad Band Connectivity
• Exploring other places with VSAT; Air Jaldi; Reliance Leased line and other new technologies
• Access would mean better delivery and governance at the lowest tier of the Government
NOFN and its relevance
• Enhance connectivity
• Multiple services – video broadcasting ; videoconferencing
• Can be used as a local WIFI hot spot giving access to people and institutions as a business model
• Access to a host of internet enabled strategies in education and health
NOFN and Telangana
• NOFN laid in one Mandal but terminal equipment still to be put in place
• Telangana is rolling out the Telangana Drinking Water Supply project
• 1.50 kms of pipelines to surface water to all the habitations across the state– Rural (100 lpcd); municipality (135 lpcd) and
Municipal Corporation (150 lpcd)
• Cost around 40,000 crores• Optic fiber proposed to be laid to connect all
households